TTC UPGRADE FOLLOW-UP Sophie Baron, Angel Monera Martinez LECC 2006

Slides:



Advertisements
Similar presentations
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
Advertisements

Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Sophie BaronTTC1 TTC status February 2005 ATLAS electronics.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Sophie BARON, PH-ESSLEADE - 07 Nov  TTC system status reminder  Upgrade principle  [Some] details about the infrastructure  Practical implementation.
Local Trigger Unit for NA62 Marián Krivda 1), Cristina Lazzeroni 1), Vlado Černý 2), Tomáš Blažek 2), Roman Lietava 1)2) 1) University of Birmingham, UK.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
JgimenoIWM-12/1/2004 Fiber Optic module 1 STUDIES AND DEVELOPMENT OF A FIRST FIBER OPTIC MODULE PROTOTYPE Javier Gimeno Vicente.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
TTC for NA62 Marian Krivda 1), Cristina Lazzeroni 1), Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava, Slovakia 3/1/20101.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Work Review Angel Monera Martinez. Index Objectives Time Frame Analog Link  Analog Requirements  Miteq Characterization and tests Digital Link  Requirements.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
Sophie BARON, PH-ESSLEADE, 15/06/06 1 TTC upgrade Status May 2006  Overview  AB/RF optical links  Receiver crate  Status and schedules  Documentation.
Adam Marmbrant Samuel Silverstein Stockholm University Link Test Status.
BPM stripline acquisition in CLEX Sébastien Vilalte.
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
4 Channel DAC (Petri): 3 boards available for testing (version 1)-> now Transition board-> 22/12/2010 End of Hardware tests-> 28/01/2011 Attached DDC firmware.
NA62 GigaTracKer Working Group meeting December 13, 2011 Matthew Noy & Michel Morel Status of test for GTK carrier and components.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
HO / RPC Trigger Links Optical SLB Review E. Hazen, J. Rohlf, S.X. Wu Boston University.
Work on Muon System TDR - in progress Word -> Latex ?
DAQ ACQUISITION FOR THE dE/dX DETECTOR
LCLS_II High Rep Rate Operation and Femtosecond Timing
Upgrade activities at Clermont-Ferrand
Production Firmware - status Components TOTFED - status
Monitoring system commissioning
ETD meeting Electronic design for the barrel : Front end chip and TDC
Injectors BLM system: PS Ring installation at EYETS
Ewald Effinger, Bernd Dehning
Interesting use-cases
RF-TTC Joint News LEADE, June 2008
T1 Electronic status Conclusions Electronics Cards:
Status of the Beam Phase and Intensity Monitor for LHCb
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
MCPPMT test bench at LAL D. Breton, L. Burmistov, J. Maalmi, V
BCTW calibration status and future
Setup for measurements with SCT128 in Ljubljana: SCTA128VG chip
Ongoing R&D in Orsay/Saclay on ps time measurement: a USB-powered 2-channel 3.2GS/s 12-bit digitizer D.Breton (LAL Orsay), E.Delagnes (CEA/IRFU) Séminaire.
Old ROD + new BOC design plans
WP02 PRR: Master Oscillator and RF Reference Distribution
TTC System Status May 2007 System overview Production Status
TTC system for FP420 reference timing?
QUARTIC TDC Development at Univ. of Alberta
Calorimeter Upgrade Meeting - News
Strategy for long-term support of the TTC system
TTC Information Meeting
Trigger system Marián Krivda (University of Birmingham)
FPGA Based Trigger System for the Klystron Department
Optical links in the 25ns test beam
Interesting use-cases
LHC Fast Timing Commissioning
The ATLAS LAr. Calibration board K. Jakobs, U. Schaefer, D. Schroff
TTC news December 04 Sophie Baron TTC.
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
Digitally subtracted pulse between
The LHCb Front-end Electronics System Status and Future Development
Beam instrumentation and background monitoring
TTC setup at MSU 6U VME-64 TTC Crate: TTC clock signal is
Presentation transcript:

TTC UPGRADE FOLLOW-UP Sophie Baron, Angel Monera Martinez LECC 2006 Sophie BARON, PH-ESS LECC 2006, VALENCIA

Analogue versus Digital First results Status Conclusion TTC upgrade principle Transmitter Crate Receiver Crate Analogue versus Digital First results Status Conclusion Sophie BARON, PH-ESS LECC 2006, VALENCIA

TTC UPGRADE [principle] RD12 system for TTC backbone obsolete Few spares Design not documented No 24/24 support Upgrade necessary Using up-to-date components Find a solution for 24/24 support (-> AB/RF piquet) condition: use the same Tx and Rx modules as the AB/RF group Tx Crate with AB/RF standard Tx modules Optical splitter Rx Crate Rx modules & a TTC specific adjustment module SR4 CCR Experiments Sophie BARON, PH-ESS LECC 2006, VALENCIA

Analogue versus Digital First results Status Conclusion TTC upgrade principle Transmitter Crate Receiver Crate Analogue versus Digital First results Status Conclusion Sophie BARON, PH-ESS LECC 2006, VALENCIA

TRANSMITTER CRATE [Overview] VME 6U RF-compliant crate (J2 not standard VME) Provided by AB/RF Installed in the SR4 (where the RF is generated) Controlled, supported and maintained by AB/RF Filled with transmitter VME modules used by the AB/RF group to transmit their own signals Optical components were already identified, but It turned out that the VME modules were not designed yet Design made by PH/ESS for the AB/RF group PH/ESS proposed to AB/RF a second version of these modules with cheaper components (which could fulfill the requirements of 70% of their equipment) One laser chip per signal to be transmitted 3 Bunch Clocks (ring1, ring2, reference) 2 Orbit signals (ring1, ring2) Optical Transmitter boards for BC and Orbit transmission to experiments 2 versions being currently studied Optical Transmitter boards for RF internal use Crate Controller Sophie BARON, PH-ESS LECC 2006, VALENCIA

TTC upgrade principle Transmitter Crate Receiver Crate Analog versus Digital First results Status Conclusion Sophie BARON, PH-ESS LECC 2006, VALENCIA

RECEIVER CRATE [Overview] 6U VME 64x crate Installed in each experiment (instead of the TTCmi) One receiver per signal to be transmitted 3 Bunch Clocks (ring1, ring2, reference) 2 Orbit signals (ring1, ring2) Receiver boards supported and maintained by AB/RF 2 different versions being studied now (one ‘Analog’ and one ‘Digital’) Other modules & equipment supported by the experiments, maintained by PH/ESS RF2TTC module Designed by PH/ESS Supported by the experiments Maintained by PH/ESS-TTC team Multiplexing and adjustment of the BC and Orbit signals AB/RF receiver modules Designed by PH/ESS Supported & maintained by AB/RF 2/3 Rx per VME module (depending on the versions) Optional Fanout Module Designed by PH/MIC Supported by the experiments Maintained by PH/ESS-TTC team Sophie BARON, PH-ESS LECC 2006, VALENCIA

RECEIVER CRATE [Crate Controller] ALICE: Standard VP315/317 from CCT ATLAS: Standard VP110 from CCT CMS: CAEN PCI-controller card A2818 + V2718 VME-PCI optical bridge LHCb: CAEN V1718 VME-USB bridge OR OR Sophie BARON, PH-ESS LECC 2006, VALENCIA

RECEIVER CRATE [RF_Rx – ‘Analogue’ version] Design done by PH/ESS (A. Monera) The corresponding Transmitter module has been designed by PH/ESS as well Specifications written by the AB/RF group Tx and Rx components selected by the AB/RF group Initially to transmit the LHC RF (400MHz continuous sinewave) 6U VME modules (VME 64x and VME 64 compatible) 2 receivers per module Internal registers monitoring the optical power levels Heat sink required (..) to keep the Miteq Rx and Tx at about 35 C Deg. EDA-1332 A. Monera Martinez See details in following section Sophie BARON, PH-ESS LECC 2006, VALENCIA

RECEIVER CRATE [RF_Rx – ‘Digital’ version] Proposed by PH/ESS to AB/RF to replace the Analogue version where a cheaper laser could do the job. Typically 400MHz or 40MHz clocks, Orbits, etc… If accepted by AB/RF, would be supported and maintained by them as well. Design done by PH/ESS (A. Monera) The corresponding Transmitter module has been designed by PH/ESS as well 6U VME (VME 64x and VME 64 compatible) 3 types of optical receivers according to various requirements Various types of receivers can be plugged with minor hardware adjustments Allows us to compare their performances in real conditions Internal registers Signal detect (R) Frequency detect for each channel (Read Only) Threshold level adjustment (R/W) Firmware very close to the Analogue version EDA-1382 A. Monera Martinez See details in following section Sophie BARON, PH-ESS LECC 2006, VALENCIA

RECEIVER CRATE [RF2TTC] Inputs 3 BC inputs (SMA or Lemo00) (RF signals, BC1, BC2, BCref) 2 Orbit inputs (RF signals, Orb1, Orb2) 1 BST input (optical) Outputs 4 ECL BC outputs (BC1, BC2, BCref, MainBC) AC coupled 4 NIM copies 3 ECL Orbit outputs (Orb1, Orb2, MainOrb) DC/AC coupled Synchronised respectively to BC1, BC2, MainBC 3 NIM copies Adjustments & Features Each BC input has: Threshold adjustment Multiplexing with internal source Fine delay QPLL Each Orbit input has: Fine delay for the synchronisation Multiplexing with internally generated orbit (adjustable period) Adjustable length and polarity Coarse delay adjustment (in 25ns steps) Fine delay of the output EDA-1357 S. Baron Sophie BARON, PH-ESS LECC 2006, VALENCIA

RECEIVER CRATE [BC & Orbit fanout] Dual 1:18 ECL fanout 4 NIM outputs per input (ALICE requirement) 1 status led per input (presence of clock / orbit). Maximum density The 2 halves can be daisy chained. EDA-1240 C. Sigaud Sophie BARON, PH-ESS LECC 2006, VALENCIA

Analogue versus Digital First results Status Conclusion TTC upgrade principle Transmitter Crate Receiver Crate Analogue versus Digital First results Status Conclusion Sophie BARON, PH-ESS LECC 2006, VALENCIA

ANALOGUE VERSUS DIGITAL [Modules] 1kCHF .8kCHF RF_Tx_D EDMS Ref: EDA-01380 EDMS Ref: EDA-01382 or Photon PT5343-300MHz 250 $ - Obsolete OCP STX03-300MHz 350 $ OCP STX24-1.5GHz 600 $ Truelight TRR-1B43-00-150MHz 8$ OCP SRX03-300MHz 200 $ OCP SRX24-1.5GHz 300 $ ANALOGUE SET Designed for RF transmission (sinewave) Phase noise <5ps (pk-pk!). (more info) 2 Optical links per module Optical power budget 10-15dB DIGITAL SET 40MHz & 5ns pulses transmission Jitter <30ps rms 3 Optical links per module Optical power Budget 25dB Various Tx and Rx can be installed 5kCHF RF_Tx_A EDMS Ref: EDA-01331 4kCHF RF_Rx_A EDMS Ref: EDA-01332 Sophie BARON, PH-ESS LECC 2006, VALENCIA

ANALOG VERSUS DIGITAL [Systems] SR4 5kCHF Rx Tx X6 = 34k 1kCHF .8kCHF 1.2 kCHF per link SR4 EXP CCR Tx 4kCHF CCR Rx Tx X6 = 204k 7 kCHF per link Rx Rx Rx Rx Rx EXP Sophie BARON, PH-ESS LECC 2006, VALENCIA

ANALOGUE VERSUS DIGITAL [Production] ANALOGUE SET Users: AB/RF for continuous sinewave transmission Quantities: about 15 links DIGITAL SET Users: TTC (BC & Orbit) & AB/RF & AB/BT with: OCP STX03 TRR-1B43 AB/RF for 400MHz with: OCP STX24 OCP SRX24 Quantities: about 80 links Awaiting for AB/RF final agreement Sophie BARON, PH-ESS LECC 2006, VALENCIA

Analogue versus Digital First results Status Conclusion TTC upgrade principle Transmitter Crate Receiver Crate Analogue versus Digital First results Status Conclusion Sophie BARON, PH-ESS LECC 2006, VALENCIA

FIRST RESULTS [From CCR to Build.4 in Meyrin] RD12 TX TTCmi TTC RD12 (LHCrx) 40.078MHz Cy2cy jitter=29ps rms Digital module (TRR receiver) Cy2cy jitter=27ps rms Skew jitter / Rd12 = 36 ps rms Analog module* Cy2cy jitter=18ps rms Skew jitter / Rd12 = 35 ps rms RX CRATE (Analog and Digital modules) CCR MEYRIN TX CRATE *: for the analog module, the setup is: Tx -> Rx -> Tx -> Rx To match the real conditions, where a transceiver at the CCR will be required Sophie BARON, PH-ESS LECC 2006, VALENCIA

FIRST RESULTS [From CCR to North Area - setup] RD12 TX scintillators Recovered Clock & Orbit 25ns structured test beam TTCmi Photo Multipliers & coincidence TX CRATE RX CRATE Trigger NORTH AREA CMS facility LECROY SDA6000 XXL Digital Rx Clock CCR Analog Rx Clock 25ns test beam Scope triggered about 90 times per spill Delays measured between the trigger falling edge and the closest rising edge of the 3 different clocks Thanks to Jan Troska for having made this setup available Sophie BARON, PH-ESS LECC 2006, VALENCIA

FIRST RESULTS [From CCR to North Area - results] Analog Clock TTCrd12 Clock Digital Clock => Histogram shape given by the high beam jitter vs the clock Sophie BARON, PH-ESS LECC 2006, VALENCIA

Analogue versus Digital First results Status Conclusion TTC upgrade principle Transmitter Crate Receiver Crate Analogue versus Digital First results Status Conclusion Sophie BARON, PH-ESS LECC 2006, VALENCIA

STATUS HARDWARE INFRASTRUCTURE SOFTWARE EQUIPMENT STATUS Crates AVAILABLE Controllers RF2TTC 1 Proto just arrived at CERN RF_Tx_A and RF_Rx_A 5 Protos of each being now evaluated by PH/ESS, AB/RF, AB/BT RF_Tx_D and RF_Rx_D Fanout Protos-V1 tested, Proto-V2 at CERN in the following weeks EQUIPMENT STATUS Fibers RESERVED and installed. The patching campaign will begin in November Splitters AVAILABLE for the Analogue version. To be ordered for the digital one. STATUS Test functions WRITTEN (M. JOOS) API UNDER SPECIFICATION (M. JOOS in collaboration with the experiments) Sophie BARON, PH-ESS LECC 2006, VALENCIA

TTC upgrade principle Transmitter Crate Receiver Crate Analog versus Digital First results Status Conclusion Sophie BARON, PH-ESS LECC 2006, VALENCIA

CONCLUSION Transmission Schemes RF2TTC prototype just arrived at CERN Analogue version validated (at, say, 90%) 5 prototype boards available (= 10 links) Digital version in course of validation 5 prototype boards available (= up to 30 links) Extended tests to be done in the TTC lab Being tested by all the AB potential users right now The AB/RF group needs to give its agreement to have these modules as standard modules Mandatory, as they will do the on-call support RF2TTC prototype just arrived at CERN System test to begin next week, with the following criteria Jitter test System stability and reliability Characterization (temperature, optical power range,..) Production Readiness Review to be done in November Can be preceded by tests done by experiments if they request it Production to begin only after a green light from AB/RF group and experiments 3 RF2TTC modules per experiment + 3 at the TTC lab + PCB and components for 10 more spares 3 RF_Rx (in the digital case) per experiment + 3 in the TTC lab, spares (pool of spares maintained by the AB/RF, + extra batch of critical components) Sophie BARON, PH-ESS LECC 2006, VALENCIA