Elisabetta Ronchieri WP3

Slides:



Advertisements
Similar presentations
© 2006 Open Grid Forum Build, Test and Certification of Grid and distributed software Community Group Current practices and short term plans in Building,
Advertisements

INFSO-RI Module 03 Installing the ETICS Client Alberto Di Meglio.
OMII-Europe Repository Steven Newhouse Director, OMII-UK.
EMI INFSO-RI SA2: Session Summary Alberto Aimar WP Package Leader 1 June 2011, Lund.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
EMI INFSO-RI EMI SA2 Report Quality Assurance Alberto Aimar (CERN) SA2 WP Leader.
EMI is partially funded by the European Commission under Grant Agreement RI Post EMI Plans and MeDIA Alberto DI MEGLIO, CERN Project Director WLCG.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
INFSOM-RI ETICS Demo Building and Testing Interoperability of DICOM Servers and Client Paolo Fabriani - Engineering Matteo Selmi.
INFSO-RI Module 01 ETICS Overview Alberto Di Meglio.
INFSO-RI NA2 Status Update ETICS2 second AHM Isabel Matranga Engineering Ingegneria Informatica SpA Darmstadt, February 2009.
WNoDeS – Worker Nodes on Demand Service on EMI2 WNoDeS – Worker Nodes on Demand Service on EMI2 Local batch jobs can be run on both real and virtual execution.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
Summary Report Project Name: Infoway Testing Environment Brief Project Description: Develop testing harness to allow for conformance testing of the applications.
INFSOM-RI SA2 Overview Valerio Venturi WP leader 2.
INFSO-RI JRA 1 Testbed Management Technologies Alain Roy (University of Wisconsin-Madison, USA) ETICS 2 Final Review Brussels - 11 May 2010.
INFSO-RI Module 05 The ETICS Plugins and Compliance Analysis Alberto Di Meglio.
Summary Report Project Name: Open Health Assistant (OHA) Platform Brief Project Description: Open Health Assistant offers a combination of remote and personalized.
Conference name Company name INFSOM-RI Speaker name The ETICS Job management architecture EGEE ‘08 Istanbul, September 25 th 2008 Valerio Venturi.
INFSOM-RI Elisabetta Ronchieri INFN CNAF ETICS 2 nd EU Review (CERN) 15 February 2008 WP3 - Software Configuration Tools and Methodologies.
EGEE MiddlewareLCG Internal review18 November EGEE Middleware Activities Overview Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as.
15 December 2015M. Lamanna “The ARDA project”1 The ARDA Project (meeting with the LCG referees) Massimo Lamanna CERN.
INFSOM-RI ETICS: E-infrastructure for Testing, Integration and Configuration of Software Alberto Di Meglio Project Manager.
Summary Report Project Name: iOpen Master Person Data Management Platform (MPDM) Brief Project Description: - A complete set of master person index development.
Testing Grid Software on the Grid Steven Newhouse Deputy Director.
EMI is partially funded by the European Commission under Grant Agreement RI SA2 – Development Tools Andres Abad Rodriguez SA2.4 Tools Activity Leader.
INFSOM-RI WP5: Dissemination, Training, Certification Study and Web Interface Status Report ETICS All-Hands – 21 November 2007.
Task 2.1: Software Specifications Markus Kissler-Patig.
INFSOM-RI Project Status Update for All-Hands Meeting Alberto Di Meglio Project Manager.
G.Govi CERN/IT-DB 1 September 26, 2003 POOL Integration, Testing and Release Procedure Integration  Packages structure  External dependencies  Configuration.
INFSOM-RI Project Overview Alberto Di Meglio Project Manager 2.
K. Harrison CERN, 22nd September 2004 GANGA: ADA USER INTERFACE - Ganga release status - Job-Options Editor - Python support for AJDL - Job Builder - Python.
Daniele Spiga PerugiaCMS Italia 14 Feb ’07 Napoli1 CRAB status and next evolution Daniele Spiga University & INFN Perugia On behalf of CRAB Team.
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
INFSO-RI SA2 Infrastructure Support Elisabetta Ronchieri - INFN ETICS 2 Final Review Brussels - 11 May 2010.
INFSOM-RI WP1: Administrative and Technical Management Alberto Di Meglio Project Manager.
Components Selection Validation Integration Deployment What it could mean inside EGI
INFSOM-RI WP3 Software Configuration Tools and Methodologies Elisabetta Ronchieri (INFN CNAF) ETICS Final Review (CERN) 15 February.
INFSOM-RI ETICS: E-infrastructure for Testing, Integration and Configuration of Software Alberto Di Meglio Project Manager.
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
INFSOM-RI WP2: Infrastructure and Service Management Status Report ETICS All-Hands – 29 May 2006 Peter F. Couvares ETICS WP2 Leader.
EMI INFSO-RI SA2: Quality Assurance Status Report Alberto Aimar(SA2) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
INFSOM-RI The ETICS Service Configuration, Building and Testing Elisabetta Ronchieri, ETICS Project, INFN CNAF.
M.-E. Bégin¹, S. Da Ronco², G. Diez-Andino Sancho¹, M. Gentilini³, E. Ronchieri ², and M. Selmi² ¹CERN, Switzerland, ² INFN-Padova, Italy, ³INFN-CNAF,
INFSOM-RI Project Status Update Alberto Di Meglio Project Manager.
ETICS, EU-OMII and the Software Repository Andrea Caltroni, INFN Padova ETICS 1 st All-Hands Meeting, Budapest - May 29-31, 2006.
INFSOM-RI Elisabetta Ronchieri INFN CNAF ETICS 2 nd EU Review (CERN) 15 February 2008 WP3 - Software Configuration Tools and Methodologies.
INFSOM-RI WP3: WP3: Software configuration tools and methodologies Status Report ETICS All-Hands – 23 May 2007 E. Ronchieri.
INFSO-RI Module 03 Installing the ETICS Client ETICS Online Tutorials.
J Jensen / WP5 /RAL UCL 4/5 March 2004 GridPP / DataGrid wrap-up Mass Storage Management J Jensen
CREAM Status and plans Massimo Sgaravatto – INFN Padova
JRA1 Middleware re-engineering
Massimo Sgaravatto INFN Padova
All-Hands Meeting Outcome and Discussion
Summary Report Project Name:
EGEE Middleware Activities Overview
EO Applications Parallel Session
E-Infrastructure for Testing, Integration and Configuration of Software Alberto Di Meglio CERN, INFN, Engineering, 4D Soft, University of Wisconsin.
Marc-Elian Bégin ETICS Project, CERN
WP2: Infrastructure and Service Management
ETICS Pool for IPv6 tests
SA2: Quality Assurance Status Report
JRA1 (Middleware) Overview
Infrastructure Support
WP5: Dissemination, studies, web portal and tools
The ETICS Build and Test Service
ETICS Services Management
LCG Operations Centres
Leigh Grundhoefer Indiana University
Presentation transcript:

Elisabetta Ronchieri WP3 WP3 Status Update Elisabetta Ronchieri WP3

Content State of the Recruitment State of the Deliverables/Milestones Reminder of WP3 Objectives/Tasks Workplan

State of the Recruitment From 01/01/06 Guillermo Diez-Andino Sancho 100% Enrico Ferro 50% Elisabetta Ronchieri and Matteo Selmi were still on EGEE and have contributed as required to start up the activities and avoid delays From 01/04/06 Enrico Ferro 100% Elisabetta Ronchieri 100% Matteo Selmi 50% During these months strong collaboration with Alberto Di Meglio WP1 and Marc-Elian Begin WP5

WP3 Comand Line Interfaces Team composition Current WP3 team WP3 Leader INFN Elisabetta Ronchieri WP3 Deputy INFN Enrico Ferro WP3 Comand Line Interfaces INFN Elisabetta Ronchieri, Matteo Selmi, Enrico Ferro WP3 Web Service CERN Guillermo Diez-Andino Sancho

State of the Deliverables/Milestones List of deliverables D3.1 Configuration Build and Integration Specification at PM03 (DONE) https://edms.cern.ch/file/713365/1.2/ETICS-D3.1-713365-ConfigurationBuildSpecifications-v1.2.pdf D3.2 Interoperability Reports Specifications, Configuration, Build and Intgegration System at PM12 D3.3 Final Evaluation report and configuration, build and integration system at PM22 List of milestones M3.1 Configuration, Build and Integration System deployed in the ETICS resource pools (prototype) at PM12 M3.2 Configuration, Build and Integration System deployed in the ETICS resource pools (Final Release) at PM22 D3.1 Configuration, Build and Integration Specifications PM03 (31 March) Contribution for the Quarterly report PM03 (DONE)

Reminder of WP3 objectives/taks List of objectives Provide a configuration schema to capture the configuration information of software developed by projects Provide a configuration, build and integration system based on existing or adapted tools List of tasks Define and analyze requirements starting from existing software projects, such as EGEE, DILIGENT, etc. Verify requirements for new EU projects or national initiatives: EU-OMII, etc. Adapt and maintain software tools for building, configuring and testing software Collaborate with WP2 in the deployment of tools Collaborate with WP4 in the definition and integration of middleware project tests

Workplan 1/3 31 March 14 April -> 19 May Complete Read Mode Commands and Read WS Methods (DONE) etics-workspace-setup etics-get-project etics-checkout etics-build etics-list-project etics-list-resource etics-list-platform etics-list-property etics-list-configuration etics-show-configuration-structure etics-test 14 April -> 19 May Add the hash in the build command (DONE) Complete the job submission via NMI (DONE) etics-remote-build Add the packager in the client command (DONE)

Workplan 2/3 31 May 31 May -> 16 June Define methods for the handling of users and roles Define new commands etics-list-user, etics-list-role, etics-user and etics-role Prototype for Edit mode commands and Edit WS Methods etics-platform etics-module 31 May -> 16 June Complete Edit mode commands and WS Methods etics-configuration etics-command tics-resource etics-property

Workplan 3/3 30 June 30 June -> 16 July ??? Complete security checks in Edit commands Complete user and role Commands etics-user etics-role etics-list-user etics-list-role 30 June -> 16 July Add the report. ??? etics-status-build We are waiting for WP2 API or command in order to get the status of the build. etics-remote-test