Cristina Nelson, Term Project, CEE 6440, Fall 2007

Slides:



Advertisements
Similar presentations
Hydrologic Analysis Dr. Bedient CEVE 101 Fall 2013.
Advertisements

Flood and Runoff estimation methods
Spatial Analysis with ArcView: 2-D. –Calculating viewshed –Calculating line of sight –Add x and y coordinates –Deriving slope from surface data –Deriving.
URBAN FLOOD MODELING Concepts & Models. 2 Different Approaches For Modeling an Urban Flood Hydrological Approach Objective is to generate a storm hydrograph.
1 Urban Drainage System Analysis & Design CEVE 512 Hydrologic Design Lab Spring 2011.
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
CHARACTERISTICS OF RUNOFF
Introduction to Surface Water Hydrology and Watersheds Lecture 1 Philip B. Bedient Rice University November, 2000.
Drainage.
Watershed Management Runoff models
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
Ch  Know how to determine peak flow using the rational method 2.
The Objectives of storm water drainage To prevent erosion in hillside areas (paved roads and terracing are needed) To prevent land-slides To improve the.
Reading: Applied Hydrology, Sec 15-1 to 15-5
Lecture ERS 482/682 (Fall 2002) Rainfall-runoff modeling ERS 482/682 Small Watershed Hydrology.
PrePro2004: Comparison with Standard Hydrologic Modeling Procedures Rebecca Riggs April 29, 2005.
Surface Drainage CE 453 Lecture 25.
CE 3372 – Lecture 10. Outline  Hydrology Review  Rational Method  Regression Equations  Hydrographs.
Estimating Qmax Using the Rational Method
FNR 402 – Forest Watershed Management
Watershed Management Water Budget, Hydrograph Analysis
WinTR-20 SensitivityMarch WinTR-20 Sensitivity to Input Parameters.
Project Our group collaborated with students at the University of Zacatecas (UAZ) to accomplish the following: 1- Create an accurate hydrologic model which.
Time of Concentration and Lag Time in WMS Ryan Murdock CE 394K.2.
Review of SWRCB Water Availability Analysis Emphasis on Dry Creek Water Availability Analysis.
WinTR-20 SensitivityFebruary WinTR-20 Sensitivity to Input Parameters.
STORMWATER MANAGEMENT
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
CE 3354 Engineering Hydrology Lecture 9: Rational Equation Method Introduction to HEC-HMS.
ARC GIS IN THE SANTA RIVER BASIN IN PERU GIS in Water Resources Fall 2006 Professor: Dr. David Maidment Presented by Presented by Eusebio Ingol.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
Synthetic UH Definition: Synthetic Hydrograph is a plot of flow versus time and generated based on a minimal use of streamflow data. Example: A pending.
Flood Routing Applied Hydrology
HYDROGRAPH is a graph showing the rate of flow (discharge) versus time past a specific point in a river, or other channel or conduit carrying flow. It.
Sanitary Engineering Lecture 4
Detention Basics
Kristina Schneider February 27, 2001
Modified Rational Method
Innovation Through GIS

Basic Hydrology & Hydraulics: DES 601
Nathan Lowe, Shawn Stanley and Jeffery Crump
Prepared by: Sulyman Khraishe Madhat Z
Modified Rational Method
GEM 4409 Hydrology Fall 2005 TROY UNIVERSITY.
Map-Based Hydrology and Hydraulics
Guidance on Homework Report Tc and R for each watershed
CTC 450 Review Distributing flow in a pipe network Hardy-Cross Method
GIS for Water Resources Cee 6440
GIS in Water Resources Presentation By: Zac Sharp
GIS FOR HYDROLOGIC DATA DEVELOPMENT FOR DESIGN OF HIGHWAY DRAINAGE FACILITIES by Francisco Olivera and David Maidment Center for Research in Water Resources.
What Causes Flooding along the Logan river
Hydrology.
Highway Drainage: Determining Flow Rates
Hydrologic Analysis of the Hyrum Reservoir watershed
Time of Concentration.
INTRODUCTION TO HYDROLOGY
Regional Hydraulic Model for the City of Austin
Brian McInerney Hydrologist National Weather Service
Determining Peak Flows
Hyetographs & Hydrographs
From GIS to HMS U.S. Army Corps of Engineers Hydrologic Engineering Center University of Texas at Austin Center for Research in Water Resources Francisco.
Preciptation.
Love Field Modernization Program
WRE-1 BY MOHD ABDUL AQUIL CIVIL ENGINEERING.
Preciptation.
Creating Watersheds and Stream Networks
بسم الله الرحمن الرحيم (وقل ربي زدني علما)
HYDROLOGICAL Study for DESIGN AL MALEH DAM
Preciptation.
Presentation transcript:

Cristina Nelson, Term Project, CEE 6440, Fall 2007 Watershed Analysis, Detention Basin Flood Routing, and Outflow Path Analysis of Rudd Creek Drainage. Farmington, Utah Project Location Cristina Nelson, Term Project, CEE 6440, Fall 2007

Detention Basin Rudd Creek

Background The Rudd Creek canyon outlet is in a residential area on the East bench of Farmington City. In 1983 a large flood and debris flow destroyed 35 homes, causing 3 million dollars in damages. In 1984 an emergency detention basin was built at the canyon mouth, Berms were built along some roads, and new development in the area was restricted. Recently Farmington City has been asked to open development for land parcels near the canyon mouth. City officials believe the Basin will overtop in the 100 year storm.

Methods: - Delineate Watershed Objectives: Study the Rudd Creek watershed and the detention basin to determine the100 year flood and if the Basin will overtop. Also, make preliminary flood plain estimates for the undeveloped Land. Methods: - Delineate Watershed - Calculate 100 Year Maximum Flow Rates - Create Basin Flood Routing Model - Determine if Basin will Overtop in 100 year flood - Detention Basin maximum outflow rate and drainage paths.

GIS Data Sources GIS Analysis 5 meter resolution DEM (AGRC) 1 ft Orthophotographic image (AGRC) GIS Analysis Terrain Analysis - Watershed delineation Spatial Analyst Slope analysis Statistics and Histograms Hill shade Networks Length and weighted Slope of Longest flow path

Arc-Hydro 9 Tools: Terrain Analysis Trim DEM to Study Area (Extract by Mask) 5 meter DEM reconditioning (fill sinks * burn in streets) Flow Directions Flow Accumulation Stream Definition & segmentation Catchment Delineation and processing Drainline Processing

Watershed Delineation Batch Point Watershed Delineation (At Detention Basin) Results: - Drainage area = 0.77 mi2 - Weighted Average Watershed Slope = 42% - Weighted Average Stream Slope = 46.6 % - Longest drainage Path = 13,287 ft long

100 Year Flood Event Rational method Qmax =CiA I is the rainfall intensity (IDF Curves) A is the drainage area = 0.77 square miles Where C is the runoff coefficient. C is usually determined from land cover tables. This approach does not work well for steep mountain watersheds. Less infiltration times on steeper slopes leads to greater C values C is primarily a function of Slope, at slopes greater 10% Rudd Creek watershed is too steep (42% average slope)

“Rational Coefficients for Steeply Sloped Watersheds” Runoff Coefficient Research Paper: “Rational Coefficients for Steeply Sloped Watersheds” (Cutter & McCuen, 2007) Where: -Co is the runoff coefficient at a 6% slope -S is the Slope -n is the manning's value Slope function in the Spatial Analysis was used to create a histogram of slopes classes versus area.

Runoff Coefficient C = 0.67 Slope Class Histogram Area Slope (%) Classes Area Used slope class histogram to calculate a weighted average C for the watershed C = 0.67

Intensity Tc = 15 min. I = 3.68 (in/hr) Qmax=CIA = 1,200 cfs Intensity was determined from Farmington City Engineer’s IDF Curves. - Frequency = 100 year storm Duration is equal to the time of concentration (Tc) Tc was calculated from longest drainage path length, slope, and estimated channel characteristics to be used in Manning’s Equation. Overland Flow Channel Flow Tc = Tt1 = Tt2 Tc = 15 min. I = 3.68 (in/hr) Qmax=CIA = 1,200 cfs

Detention Basin Flood Routing Model Model Applied using Step Method in a Spreadsheet Basin Influent Qmax = 1,200cfs, - Estimated influent hydrograph Detention capacity 14 acft, Depth as a function of Storage equation Model Outlet structures to determine Outflow hydrograph Low level outlet pipe Capacity 50 cfs, piped to the river. Emergency overflow spillway capacity 1000 cfs, modeled as a weir with known spillway dimensions. Peak Outflow Q Pipe = 50 cfs Q Spillway = 880 cfs Q Total = 930 cfs Thus Basin embankment is not overtopped in 100 year storm.

Flood Mapping Need more detailed DEM and surveyed cross section to create a HEC-RAS based Flood Map For the purpose of this project, simplistic methods were used to estimate the flow path of the discharge out of the emergency spillway to Farmington Creek 5 meter DEM Streets and other known smaller flow paths burned into DEM With AGREE DEM reconditioning Flow path Tracing

Basin

Conclusions and Recommendations Watershed 100 year flow, Q = 1200 cfs Max basin outflow Qout = 930 cfs Basin will not be overtopped in 100 year event Some of the undeveloped area is effected by the flow path predictions. The area may be able to opened for development if a Berm is created to contain flow to the streets near 500 North and Main Street. More accurate flood plain mapping data and analysis is still needed. Better estimates of the shape of the Basin’s influent hydrograph could be made by studying adjacent watersheds.

Questions?