08.09.2011 Region between TAXN and D2 in HL-LHC IR1/5: Implications on Collimator Design Alessandro Bertarelli, L. Gentini (EN/MME) On behalf of the LHC.

Slides:



Advertisements
Similar presentations
Recap of heat loads and peak doses from HL-LHC Q1 to Q7 L.S. Esposito, F. Cerutti HL-LHC WP3 meeting, 22 May 2014.
Advertisements

FLUKA studies: channeled ions on LHC IP7 L. Lari (CERN & IFIC (CSIC-UV)) D. Mirarchi (CERN & ICL) A. Lechner (CERN) ColUSM#32 December the 6 th,
ENEN RF-induced heating on TCTP ferrite: comparison between different support materials F. Carra, A. Bertarelli, A. Dallocchio, M. Garlasche’,
IR 2 Vacuum Update M. Sullivan for PEP-II team For the 2e34 meeting of Feb. 15, 2006.
Actuation and Alignment Challenges of LHC Collimators M. Garlaschè on behalf of the EN\MME collimation team 1 st PACMAN Workshop CERN, Geneva, Switzerland.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Engineering Department ENEN Choice of the material for TCTP ferrite supports Collimation Working Group F. Carra, G. Cattenoz, A. Bertarelli,
Engineering Department ENEN 16/08/2013 LR - BBC Pre-Study 1 STATUS of BBC DESIGN and ENGINEERING : PRELIMINARY RESULTS G. MAITREJEAN, L. GENTINI.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
1 Hi-Lumi WP3 meeting Update on the Q1 to D1 cryostat Jan 28, 2014  Outline  Cryostat cross section options  Elliptical interconnect.
Collimation Meeting Tests on a Fully Assembled TCT Collimator in the HiRadMat Facility M. Cauchi, D. Deboy, on behalf of the Collimation Team.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
A. Bertarelli CERN TS – MME Group 1 CERN European Organization for Nuclear Research Actuating system of the LHC Collimators (Phase 1) Main Features.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
LHC Crystal MD 22/09/2015 – LSWG #7 R. Rossi for the LHC Collimation team and the UA9 Collaboration.
TBM Vacuum considerations Alex Vamvakas 15/07/2015.
Review of Mechanical Movement and Motorization for LHC Collimators The LHC Collimation project LHC Collimators for Phase 1 Alessandro Bertarelli.
Lukasz Krzempek TE-VSC-DLM 28th WP8 Bi-weekly meeting Tuesday, 24 November 2015 Vacuum layout (Experimental side)
Updated Design of TCLD whit reduced jaw length Collimation Upgrade Specification meeting L. GENTINI.
TAS-Q1 Status & what if exercise Etude [HL-LHC] TAS-Q1.
Shielding the 140 mm option F. Cerutti, L.S. Esposito on behalf of CERN FLUKA team.
CMS TAXS REGION D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
HRM28-TCDI Updates October 28 th, 2015 Fausto Lorenzo Maciariello, on behalf of the TCD Team.
Sergio Calatroni TS/MMETS Workshop, Archamps RF Fingers for Secondary Collimators What is that? Constraints for design Choice of materials:
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
ColUSM #63 18 th September, 2015 D. Ramos, C. Mucher, L. Gentini, H. Prin, Q. Deliege, A. Bastard, J. Hrivnak.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Francesco Cerutti, Andrea Tsinganis WP10 Energy deposition & R2E
TCT BLM response from tertiary halo at 6.5 TeV
Cold mass design, assembly plans and QA/QC at CERN
L. Gentini, A. Bertarelli, F. Carra
Alignment of VSC components along LSS 1&5
TAXS and TAXN ABSORBERS - OVERVIEW
TANB Integration – LS2 BLM Relocation Proposal C4R8 and C4L8
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
A. Rossi on behalf of the whole team:
Preliminary Y-chamber specifications – First draft
Components for the Machine-Interface Regions
FE study of the reinforcement configurations of the vacuum vessel November 10th 2014 Method: individual interviews with group leaders based on the.
M. Alcaide Leon, Paolo Fessia
M. Alcaide Leon, Paolo Fessia
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
TCTW Collimator Design F. Carra1,2 A. Bertarelli, M. Garlasche, L
Mauro Morandin & Antoine Daël
Superconducting RF Crab Cavities
Impedance working group update
DEBRIS IMPACT IN THE TAS-TRIPLET-D1 REGION
WP3 meeting Aug 21, 2015 V1.1 RECAP Francesco Cerutti.
X-Rays made by P. Lepeule (TE/VSC) and J-M Dalin (EN/MME)
Phase II Collimators : design status
HiRadMat Test Facility
goteachmaths.co.uk Volume of a Cuboid – Complete Lesson
LARP Phase II Secondary Collimator RC-1
Status of energy deposition studies IR7
DQW HOM Update and Recent Developments
LHC Collimator – RF Contact Concept (180o wrap)
LHC collimation review follow-up Impedance with IR3MBC option & comparison with phase 1 tight settings N. Mounet, B. Salvant and E. Métral Acknowledgements:
A. Tsinganis, F. Cerutti (EN/STI/FDA)
HL-LHCV1.4 (BI) R. De Maria WP13 meeting 3/9/2018.
Electron Collider Ring Magnets Preliminary Summary
HL-LHC - WP15 modifications Coffrets Prise C4L8
HL-LHCV1.4 (BI) R. De Maria WP13 meeting 3/9/2018.
Presentation transcript:

08.09.2011 Region between TAXN and D2 in HL-LHC IR1/5: Implications on Collimator Design Alessandro Bertarelli, L. Gentini (EN/MME) On behalf of the LHC Collimation Team HiLumi LHC Goes To Industry Workshop CERN, Geneva, Switzerland – 26 June, 2015

Layout Overview HL-LHC Collimators between TAXN and D2 08.09.2011 Layout Overview HL-LHC Collimators between TAXN and D2 Preliminary design studies on TCTPH, TCTPV and TCLx started in EN/MME (L. Gentini) in December A. Bertarelli, L. Gentini EN/MME 67th ColUSM 05.02.2016

Specifications and Constraints HL-LHC Collimators between TAXN and D2 TCTPH TCTPV TCLx Orientation Horizontal Vertical Absorber Material Inermet IT180 Absorber Cross-section 34 x 20 mm2 70 x 40 mm2 Jaw Stroke 30 (+5) mm 40 (+5) mm Interference* with present layout 43 mm 11.3 mm 58.1 mm * Interference calculated assuming a standard collimator tank and including baking equipment thicknesses (tank jacket thickness 25 mm and/or vacuum chamber wrapping 5 mm) and a ID/OD 90/94 mm vacuum chamber Source: A. Rossi (BE/ABP) N. Joannon (EN/ACE) A. Bertarelli, L. Gentini EN/MME 67th ColUSM 05.02.2016

TCTPH – Interference in present layout HL-LHC Collimators between TAXN and D2 A. Rossi (BE/ABP) N. Joannon (EN/ACE) A. Bertarelli, L. Gentini EN/MME 67th ColUSM 05.02.2016

Thicker Back-stiffener TCTPH – Slim Jaw Design HL-LHC Collimators between TAXN and D2 Slim jaw design: Thickness optimization of jaw assembly allows saving 10 mm per side, keeping same jaw functionality This translates into a 20 mm reduction of the tank width New design of sliding tables is required (reduced span) Still not enough to cancel off interference (8 mm more to go assuming an “all-embracing” heating jacket) Slim Design Standard Design Axle offset inward 10mm Thicker Back-stiffener A. Bertarelli, L. Gentini EN/MME 67th ColUSM 05.02.2016

TCTPH – “All-embracing jacket” HL-LHC Collimators between TAXN and D2 A. Bertarelli, L. Gentini EN/MME 67th ColUSM 05.02.2016

TCTPV HL-LHC Collimators between TAXN and D2 Longer stroke (40 mm) translates into larger tank (+ 20 mm). This does not appear to be an issue; otherwise, slim jaw design can be adopted keeping present tank width unchanged. New larger bellows required. New sliding table design (different from TCTPH’s) 11 mm interference not yet addressed (e.g. possible piping re-routing?) A. Rossi (BE/ABP) N. Joannon (EN/ACE) A. Bertarelli, L. Gentini EN/MME 67th ColUSM 05.02.2016

TCLX - Interference in present layout HL-LHC Collimators between TAXN and D2 A. Bertarelli, L. Gentini EN/MME 67th ColUSM 05.02.2016

TCLX HL-LHC Collimators between TAXN and D2 Large interference (up to 58 mm) forces to have a 2-in-1 design Preliminary proposal to be further optimized: L. Gentini (EN/MME) A. Bertarelli, L. Gentini EN/MME 67th ColUSM 05.02.2016

Thicker and higher absorbers (40x70) TCLX HL-LHC Collimators between TAXN and D2 Ad-hoc jaw. Structural design to be checked. New sliding table Thicker and higher absorbers (40x70) L. Gentini (EN/MME) A. Bertarelli, L. Gentini EN/MME 67th ColUSM 05.02.2016