3DIC Consortium Meeting

Slides:



Advertisements
Similar presentations
Assembly and Packaging TWG
Advertisements

ASE Flip-Chip Build-up Substrate Design Rules
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
3D chip and sensor Status of the VICTOR chip and associated sensor Bonding and interconnect of chip and sensor Input on sensor design and interconnection.
Report on TIPP D-IC Satellite Meeting Carl Grace June 21, 2011.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
CMS Phase 2 Tracker R&D R. Lipton 3/27/2014 Module R&D Allocation: Requested ~ $320k, received ~160k – Eliminate VICTR testing (continue with FNAL funds.
Future Test Solution Korea Test Conference September 1, 2015 James J
The TSV Revolution and Fermilab’s MPW Run Experiences R. Yarema Fermilab TIPP 2011, Chicago June 8-13.
Low Resistance Strip Sensors – RD50 Common Project – RD50/ CNM (Barcelona), SCIPP (Santa Cruz), IFIC (Valencia) Contact person: Miguel Ullán.
H.-G. Moser MPI Munich Valerio Re INFN AIDA WP3 Summary 1 Status of milestones and deliverables Status of sub-projects Plans for the last year of AIDA.
Package Substrate Jan Business Confidential Top Metallization mm mm Bottom Metallization Beryllium Oxide OR Alumina We should see.
Special Focus Session On CMOS MAPS and 3D Silicon R. Yarema On Behalf of Fermilab Pixel Development Group.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Improving the world through engineeringwww.imeche.orgImproving the world through engineering 1 RSB Budgeting Process April 2013 RSB Mtg.
Phase 2 Tracker Meeting 6/19/2014 Ron Lipton
Work Related to Senate Bill 2202 (effective January 1, 2001)
MIMO  3 Preliminary Test Results. MIMOSTAR 2 16/05/2007 MimoStar3 Status Evaluation of MimoStar2 chip  Test in Laboratory.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Welcome to satellite meeting on 3D vertically integrated electronics at TIPP2011 June 14, 2011 G. Deptuch,
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
HV2FEI4 and 3D A.Rozanov CPPM 9 December 2011 A.Rozanov.
Department of Higher Education and Training
Risk-based Global Insurance Capital Standard Version 1
Food Suppliers Implementation of EDI &PAV March 2010
10-12 April 2013, INFN-LNF, Frascati, Italy
There is great power in harmony and mutual understanding.
Pico-second TDC Schedule & Production
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Design of the 64-channel ASIC: status
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Distribution Workgroup 24/11/16
Sensor Layout Options Aim is to understand the implication and constrains of possible sensor design/layout on the general ID Layout. Keep both ATLAS “drum”
Meeting at CERN March 2011.
Access to 65nm Technology through CERN
Proposed Bay TMDL Schedule
Achieving Strategic Goals while Supporting Operational Needs
Annual Assessment of Progress 2017/18 Briefing for Research Students Research Student Registry Mar/Apr 2018.
The COG “Cookbook” Course Lesson 1 - Introduction to COG Basics
Harmonisation Working Group Update on Harmonisation Project
COMP 208/214/215/216 Lecture 2 Teams and Meetings.
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Authority decision on CAP086 –Implementation Dates
Web Services Interoperability Organization
Management Discussion Items
Individualising Block Grants to Support NDIS Implementation
Senior college prep 9/14/17.
DRG Implementation Overview
C-2, London, United Kingdom, 9 – 11 October 2018
There is great power in harmony and mutual understanding.
Assessment Needs Analysis
2003 Annual NSDL PI Survey A Collaborative Formative Evaluation
17 April 2018 Progress report ccc General capacity requirements for SAIs for conducting IT audits.
TGn Chair’s Status Update
TDES Composite Pilot: Professional Reviews the Composite Conference Date and Time and Suggests a new Date Spring, 2013.
7. EAFM cycle overview Essential EAFM Date • Place 1.
The Early Help Assessment Journey. Request for Early Help Support Form. Support for OUR Early Help Partner Agencies.
May 2015 doc.: IEEE /0496r1 March 2018 IEEE TG13 Multi-Gbit/s Optical Wireless Communication March 2018 Meeting Slides Date:
A Quick Carl D. Perkins Act Update
Social Dialogue Test Phase SDWG meetings
Presentation by Bill Pauley European Division DFP
PDK Standardization.
Hall D Front End Electronics
OCP Engineering Workshop Rack & Power, Advanced Cooling Solutions, Data Center Facility
Updating the 2004 CPI Manual
Pico-second TDC Schedule & Production
May 2015 doc.: IEEE /0496r1 March 2018 IEEE TG13 Multi-Gbit/s Optical Wireless Communication March 2018 Closing Report Date:
State Reporting Updates
The Early Help Assessment Journey. Request for Early Help Support Form. Support for OUR Early Help Partner Agencies. ©Manchester City Council.
Presentation transcript:

3DIC Consortium Meeting Multi Project Run #2 R. Yarema Fermilab Marseille, France 3DIC Consortium Meeting March 18-19, 2010

3DIC Consortium Meeting MPW Run #2 This presentation is short and primarily intended to be an open discussion about the future. 3DIC Consortium Meeting

3DIC Consortium Meeting Consortium Size The University of Sherbrooke in Canada has joined our consortium. Sherbrooke will be represented by Jean-Francois Pratte. We are pleased to welcome this new member. Our consortium now has 16 member institutions from 6 countries 3DIC Consortium Meeting

New Options Developing Discussions are ongoing with Tezzaron MOSIS CMC CMP Not available yet, but could be in the near future 3DIC Consortium Meeting

3DIC Consortium Meeting Consortium MPW Run #2 Establish options for run Number of metal layers Type of MiM capacitors Hi-Res Poly for resistors Other?? Decide on single mask set or two mask sets. Decision hinges to a large extent on the size of the biggest chips If one chip is larger than one half of the reticule size, two sets of masks are necessary If the largest chip is less than one half of the reticule size, two sets of masks may be desirable if the total area of the top tier chips exceeds one half of the reticule area. If the total area of the top tiers approaches the area of the reticule, two sets of masks is most likely the best approach. If the total of the top tier design area is less than one half the reticule size, a single mask set is the best solution unless a large quantity of chips is desired. 3DIC Consortium Meeting

EOI for Space on MPW Run #2 ATLAS - 20 x 19 mm FNAL – 10 x 10 mm IPHC-IRFU/Saclay 5 x 5 mm INFN – six locations, 5 x 5 mm Sherbrooke - 4 x 5 mm Total design area = 725 mm2 Frame useage = 725/780 = 93% 3DIC Consortium Meeting

3DIC Consortium Meeting Cost Estimate Costs based on previous MPW run (changes and additional costs possible) Mask sets - $195K x 2 = 390,000 Wafer fab - $2525/wafer x 12 x 2 = 60,000 Assembly - $2500/wafer x 12 = 30,000 Total = $480K Cost/mm2 = $480K/725 mm2 = $662/mm2 Assume $700/mm2 for a 3D stack with 2 tiers (actually only $350/ mm2 of silicon.) Die size costs 20 x 19 mm2 => $266K 10 x 10 mm2 => $70K Each 5 x 5 mm2 chip => $17.5K 5 x 4 mm2 => $14K Number of parts before yield considerations = 336/design 3DIC Consortium Meeting

3DIC Consortium Meeting Next Steps Preliminary evaluation of run #1 Confirm current space allocation or make request for additional space. Verify frame street sizes for vendor PCMs before finalizing design sizes Compile comments for next run. (What can we do better?) Provide updated design procedures and design kits from Tezzaron to the consortium. - June 2010?? Set tentative date for next submission Dec 1, 2010?? We have gained a great deal of experience which will help us in future submissions. Plan on meeting at one of the consortium institutions for presentation of test results, July, September? 3DIC Consortium Meeting

3DIC Consortium Meeting Chip Scale Review (Feb 2010) 3D Integration: Talking About a Revolution The 3D Architectures for Semiconductor Integration and Packaging conference in December reviewed progress in all areas of 3D integration and discussed different approaches. The discussions often centered on whether 3D will be implemented through small changes or large changes .i.e. evolution or revolution. It’s still an open question. It goes with out saying that 3D is still in its early stages and we have experienced first hand some of the bumps in the road. CSR - “There is no question: everyone in the industry agrees that future growth relies on the success of 3D integration, and that through silicon vias (TSVs) are the only way to achieve the required functional density at desired cost”. CSR concludes by saying “…the best way to overcome the remaining limitations (design, test, thermal management) is to take a forward-thinking approach. It’s time to take off the 2D blinders and don the 3D glasses instead.” 3DIC Consortium Meeting

3DIC Consortium Meeting So we have!! 3DIC Consortium Meeting