YETS 2017-2018 & LS2 Reminder G. Girardot 20 juin 2017.

Slides:



Advertisements
Similar presentations
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Advertisements

LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
Barriere O, Le Roux P
TS, Length of YETS EYETS LIU & CONS Project
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF.
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
AB/CO - TC – Cl.Deh. HT section 1 Lessons from Point 8 HW installation Better idea of Where, When and … What ! Periodic meeting (every 2 weeks)
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
EHN1 – EN/EL Planning Lighting _ Containment_ Cabling J. Devine G. Gross 11/02/16.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
Emmanuel Tsesmelis RRB Scrutiny Group Meeting August 2010.
LIU–PLI report LIU Project Team meeting. Follow-up on the Engineering Change Requests Engineering Change Requests for the YETS PSB PS.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
NEW EN-EL SPECIFIC DATA IN PLAN 08/02/2017
YETS & LS2 Works EN-EL / Power distribution
Linac4-PSB 160 MeV connection readiness review
CERN Construction Planning and Scheduling (LHC installation)
Cabling for LHCb Upgrade
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
YETS & LS2 Reminder P. Lelong / G. Georgiev / JM Lassausse
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
Identification of the unused cables
PS-CT: ERD-2 switch tank harmonization
LIU Wire Scanner Milestones June 2017
Forecasts for waste and radioactive material storage
EYETS LHC 2016/2017 Works EN/EL/CF
Injector De-cabling Project
Safety in Construction and Upgrade Phases
TE-MPE LS1 review Vision from EN-EL(CF)
EC Activities Status for the LIU
De-cabling strategy during YETS
the high-voltage network of CERN ToMORROW
LHC Civil Engineering Activities for YETS – LS2
Accelerator and Experiment Interface Session: LS2, LS3
EN-STI activities in LHC during EYETS
CRG activities for EYETS 2016
SPS activities during LS2 TE-EPC (Power Converter Group)
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
YETS & LS2 Works EN-EL / Power distribution
Overview & baseline of LS2 and roadmap for CRG
Status with crucial LSS5 kicker transmission line cables
East Hall under construction
GIS Portal Racks Project
Business opportunities related to CERN electrical network
BLM planning 03/03/2014.
Experimental Areas – LS2 planning
HL-LHC - WP15 modifications Coffrets Prise C4L8
ILO Industrial Opportunities Days, 6-7 June 2019
Open Points and More… Giulia / Michael / Sebastien / Maria.
Comments on the North Experimental Area Consolidation Request Form
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

YETS 2017-2018 & LS2 Reminder G. Girardot 20 juin 2017

Summary Activity during LS2 Constraints EL Work Requests: YETS 2017/2018 Preparation LS2 Preparation Strategy – LHC Document for Requests to EN/EL/FC 20/06/2017 YETS 2017-2018 – Reminder

Activity during LS2 Activity in PLAN with requests for EN/EL/FC 56 requests => only 1 DIC received actually 50% requests not complete : 4 with out geographical area 17 without execution period 2 scheduled for the EYETS16-17 but no DIC received 18 without the quantity and the length of cables Activity not in PLAN with requests for EN/EL/FC 4 requests 2 final DICs (LOW BETA & SAREP links) 2 Pre-DICs (BPM new collimator TCSPM – TCPPM in Pt3&Pt7) 20/06/2017 YETS 2017-2018 – Reminder

Constraints Activities that generate access constraints Replacing hoses of water-cooled cables (Pt1 – Pt2 – Pt5) Installation GSM cable (Pt3 –Pt7) + (ATLAS – ALICE – CMS – LHCb) Replacement of SAREP links (Arc12 – Arc23 – Arc34 – Arc45 – Arc56 – Arc78 – Arc81 ) Difficult cohabitation with other activities during the pulling Activities need specific transport and handling Activities need storage area All cable campaigns need an area for underground storage 20/06/2017 YETS 2017-2018 – Reminder

EL Work Requests: YETS 2017/2018 Preparation Timeline Preliminary studies Material Provision Preparation of Technical Files 20-06-17 15-07-17 11-07-17 23-08-17 15-09-17 01-10-17 03-10-17 17-10-17 15-11-17 01-12-17 t Sending MEMO to Users Pre-DIC/DIF and electrical distribution through CERN Service Portal Final DIC/DIF and electrical distribution request Activities Schedule & IMPACT creation Technical Files ready for EL contractor Presentations of YETS 2017/2018 Users Activities Presentation of YETS 2017/2018 EN-EL activities in coordination meetings SPS, PS and LHC complexes Dates for the users request to be confirmed in the MEMO YETS 2017-2018 – Reminder 20/06/2017

LS2 Preparation Strategy - LHC Dates à retenir Deadline for PLAN-V2 resources allocation 02-06-17 16-06-17 20-06-17 28-07-17 15-08-17 03-10-17 01-12-17 18-12-17 YETS 2017/2018 t EL consultation with Users Pre-DIC/DIF and electrical distribution through CERN Service Portal Preparation of LS2 works (advance installations where possible) Presentation of EN-EL activities generating major access and co-activity constraints (mainly OP) Presentation of EL activities during LS2 with estimated durations. YETS 2017-2018 – Reminder 20/06/2017

Document DIC (EDMS: N°1210369) Demande d’installation de câbles 20/06/2017 YETS 2017-2018 – Reminder

Document DIF (EDMS: N°1153880) Demande d’installation fibre optique 20/06/2017 YETS 2017-2018 – Reminder

Document DIR (EDMS: N°1398443) Demande d’installation de racks 20/06/2017 YETS 2017-2018 – Reminder

Document DFP (EDMS: N°1540878) Demande de fourniture de Patchcords 20/06/2017 YETS 2017-2018 – Reminder

Document DEC (EDMS: N°1314019) Demande d’enlèvement de câbles 20/06/2017 YETS 2017-2018 – Reminder

Thank you for your attention !