CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

Slides:



Advertisements
Similar presentations
WDS Status Propose to create 6 sub-collaborations Propose to create 6 sub-collaborations Sub-collaborationSummary of Task 1Proton DriverDefinition of critical.
Advertisements

14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
Eurisol User Group, 14 Jan 2008V. Palladino ν beams: prospects today & synergies with Eurisol" Neutrino beams: prospects today & synergies with Eurisol.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Costing Workshop Summary Chris Rogers, RAL, 30 Mar 2010 Establish a common framework for costing of neutrino facilities Compare Beta Beam, Super beam and.
BENE07, 29 Oct 2007V. Palladino Goals for BENE08 Goals for BENE08 − February 29 submission of IA Proposals → 2012 CARE Next HEP Detectors IA V. Palladino.
NEu2012 Neutrinos for Europe in 2012 Networking Activity (continuing BENE, along with EUROnu FP7 DS) within Integrating Activity EuCARD (continuing CARE)
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
ICL, 7/1/2010,UKNF Collaboration MeetingV.Palladino Status and Plan for FP7-NEU Status and Plan for FP7-NEU2012 the Accelerator Neutrino Network.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
ISS After One Year Peter Dornan Imperial College London.
European design study on Neutrinofacilities - Euronu within FP7.
CARESGV. Palladino: Status Report from BENE Status Report from BENE V. Palladino, CARESG, College de France, Sep BENE established on.
Introduction to BENE08 fifth & last BENE workshop Tuesday Dec 2-3 CERN meeting focusing on the BENE Final Report to be published as a CERN Yellow.
Networking Activity on Beams for European Neutrino Experiments BENE-Next ….. MEGLIO? Motivation Work Packages Partners & resources First ideas for the.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
ECFA Chairman’s report T. Nakada EPFL. New members Romanian members ratification on by the ECFA members – R/PECFA member: Dr. Calin ALEXA,
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
27 Apr 2006P J Dornan - ISS3 - RAL Next Meeting 4 th ISS Plenary –Irvine Aug21, 22 (NUFACT06 Aug 24 – 30) Workshops –Physics Group, June, Valencia –Machine.
Neutrino Factory Design Study Introduction Introduction World Design Study status World Design Study status EC Framework 6 Design Studies EC Framework.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
ECFA - European Commitee for Future Accelerators Tatsuya Nakada – EPFL, Switzerland– prepared for CERN September Council presented by.
NuFact06, 28 Aug 2006V. Palladino European Regional Outlook V. Palladino NuFact06 UC Irvine, Tue Aug 29, 2006 European Regional Outlook.
CERN, 27/11/2009,86th Plenary ECFAV.Palladino Status and Plan for FP7-NEU Status and Plan for FP7-NEU2012 the Accelerator Neutrino Network in the.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe History Aims Structure Some admin Rest of the meeting.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
A CCELERATOR S ESSIONS S UMMARY D AVE W ARK, I LIAS E FTHYMIOPOULOS Neutrino Strategy Workshop CERN, October 3, 2009 Outline  Show highlights from the.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Long Baseline Neutrinos How we got here Nigel S. Lockyer Fermilab Open Meeting on Neutrinos 12/12/2014.
Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
CSN2 INFN, 28 Sep 2010 “BENE”, V. Palladino Dopo gli anni di FP6, BENE e’ ora al secondo anno FP7 di vita (2010) come contenitore di due iniziative Il.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Goals of the consultation meetings From the ToR, the goals of the meeting in the first year should be: communicate that the panel exists; collect input.
CARE05, 25Nov2005V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Conclusions and thanks
European Network for Novel Accelerators (EuroNNAc2): WP7
Final Discussion THE EUROPEAN STRATEGY FOR FUTURE NEUTRINO PHYSICS
Accelerator R&D for Future Neutrino Projects
The European Strategy for Particle Physics
The Accelerator Complex from the International Design Study
Collaboration Board Summary
Alain Blondel 11 October 2010 GDR NEU2012 summary
The Way Forward ISS to IDS
EUROnu: Management Aspects
European Detector R&D: AIDA
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
EUCARD WP3 -- NEU2012 EUROPEAN NEUTRINO STRATEGY FOR
Accelerator R&D for Future Neutrino Projects
Milestones & Deliverables BENE III period Jan 06 - Jun07
Report from ICFA neutrino panel
Document CWG-SFP-3/8-E 5 December 2017 Original: English
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
ICFA Neutrino Panel: Roadmap discussion document
Exit Capacity Substitution and Revision
A High Intensity Neutrino Oscillation Facility in Europe
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino Dopo gli anni di FP6, BENE e’ ora al terzo anno FP7 di vita (2011) come contenitore di due contratti EC Il Design Study EUROnu Sep 1 2008-12 : aims at 3 Design Reports Superbeam CERN-Frejus  Neutrino Factory  Betabeam(s) β + NuFact IDS = International Design Study La Networking Activity NEu2012 Apr 1 2009-13 : aims at Eu  road map WP3 della nuova EuCARD Integrating Activity Eu Coordinated Accelerator R&D sintetizzando ………….CNGS upgrade studies/ EUROnu/all international studies . Breve update da Settembre 2010 ….il quadro generale …. news from the R&D CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino Tema di entrambe le iniziative (e di una terza iniziativa, un secondo Design Study LAGUNA-LBNO) CNGS team Accelerator  program for Eu CNGS (> 0.5 MW) upgrades CNGS-like upgrades beyond MMW Superbeams Betabeam  Factory LAGUNA-LBO EURO nel contesto internazionale Tokai JPARC+ Hyper K 1.6 MW Superbeam 500 KTons !!!! FNAL NuMI’ + LBNE , 2 MW Superbeam 300 KTons !!?? MMW Proton Driver Muon Accelerator Program: -Factory CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

Long term options: EUROnu SPL CERN to Frejus SB Neutrino Factory baseline - 8Li & 8B back-up Betabeam CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

Long term options: EUROnu subGev SPL CERN to Frejus SB multiGev Neutrino Factory subGev baseline - 8Li & 8B back-up Betabeam CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

Shorter term conventional LAGUNA-LBO multiGev subGev CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

WP3-NEu2012 Neutrinos for Europe in 2012 May 10 2011 WP3-NEu2012 Neutrinos for Europe in 2012 Structuring the accelerator neutrino community as latest revised, yesterday, in our second NEu2012 annual meeting CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino V.Palladino Network for structuring the neutrino community (NEu2012)

The CERN Council Strategy Update Process 2006 7 8 9 10 11 12 2013 14 15 16 17 18 2019 FP6 BENE NA FP7 EURO DS FP8 initiatives? support from CERN+agencies for medium term initiatives long term R&D and Design FP7 Eu2012 NA FP7 LAGUNA +LBNO DS Lisbon Jul 14 2006 1st Strategy Document venue tbd Spring 2013 1st Strategy Update ? EPS-HEP Grenoble July 23, 2011 2nd Eu  Strategy Workshop Spring, 2012 “Orsay” Summer 2012 CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

NEu2012 Neutrinos for Europe in 2012 Council dixit …… to be in position to define the optimal neutrino program …………………… ….. in around 2012 CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino 7/17/2018 9

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino The 2006 Strategy Document CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino NEu2012,EUROnu,LAGUNA-LBNO .. Spring 2012 CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino Missions of ah-hoc “EUvSG” MISSION 1 : ORGANIZE TOWN MEETING ….. Propose it at CERN, Dec-Jan -- this was already suggested as a sequel of the neutrino workshop of Oct09 Spring 12 so to In advance of meeting: -- Establish list of possibilities, performance, mutual compatibilities & synergies -- perceived pros and cons -- Feasibility, risk factors (unknowns or unfinished R&D), safety issues -- timeline, entry price, program continuity etc… -- other pros and cons (external funding possibilities etc…) Also, need to understand view of CERN management and Nat’l Agencies on these CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino Da Settembre 2010 Second EURoNu Annual report 31 October http://bene.web.cern.ch/bene/EUROnu-2ndYearlyReport.doc NEu2012 First 18 months report mid October NNN10 Workshop on Next Neutrino & Nucleon Decay Detector December, Toyama Second EUROnu general Meeting January, CERN WIN11, Weak Interactions & Neutrino Workshop February Meeting ECFA EUROnu Review Panel (F. Halzen) Daresbury, 5 -6 May Second Neu2012 EuCARD & NEu2012 general meeting May 10, Paris NEu2012 (up to) fourth semester report end May Neu2012 (EuCARD) Midterm review June 21, CERN Launch of CERN Council Strategy Update Process Jul 23, EPS-HEP Grenoble ECFA EUROnu Review Panel (F. Halzen) Oral Report Jul 23, EPS-HEP Grenoble NuFact1110 Workshop on NuFact, Superbeam, Betabeam 1-6 August, Geneva round table discussion Monday 1 August: Future Neutrino Facilities in the Global Physics Environment Bertolucci, Myers, Oddone, Spiro, Zwirner, Nishikawa, Womersley and ICFA rep. completing Neu2012 Interim milestone Report yesterday expecting Neutrino Session at ICFA Seminar at CERN 2-6 October ECFA EUROnu Review Panel (F. Halzen) Report Plenary ECFA November preparing EUROnu third yearly report due mid October EUROnu Betabeam (WP4) meeting in Napoli 20-21 October NNN10 Workshop on Next Neutrino & Nucleon Decay Detector November, Zurich 2° Eu Neutrino Strategy Workshop CERN, Spring 2012 CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino + Progresso degli R&D experiments, MICE, EMMA, BETABEAM …..

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino Europe CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino + sub-GeV Superbeam scientific sinergy + multi-Gev Superbeam technical sinergy CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino Performance of CNGS CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino Sterile neutrinos Beyond 3 X 3 storage ring? CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

In the end: is there a home for large Eu  detectors? for a coherent staged Eu LB  program multiGev CB+BB subGev SB+BB NB MTons may prove harder than MWatts CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino CNGS & PS tre iterazioni probabili Eu  Workshop, Spring 2012 “Orsay” meeting, Summer Final Neu2012 Report, 2013 subGeV SB+BB Multi-GeV CB+NF CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

INFN contributions to R&D MICE at RAL Betabeam experiment in Legnaro Physics and Detector Expertise CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino MICE CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino Legnaro CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino

CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino