HITS ABS-P COPA Meeting 29 November 2013 Riaan Carstens Anglo Platinum.

Slides:



Advertisements
Similar presentations
Quality &Validation Department (Q &V) BUE 1 By: Nehal Osman.
Advertisements

Policies and Procedures © Policies and Procedures 2013 U.S Security Associates, Inc. All rights reserved. Unit 2 Policies and Procedures © Policies and.
BMJ Learning Recent developments and future directions Dr. Kieran Walsh BMJ Learning November 2008.
Occupational Health & Industrial Hygiene Programs.
State Assessment Accommodations The Role of School Assessment Coordinator Documentation & Decisions Office of Planning & Assessment Boulder Valley School.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Runs of Material. Fatal (Traumatic) Accident Analysis Efffort Fatal Report 1970 – 2012 April 7/12 TotalPercentage Explosives16 4.6% Fall of Rock7822.3%
MNM Fatal Fall of Person Fall of Person February 21, 2014 (Kentucky) February 21, 2014 (Kentucky) Cement Operation Cement Operation Contract Laborer.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Shelcat Scottish Health Libraries Catalogue Training guide, March 2009.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
2012 Mine Rescue Contest Day 1 36 th May 15 th 2012 Judge’s Briefing.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Good morning and thank you for coming to the Summer Institute!
Welcome This is a document to explains the chosen concept to the animator. This will take you through a 5 section process to provide the necessary details.
STATEMENT Welcome to the TG Mine and thank you for your help. We have a 5 person crew that was tagged in on the mine tag board. They were working an idle.
Developing a Part 46 Training Plan. Part 46 Includes Shell dredging Sand Gravel Surface stone Surface clay Colloidal phosphate Surface limestone mines.
1 Technical Outcomes of applying the Leading Practice Frans Saunders Mine Overseer.
Legal Rights and Responsibilities of Employers, Supervisors and Employees Lesson 2.
PROBLEM SOLVING. Definition The act of defining a problem; determining the cause of the problem; identifying, prioritizing and selecting alternatives.
SCG-SH-0200 Southern Company Generation Clearance Procedure Awareness Training for Contractors and Nonlisted Personnel.
9 Procedure for Conducting an Experiment.
Accommodations State Assessment Accommodations
& This module is a series of slides containing graphic effects along with visual and written instructions on how to use the ARI/Wright Express fuel card.
5. Exam Day This is the phase where the exams take place. You will find all the information on how to conduct the examinations.
MOSH Adoption Team Training
LESSON #5: Workplace Games and Introduction to 2D in Unity
TARP (TSM) Introduction at Joel Mine
Workplace Communication
Unified Modeling Language
Aligning Behavioural issues with the Practice
Objectives Upon completion of this module you should be able to:
DESY experiences on education and training of cleanroom team
Limpopo RTF Steelpoort
PDQ Completion: Section 1.0
Mechanical Loader Accident
Introduction In the first lesson we demonstrated the following:-
Global Social Venture Competition Pitch Deck
Computer Programming.
Incident Investigations
Reading Objectives: Close Reading
Transmission Engineering
Communities of Practice for the eager Adoption of a Leading Practice Andre van Zyl CoM MOSH Learning Hub.
Do we have a Falls of Ground risk ?
Envelope Concept report, PCS UG
Post Demonstration Workshop
Fall of Ground Strategy
SSID ENROLLMENT Course Introduction
Introduction to Algorithms and Programming
Accommodations State Assessment Accommodations
Lesson 2 Legal Rights and Responsibilities
UNISEL MINE.
Safety & Health Programs
Safety & Health Programs
Leading Practice Implementation Guide
How To Make Accessible Word Documents
Leading Practice Adoption Review Sheet for TARP/ABS-P
PCS CONTENT ON CMS.
Leading Practice Implementation Guide
Generic Behaviour Plans
Fall of Ground Strategy
Welcome 1 This is a document to explains the chosen concept to the animator. This will take you through a 5 section process to provide the necessary details.
Underground Coal Mine Supervisor Training
Serious Incident LIVE LONGER 18 December 2017 Subsequent Death
2014 MTTC Pennsylvania Regional Skills Contest
2014 KCA Regional Skills Contest
Training and Materials
Simple Sequencing Part 2
Safety & Health Programs
Maternity Workload Tool standard BOXI reports
Presentation transcript:

HITS ABS-P COPA Meeting 29 November 2013 Riaan Carstens Anglo Platinum

Content Brief History Hazards and teams Process flow Demarcation of working places Communication and close out Reference books Animation training Key Points

History Process started in 2007 – Amandelbult Mines Looked at Xstrata’s TARP system Held a series of workshops Similar system in place at Bathopele called ABS - Combined 2 system Did not follow the MOSH adoption process per say but there was very diverse stakeholder involvement

Hazards Brows Missing support Water Flat dipping features < 600 Falls of ground Domes Back break indicators Change in face composition Major geology Blocky ground conditions

Team Composition ABS-P Level Action Authority A Normal mining as Standards and Procedures demand (Continue). 3 options: Miner or Team Leader or Shift Supervisor. B Request “B” Team intervention after Barricading. Strata Control Officer or Mine Overseer or Section Manager S Request “S” Team intervention after Barricading. 5 options: General Manager or Production Manager or Shaft Rock Engineer or Chief Rock Engineer or Section Manager AND Strata Control Officer Pb or Ps The team continues as normal but with special instructions/support until the working place is declared safe to return to the normal standard “A”. The visiting “B” or “S” team that issued the “Pb/s” instructions shall stipulate under which conditions the working place shall return to “A” status.

Process flow

Demarcation The ABS-P status of a working place must be displayed to inform both workers and visitors of the workplace status. In the case of development ends the workplace status must be painted on the sidewall of the development end. In the case of stoping the workplace status must be painted on the hanging wall and/or the side wall of the gully. This sign painted on the hanging wall and/or side wall will indicate the status of the panel immediately updip of the gully. In the case of mechanized mining the workplace status must be painted on the sidewall of the working place and this will apply for both bords and splits. The status of the working place, A, B, S, Pb or Ps, must be painted on a daily basis. This is the minimum requirement and the mine can stipulate additional requirements such as sign boards. If sign boards are used it must clearly state which area of the working place it refers to.

Communication

Printed reference material Three books for different mining environments Used illustrations rather than photos Simplified language “Cessation vs Stop” Only one topic per page Visuals need to be as descriptive as possible

If drawings could talk

Booklet

Books

Animation Training Started in January 2011 Exposes the user to rock related hazardous conditions underground on a computer system using multimedia technology Three different modules with 51 scenes Two target populations Comp B and team - Identify and report Comp A and above - Identify, classify and report Must pass ABSP Intro before they attempt the HITS - ABSP Scenes for communication and demarcation included Translated into 5 languages: Xhosa, Sepedi, Tswana, Shona and English Testing included with tracking of pass rates Indicate the potential consequences of ignoring or incorrectly dealing with the hazardous conditions

Key Points Be careful of creating bottlenecks when deciding on response teams Consider certification rather than management levels Keep it as simple as possible Need to consider demarcation Need to be clear on communication and close-out Consider the extra workload on all levels of management

Discussion