TECHNICAL DESIGN OFFICE

Slides:



Advertisements
Similar presentations
Layout Drawings of the LHC Collider A. Vergara-Fernández S. Chemli B. Maire Y. Muttoni A. Kournossenko R. Zalyalov TS Workshop May 4 th 2004.
Advertisements

RAMIRI2 Prague 2012 Project management and the RI Life Cycle.
Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
ZHRC/HTI Financial Management Training
CATIAv5 : EUCLID3 Data migrationYann BONCOMPAGNI CERN TS-CSE-CAECATIAv5CATIAv5 Euclid3 data migration.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
TS-CV contracts case study LHC pipelines and HVAC for Experimental Areas R. Principe, J. Inigo-Golfin.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
Creating a common understanding on Adverse events information requirements CCC-TI Isabelle Laugier Nov 2 nd 2012.
Copyright Joe Kasser Dr. Joseph Kasser UMUC On-line Requirements Workshop.
CCC status report 14/12/2004D.Manglunki AB/OP 1 Status of the CERN Control Centre D. Manglunki AB/OP.
Service Manager 7.10 Knowledgebase Demo “Knowledge is power”
Presentation to the Information Services Board March 6, 2008 Bill Kehoe, Chief Information Officer Bill Kehoe, Chief Information Officer.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
LHC Quality Assurance Working Group - M. Mottier September 2000.
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
Thursday 6 th May 2004 C. Martel – Cooling Ventilation - CERN TS/CV TS/CV/BE COOLING VENTILATION TECHNICAL DESIGN OFFICE TS Workshop Archamps 2004.
An overview of current & future functionality David Widegren TS/ASE/EPS 23 February 2008EDMS:
May 26 th 2005 Development and Management of the Installation Drawings for the LHC Machine Samy Chemli, Jean-Pierre Corso, Yvon Muttoni TS-IC.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
LEAF1CH TASK FORCE EUCLID2CATIA C. Hauviller / TS.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
EDMS/CDD Overview Stephan Petit - EST/ISS LHCb EDMS Seminar – Dec. 5 th, 2001 EDMS Doc EDMS/CDD Overview.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
ConstraintsSolution ConsequencesOpportunities RE-TENDERING OF ST-CV MAINTENANCE CONTRACT Michele Battistin - CERN - ST/CV Group Workload Budget Lump-sum.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
GMS (General Management & Secretariat) Group Meeting 14-oct-10.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
Review of the processes released in the framework of the MMP Goran Perinić.
TE-MPE-EM: Subcontracting Raphaël Berberat
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Transport and Handling Manpower Planning S. Prodon – LEAF
Chapter 15 Telecommunication Department Management.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
DIFFERENT APPROACHES TO THE FM CONTRACT M. Nonis TS-FM 1 st TS Workshop – May 2004.
In. ASSIST has 2 full time members of staff 3 part time members of staff approx. 240 volunteers (May 2016)
Lecture Outline 12 Other ways of obtaining systems IS Department in a Business Organization The Future of IS.
LHC intervention scheduling with the Work Acceptance Tool
Demineralised water cooling system
Agenda Item 2: Catch up session 15 May 2017
Doing business with CERN Anders Unnervik
Situation of the Static Var Compensators at CERN.
Equipment simplified model SMR UR safety
DT-PO Section Meeting Tuesday 30th June , 15:00 Hrs, room 155-R-047
Summary of first LHC logging DB meeting
ENGLISH FOR PROFESSIONAL COMMUNICATION
Software Configuration Management
The MTF adjusted system to meet Vacuum Group needs
Chapter 21: Developing an effective workforce
Y. Muttoni - J.P. Corso TS Workshop Archamps
Operations Model Thursday, October 20, 2005 October 13, 2005 Jean Slaughter.
Computational Fluid Dynamic at CERN
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
Department of Licensing HP 3000 Replatforming Project Closeout Report
CEOS Organizational Matters
Construction Contracts
Strategies for Information Management
Passenger Mobility Statistics 21 May 2015
IT-4464/EN Bidders conference
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

TECHNICAL DESIGN OFFICE TS Workshop Archamps 2005 Thursday, 26th May 2005 TS/CV/BE COOLING VENTILATION TECHNICAL DESIGN OFFICE C. Martel – Cooling Ventilation - CERN TS/CV

INTRODUCTION Human resources Subcontractors Optimization LHC project life + Heavy historical background of the design office Organization BE CV = Organized and efficient BE CV functions Costs Team turn over Insourcing E071 contract Outsourcing

Historical background Transition period (end of 2006) AGENDA Introduction Historical background Guidelines Present situation (2004-2006) Future situation (2007) Transition period (end of 2006) Invoicing Perspectives

MANDATE Building 513 CCC F550 LHC underground ventilation Documents for coordination Tender documents Execution documents for approval Re-measurement documents As built documents Computers skills Technical documentation Archiving Building 513 CCC F550 LHC underground ventilation Tunnel Pipes modifications and branches Alice, LHCb, CMS, CNGS

HISTORICAL BACKGROUND Retirement Long adaptation period for new people (6 months) Variable number of people (5 to 11) Important turn over (25 people in 7 years) 2004 complete restructuring Repartition and number of people in the internal office

GUIDELINES In-sourcing of a minimal internal team composed of 3 people in order to : Stabilize the BE services Stop the high turnover of people Maintain the historical database of the group Satisfy the requests from users and sections

PRESENT SITUATION CV Group structure

In-sourcing or out-sourcing PRESENT SITUATION In-sourcing or out-sourcing OK

In-sourcing or out-sourcing PRESENT SITUATION In-sourcing or out-sourcing Small projects (few hours work) IN Coordinated projects (integration ICL) IN Quality check with Contractors (all) IN Isolated & medium projects (blg.201) OUT Update drawings, schematics (firefighting) OUT Support studies (CNGS) OUT

Organization of internal office PRESENT SITUATION Organization of internal office Bernard BOURGOIN Sébastien LEBRUN Jérome MACH Nicolas LEFEVRE Jean-Marie MUFFAT Christian MAURE Michel HUYGHE 7 people from ENDEL firm

FUTURE SITUATION Organization of internal office Repartition of the profiles in the internal office 3 basic profiles shall be maintained

TRANSITION PERIOD before end of 2006 Inform people about transition 3 months before opening CERN posts Maintain during 3 month the rest of the team An overlap period during recruitment guaranties A sufficient stability of the BE The good transmission of the information The good transmission of the methods

2005 2006 INVOICING Internal office 85% External offices 15% 60 000 CHF / month 800 000 CHF / Year External offices 15% Costs supported project by project 2006 Internal office 80% 37.5 000 CHF / month 450 000 CHF / Year External offices 20% Costs supported project by project

PERSPECTIVES Internal office for coordinated projects External office for isolated projects After LHC project, if a new machine is to be design, the internal office should be increased.

ACKNOWLEDGEMENTS Y. Muttoni, R. Valbuena, … (ICL, Integration team) F. Soriano (CD Roms, computers, plotters) B. Feral, E. Van Uytvinck (Euclid, recruitment) C. Delamare, S. Petit (CDD archiving) …