YETS 2017 / 2018 Leszek Borakiewicz IT-CS-DO PSB/PS/TT2/Linac2-3 preparation meeting – October 12th 2017 2017-10-12 IT/CS Mandate
IT/CS Mandate IT Campus Network Telephony Technical Network – all Machine connected devices (and only) GPN Network PCs, Printers etc. Wi-Fi Network IP Telephony Telephony Analogue phones / fax (TO BE DISMANTLED DURING LS2 !!!) GSM Network (4G included) TETRA – Security Radio Network 2017-10-12 IT/CS Mandate
Meyrin Area taken into account A shared IT infrastructure in all buildings within Any, even office installation request can be fulfilled only during Technical Stops !!! As for now, a small quantity of works are announced 2017-10-12 IT/CS Mandate
Meyrin Area taken into account A shared IT infrastructure in all buildings within Any, even office installation request can be fulfilled only during Technical Stops !!! As for now, a small quantity of works was requested LS2 - Major TN Routers upgrade is foreseen – please, announce any works if not done yet 2017-10-12 IT/CS Mandate
YETS 2017 / 2018 Major UTP for Wi-Fi cabling works in all of B. 354 Wi-Fi extension in 355 Small UTP cabling works in B.150, 151, 170 & 179 Technical Network capacity upgrade in B.193 TN devices renumbering in PSB – follow-up of Campus Network changes done during last EYETS New GSM Leaky Feeder for PS: works will be done by EN/EL, some telephony outage to be foreseen 2017-10-12 IT/CS Mandate
Existing Infrastructure IT Network information can be accessed using the GIS Portal. The data is updated once a day and available under https://gis.cern.ch/gisportal/planotheque.htm 2017-10-12 IT/CS Mandate
Contact – in advance Contact for any questions about PSB/PS/TT2/Linac2-3 IT works: Leszek Borakiewicz < leszek.adam.borakiewicz@cern.ch > For works coordination, any new request etc., please, put in a copy / watch list: Maryse Da Costa < Maryse.Da.Costa@cern.ch > 2017-10-12 IT/CS Mandate