Status of Virgo GWDAW Dec 13-16

Slides:



Advertisements
Similar presentations
For the Collaboration GWDAW 2005 Status of inspiral search in C6 and C7 Virgo data Frédérique MARION.
Advertisements

Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
GWDAW 16/12/2004 Inspiral analysis of the Virgo commissioning run 4 Leone B. Bosi VIRGO coalescing binaries group on behalf of the VIRGO collaboration.
Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
Virgo commissioning update - VSR1 first month summary E. Tournefier WG1 meeting, Cascina June 20 th,2007.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
G D Interferometer Status LSC Meeting, Ann Arbor, June 4, 2005 Daniel Sigg.
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
Present Superatttenuator performance vs. AdV & ET Requirements S.Braccini for Virgo Suspension group.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
Virgo Control Noise Reduction
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.
Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
Status of LIGO Data Analysis Gabriela González Department of Physics and Astronomy Louisiana State University for the LIGO Scientific Collaboration Dec.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
G Amaldi Meeting 2015, Gwangju, South Korea1 Status of LIGO June 22, 2015 Daniel Sigg LIGO Hanford Observatory (on behalf of the LIGO Scientific.
Novemebr 5, 2006LSC meeting1 Virgo Update Prospects on detector performance and running schedules B. Mours.
Status of Virgo A. Viceré INFN-Firenze – Università di Urbino.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
January 12, 2006ILIAS-WG3 Frascati1 Virgo+ & Advanced Virgo B. Mours With material from G. Losurdo, M. Punturo, A. Viceré and others.
GWDAW11, Postdam 18th-21th December 2006 E. Cuoco, on behalf of Virgo collaboration 1 “Data quality studies for burst analysis of Virgo data acquired during.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
Status of coalescing binaries search activities in Virgo GWDAW 11 Status of coalescing binaries search activities in Virgo GWDAW Dec 2006 Leone.
MSC - 18 Oct 071 LOW FREQUENCY SEISMIC NOISE: LOCKING AND SENSITIVITY ISSUE Paolo Ruggi noise meeting.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
Virgo+ Commissioning Status. Main upgrades and activities Laser system: from 10  25 watt output power at the IMC TCS: ring + Central Heating Electronics:
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
“Detector activities” after the IB upgrade Michele Punturo.
The control of the Virgo Superattenuator: present and future Giovanni Losurdo - INFN Firenze/Urbino on behalf of the Virgo Collaboration.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
International Gravitational Wave Network 11/9/2008 Building an Stefan Ballmer, for the LIGO / VIRGO Scientific Collaboration LIGO G
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
1 DC readout for Virgo+? E. Tournefier WG1 meeting, Hannover January 23 rd,2007 DC vs AC readout: technical noises Output mode cleaner for DC readout.
Advanced Towards Advanced Virgo Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator on behalf of the Virgo Collaboration.
SAT Plans for System R&D Signal Recycling Construction and A&I Short Suspension Upgrade Roberto Passaquieti Università di Pisa and INFN-Pisa AdV Review.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
Advanced Advanced Virgo BASELINE DESIGN advanced Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator for the Virgo Collaboration.
LIGO- G M LIGO Status Stan Whitcomb Oversight Committee 20 October 2004.
10-meter Interferometer Results M. Woods (special thanks to Steve Myers and Tim Slaton) Jan. 31, 2000 Commissioning Setup System Noise Monte Carlo simulation.
Edwige Tournefier for the Virgo Collaboration The status of Virgo.
H1 Squeezing Experiment: the path to an Advanced Squeezer
Type-A SAS Local Control Simulation (Current Status)
October 2006, LIGO Hanford Observatory
Summary of iKAGRA Test Run Apr 11-25, 2016
Virgo Status Detector Status Computing Data Analysis status and Plans
Evolution of the Virgo detector: The Virgo+ plans
Advanced VIRGO Experiment
Virgo Update B. Mours LIGO-G Z August 15, 2006 LSC meeting.
GEO HF Limits/Goals/Options…
Virgo Update – LSC meeting
The views of Virgo collaboration groups on upgraded/advanced Virgo
Status at the Prague meeting
LIGO Scientific Collaboration - University of Michigan
Presentation transcript:

Status of Virgo GWDAW12 2007 Dec 13-16 Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration

Virgo Scientific Run (VSR) 1 organization started on 18th May, ended on 1st Oct (4.5 months) Organization: 3 shifts/day: 1 operator + 1 physicist 1 weekly coordinator Periodic operations: Calibration: ~1.5h/week Maintenance: 4h/week vacuum + infrastructures + commissioning technical fixes or investigations Commissioning: ~6h/week Hardware injections GWDAW 12 - Leone B. Bosi INFN Perugia - On behalf of the Virgo Collaboration

VSR1 Virgo sensitivity Sensitivity at the beginning of the run Sensitivity improved during the VSR1 GWDAW 12 - Leone B. Bosi INFN Perugia - On behalf of the Virgo Collaboration

VSR1 duty cycle statistics Duty cycle: 84% ITF locked and 81% in science mode Long locks: 20 locks longer than 40 hours + longest lock: 94 hours 197 unlocks from “Science Mode” Average Unlocks/Day: 1.8 Main unlock reasons: Technical Maintenance + Commissioning Global control software crash Environmental: Earthquakes bad weather GWDAW 12 - Leone B. Bosi INFN Perugia - On behalf of the Virgo Collaboration

VSR1 duty cycle improvements At the beginning of the run: Several unlocks per week due to earthquakes After unlocks suspensions get very excited  takes a couple of hours to recover a normal condition At the end of the run: Improvements of the suspension control had been implemented in several steps  Earthquake unlocks  1 per week Earthquake guardian:  automated switch to more robust control Suspension differential control:  immune to common displacements Survive to displacements 2-3 times larger GWDAW 12 - Leone B. Bosi INFN Perugia - On behalf of the Virgo Collaboration

VSR1 sensitivity improvements summary Beam centering Control filter Magnetic lines Piezo-actuator noise ( no more “Mystery noise”) Longitudinal control loops Filtering of mirror actuator noise frequency GWDAW 12 - Leone B. Bosi INFN Perugia - On behalf of the Virgo Collaboration

VSR 1 BNS Horizon BNS range (Mpc) The VSR1 horizon It was 3.7 Mpc at the beginning of the run And it was increased above 4Mpc at the end of the run Bad weather BNS range (Mpc) Main causes of horizon variations: bad weather ‘Thermal effects’ combined with control noise non stationarities due to alignment fluctuations GWDAW 12 - Leone B. Bosi INFN Perugia - On behalf of the Virgo Collaboration

After VSR1 Commissioning activity: control noises reduction Control noises (VSR1 control scheme) + environmental noises WE suspension Actuators noise Eddy currents (upper limit) Environmental noise GWDAW 12 - Leone B. Bosi INFN Perugia - On behalf of the Virgo Collaboration

After VSR1 Commissioning activity: Environmental noises – the main limitation Now we know environmental noises are the main sources of disturbance For example we made a test switching OFF the air conditioning devices BNS averaged horizon: 4.4Mpc 5.1Mpc (+16 %) BBH averaged horizon: 8.6Mpc 13.7Mpc (+59 %) There are other possible sources of noise, like the electronic racks close to the towers or in laser lab  Now we are working in order to reduce the environmental noise and understanding the noise coupling path. - AC ON - AC OFF *Horizon estimated with (15;15) Ms BH GWDAW 12 - Leone B. Bosi INFN Perugia - On behalf of the Virgo Collaboration

After VSR1 Commissioning activity: Environmental noises – noise budget Switching Air Conditioning OFF Control noises + environmental noises Actuator noise (DAC) GWDAW 12 - Leone B. Bosi INFN Perugia - On behalf of the Virgo Collaboration

From VSR1 to Virgo+ Plan Priority target Post VSR1/fall 2007: 2008 Virgo+ online at the same time as eLIGO (mid-2009) with matching sensitivity Post VSR1/fall 2007: Few months of commissioning (low and mid frequency) Control noises and environmental noise 2008 Environmental noise mitigation Thermal compensation Virgo+ upgrade (May+June 2008) New DAQ and control electronics Laser Amplifier (50W) and Injection system optics for the 50W New mode cleaner end mirror and payload Global commissioning (from mid 2008) 2009 Global commissioning Start the second Virgo Science Run (VSR2) around mid-2009 GWDAW 12 - Leone B. Bosi INFN Perugia - On behalf of the Virgo Collaboration

Beyond Virgo+ ADVANCED VIRGO GOALS: Sensitivity: about 10x better than Virgo Timeline: be back online with AdvLIGO Conceptual Design and Preliminary Cost Plan and Project Execution Plan submitted to the STAC and the funding agencies The EGO Council supports the Advanced Virgo project GWDAW 12 - Leone B. Bosi INFN Perugia - On behalf of the Virgo Collaboration

Conclusions VSR1 completed with: duty cycle of 84% ITF locked and 81% in science mode BNS avg horizon about 4Mpc Virgo sensitivity had been improved during the VSR1, thanks to the strategy to keep hours for commissioning activities during the run. In the post-VSR1 commissioning activity we already have important improvements: Reduction of control noise Understanding of the environmental noise sources The Environmental noises are now the main concern E.g. switching off the air conditioning, the horizon increases from 4.4Mpc to 5.1Mpc for BNS and from 8.6Mpc to 13.7Mpc for BBH Commissioning is going toward the Virgo+ upgrades GWDAW 12 - Leone B. Bosi INFN Perugia - On behalf of the Virgo Collaboration