Functional interfaces

Slides:



Advertisements
Similar presentations
Superconducting Spoke Resonator Cavities and Cryomodules
Advertisements

ESS Cryogenic System Design
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina, January 21,
ESS cavities interfaces
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
1 ESS Cryogenic regulation loops proposal  Thermal shield  Power Couplers double-wall  CM cool down  Stand by and nominal operation  CM warm up Bertrand.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
ESS Cryogenic Distribution System for the Elliptical Linac CDS Heat Loads Calculations Preliminary Design Review Meeting. 20 May ESS. Lund. Sweden.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
The SPL Short Cryo-module: Status Report V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team SPL seminar December 2012, 6-7 December 2012,
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Accelerator/Elliptical Cavities Cryomodules Pierre BOSLAND, CEA Saclay External WP5 leader Christine Darve, ESS deputy WP leader
Overview of the ESS Linac Cryogenic Distribution System
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Spoke Cryomodules Sébastien BOUSSON (IPNO), Christine DARVE (ESS) On behalf of the CNRS/IPNOrsay and ESS teams April, 2016.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain la Neuve 17-18/04/2013 Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Final Design Cryogenic and mechanical configurations
Teleconf ACS – FREIA 28th March 2017
CERN – Zanon discussions
Cryomodule test stand at ESS site
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
IT-4189 Supply and installation of a cryogenic distribution system
at STFC Daresbury laboratory
Medium beta cryomodule demonstrator M-ECCTD
T5.2: Harmonization - Material and Component Reference
Spoke Cavity Power Coupler for the European Spallation Source (ESS)
Uppsala Commitment to ESS and FREIA Planning
SPS cryogenic proximity equipment and SM18 validation
LARP Vertical Test Facility
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
ESS RF Development at Uppsala University
Cryogenic C&C Scope of work
Status of the cryogenic system for B180
UK RFD Pre-Series cryomodule
Teleconference ACS – FREIA 20th February 2018
ESS elliptical cryomodule
Cryomodule Assembly Plan
Cryomodules Challenges for PERLE
CEPC-650MHz Cavity Cryomodule
Prototype cryomodule development
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL main evolutions between M-ECCTD and serie - Bonjour, Franck Peauger, Je.
Double-Spoke Cavities
CRYOMODULE FINAL ASSEMBLY
Cryomodule Product Breakdown Structure and configuration traceability
WP11: CDS-SL CDR Overview
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
April 19th 2017 Work Unit AIK CDR of the CDS-SL Installation integration.
Pierre Bosland – on behalf of the ESSI team (ESS Irfu)
ESS Spoke cryomodule testing: cryogenic experience
HiLumi P1/P5, Cryogenic interfaces for sc links, DFX 2nd review
(vertical cryostat, Gersemi)
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
Magnetic shielding and thermal shielding
Burst Disc Experiences at CEA Test Stand
SNS PPU Cryomodule Design Overview
CRYOMODULE FINAL ASSEMBLY
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

Functional interfaces ESS Spoke Cryomodules Prototype Valve Box Space requirements Functional interfaces Prototype Valve Box, Uppsala meeting, 14-15th April 2015

Design Status Detail drawings of the valve box are under progress… (VV, support frame, jumper, cryogenic circuits, vacuum barrier…) → last call to change the color of the external paint…

Space Requirements A little less than : 3x3x3 m3 About 3 tons (to be confirmed)

CTS (tuner) maintenance Dedicated tooling aim at: Space Requirements CTS (tuner) maintenance Dedicated tooling aim at: supporting the valve and the small end dish Dismantling : Large dish end of the VV MLI and Thermal shield

Procedure, crane and manpower useful « Deluxe » version: 5m length CTS maintenance Total length for access on one side only: 3.9 m Procedure, crane and manpower useful Access: 800mm for CTS maintenance « Deluxe » version: 5m length

Vacuum interfaces Cryomodule Valve Box HV GATE Valve (VAT, ISO-F DN 100) Valve Box Same HV GATE Valve (VAT, ISO-F DN 100)

Localisation of the instrumentation « towers » x2 (ISO KF DN50)

RF interfaces half size WR2300 wave guides For Uppsala: Possibility to rotate the doorknobs by 180° ESS Configuration half size WR2300 wave guides

Cryo-fluids interfaces From ICB From ICB To Reheater To Reheater Supply of saturated liquids: LHe : - FREIA: 1.2 bara IPNO: 1.2 bara LN2 : - FREIA: 3 bara IPNO: 1.5 bara max Vapours exhausts: He : - VB phase separator: 5 K ; Patm - Pumping line: 5 K ; subatm N2 : 90-110 K : Patm (TBC?)

Cryoliquids interface From IPNO facilities: 2 x bayonets From FREIA facilities: HNOOS type: 2xVCR (VV and TS sleeves removed) LHe LN2 VV sleeve TS sleeve

Vapours interface Interfaces compatible for both IPNO and Freia facilities He pumping line ISO-F DN 100 (bayonet) He exhaust KF DN 40 (bayonet) N2 exhaust KF DN 40 (bayonet)

Cooling Water for power coupler Ceramic window Coupler antenna More details after the prototype assembly at Orsay (best localization of the interconnections, easiest access…) Compressed Air for gate valve actuators

Thank you for Your attention