Status of the OPERA DAQ D.Autiero, J.Marteau T.Descombes  informatics

Slides:



Advertisements
Similar presentations
First developments of DAQ\Trigger for RPC 30 October, 2002 General layout of OPERA DAQ\Trigger Naples activity Conclusions Adele Di Cicco Naples RPC Groups:
Advertisements

TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
ESODAC Study for a new ESO Detector Array Controller.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
Detector Array Controller Based on First Light First Light PICNIC Array Mux PICNIC Array Mux Image of ESO Messenger Front Page M.Meyer June 05 NGC High.
Development of novel R/O electronics for LAr detectors Max Hess Controller ADC Data Reduction Ethernet 10/100Mbit Host Detector typical block.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
STATUS OF DAQ PROJECT OPERA collaboration meeting, Hamburg, 3-5 June, ’04 J.Marteau  T.T. LOW VOLTAGE POWER SUPPLIES  NETWORK, RACKS & CABLING  PT DAQ.
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
First ideas for the Argontube electronics Shaper, simulations Block Diagram for analog path Delta Code Data Reduction Bus system, Controller Max.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
OPERA GENERAL MEETING Gran Sasso, May 2003 Status of the OPERA DAQ Status of the OPERA DAQ D.Autiero, J.Marteau T.Descombes  informatics S.Gardien,
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
OPERA TT MEETING BRUSSELS, April 11, 2003 Status of the OPERA DAQ Status of the OPERA DAQ D.Autiero, J.Marteau T.Descombes  informatics S.Gardien, C.Girerd,
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
BPM stripline acquisition in CLEX Sébastien Vilalte.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
/14 Measurements and cross checks on OPERA timing equipments G. Sirri INFN Bologna On behalf of the OPERA Collaboration LNGS, 28 March 2012.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
The LNGS UTC system Some notions concerning GPS The LNGS UTC clock
Results with the RPC system of OPERA and perspectives
DAQ read out system Status Report
The Data Handling Hybrid
Test Boards Design for LTDB
Status of the OPERA DAQ D.Autiero, J.Marteau
LHC1 & COOP September 1995 Report
Calorimeter Mu2e Development electronics Front-end Review
Baby-Mind SiPM Front End Electronics
Production Firmware - status Components TOTFED - status
LAPP BPM Read-out Electronics
Data Aquisition System
Iwaki System Readout Board User’s Guide
ETD meeting Electronic design for the barrel : Front end chip and TDC
T1 Electronic status Conclusions Electronics Cards:
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
Status of the DHCAL DIF Detector InterFace Board
ALICE Trigger Upgrade CTP and LTU PRR
CMS EMU TRIGGER ELECTRONICS
MicroTCA Common Platform For CMS Working Group
Front-end digital Status
Christophe Beigbeder/ PID meeting
Introduction to Microprocessors and Microcontrollers
Front-end electronic system for large area photomultipliers readout
VELO readout On detector electronics Off detector electronics to DAQ
Combiner functionalities
Commodity Flash ADC-FPGA Based Electronics for an
NA61 - Single Computer DAQ !
FEE Electronics progress
Tests Front-end card Status
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
Read Out and Data Transmission Working Group
Front-end Electronics for the LHCb Preshower Rémi CORNAT, Gérard BOHNER, Olivier DESCHAMPS, Jacques LECOQ, Pascal PERRET LPC Clermont-Ferrand.
PID meeting Mechanical implementation Electronics architecture
RPC Electronics Overall system diagram Current status At detector
Pierluigi Paolucci & Giovanni Polese
TELL1 A common data acquisition board for LHCb
LIU BWS Firmware status
TTC setup at MSU 6U VME-64 TTC Crate: TTC clock signal is
Presentation transcript:

Status of the OPERA DAQ D.Autiero, J.Marteau T.Descombes  informatics S.Gardien, C.Girerd, C.Guérin  electronics

Ethernet mezzanine Ethernet mezzanine: Common part to all sub-detectors (TT, RPC, PT) : the mezzanine is simply plugged on the digital boards (regardless of the standard used : VME for RPC & PT, dedicated board for the TT). Implementation: FPGA (readout sequencer), FIFO (temporary storage), m-processor (with Ethernet transceiver): MCM ETRAX from AXIS with imbedded LINUX. Dimensions: 60mm60mm, 120 pins for external connections. 3 boards in Lyon. To be done: Preliminary tests (electrical, communication protocols, I/O) to validate the prototype : a dedicated test card is produced locally in Lyon for that purpose. The up-to-date design has been circulated to the Naples group (RPC). Organization of a dedicated meeting in Lyon with RPC & PT representative for the Ethernet mezzanine implementation.

Ethernet mezzanine 120 pins ( 4 x 30 ) 1.27 pitch 6 cm ……………………. …. …. EPC2 IDT72V39110L10 ……………………. …. …. ……………… MCM FPGA EP20KEFC324 1 2 59 60 61 62 119 120

TT digital board This board is directly plugged at the output of the analog board (2 flat cables) Its main components are: 1 ADC (12 bits), 1 Ethernet mezzanine (FPGA, FIFO, m-processor), 1 clock receiver unit (EPLD), 1 high voltage module (ISEG), 1 LED pulser (from BERN). Dimensions: 290mm  85mm (see next slide). Connectors: 3 Ethernet RJ45 (2 for the clock, 1 for the signal), 1 power supply ( 7V), 1 RS232 (for debug purposes). Dedicated meeting at CERN with the BERN group to review all the components. To be done: Check the mechanics (position of the 2 fixation legs, isolating foam…). Freeze the design a.s.a.p. (tight schedule for the production : deadline January 2004). Produce 1st prototype for the summer (complete R/O chain from PM to DAQ).

TT digital board Analog board Ethernet mezzanine HV module LED pulser Clock EPLD RJ45 conn. We did not implement the Ethernet repeater in this 1st prototype (cost, # I/O) !!!  we have 3 cables / digital board (clk, data, power supply)

TT digital board Meeting @ CERN between Lyon & Bern : Review of all the parts of the digital board : LAL chips signals, ethernet mezzanine, LED pulser, HV module, clk receiver (fine tuning before freezing the board layout) Choice of all the components: ADC’s for charge R/O & for HV R/O, MUX, DAC’s, hold delay components Definition of the register R/O convention Review of all the signals & connectors from analog  digital board Discussion about the power supply : fuses ? monitoring ? cooling of the boards (temperature measurement with the 2nd ADC) ? Milestones: test with analog board  end of june (Bern also developping charge injector)

BFOOT board EXT trigger PPS signal ADC signal TA trigger NIM outputs FPGA ADC Ethernet transceiver (BFOOT) RJ45 Conn. NIM outputs

BFOOT board Backup DAQ system for : TT modules tests at IReS & prototype tests : Upgrade of a DAQ board designed for R&D purposes (tested with HPD’s & MaPMT’s) Uses an Ethernet transceiver from Agilent (BFOOT) Adapted to the VA-TA front-end electronics (no gain correction, possible individual thresholds adjustment, dynamic range ~ 200 p.e.) 5 boards received & tested : 2 given to IReS group for the TT modules tests in Strasbourg 2 will be used for tests (‘background measurements’ in Gran Sasso in june) 1 spare We received a connector that could permit to enclose the full electronics inside the TT end-cap (tests to be done soon).

Clock distribution system General features : A common clock is distributed from the GPS master card in the cavern to each node of OPERA : GPS master card  O/E converter : optical link O/E converter  master cards : M-LVDS bus (electrical link) Master cards  node cards (with ETRAX) : M-LVDS bus (electrical link) The signal distribution is provided through M-LVDS bus The system is bi-directional : the returned commands permit : To acknowledge signals reception To measure the propagation time in order to adjust delays node per node Commands are encoded in the clock. The idea is to have a 2nd secured link from the global DAQ system to each individual node. The commands are : FPGA RESET, ETRAX REBOOT, Time CYCLE INCREMENT (milli-PPS)

Clock distribution system Node card i SM1 SM2 MLVDS MLVDS O/E converter card Master card 0 « Slave » clock in Hall C (receives the GPS signal from the Outside antenna though a 8km optical fiber) 31 Master cards + 1 O/E converter card collected in 1 crate on the top of the detector (+3 additional master cards for the spectrometer) 1 optical fiber from the « slave » card / SM Optical fiber Clock distribution system for TT (62 master cards, 992 nodes) PCI card

Clock distribution system Clock & R/O electronics implementation S.M. top view 11 boards RPC controller crate O/E converter Power supply crates 12 boards Master cards Ethernet switch PT controller crate 11 boards #0 #15 #0 #30 Optical fiber from slave card 16 nodes

Clock distribution system Master & node cards : Prototypes have been developped and successfully tested : Communication protocols (tested with more than 20 meters cables between master & node) Choice of serializer/deserializer components (Hotlink) VHDL code (for the ALTERA EPLD) The architecture of the node part has been frozen & implemented in the 1st version of the TT boards Prototype of master card Prototype of node card

Clock distribution system Master card VME format

Clock distribution system 100m optical fibre O/E converter Master card 10m ethernet cable 8 node cards 2m ethernet cable

Clock distribution system Test of ½ TT plane (8 nodes) : We test an (almost) complete R/O chain : 100m optical fibre  O/E converter  2m ethernet cable  master card  10m ethernet cable  1st node card  2m ethernet cable  2nd node card  … Test measurements : Global propagation time measurement for the physical signal (~5ns / m) Global propagation time including decoding (5 ms for the complete loop) Individual node addressing (test of the M-LVDS bus) Last step : interface this test bench with the PCI GPS card

Clock distribution system The O/E converter prototype

GPS distribution system GPS PCI card architecture (« slave » card in Hall C): Receives the GPS clock (we use a standard DATUM 637PCI antenna for tests). Distributes the clock through optical fibres & receives signals from the different nodes (2 lines / SM, no optical splitter). The idea is to design a new slave card using PCI standard with a “collaboration” from the ESAT company who designs the LNGS GPS system. A visit to the ESAT company took place on March, 27th in Torino. We got many informations on software & hardware aspects: Date pattern decoding Readout ‘triggering’ Oscillator choice Sinus  square signals conversion VHDL code for signal reception The 1st prototype of PCI board + O/E converter board is under completion.

GPS distribution system Inputs from GPS receiver (pps, 10Mhz, analog Irig B, digital Irig B) Optional for Lab tests Optical fiber from the master clock 10Mhz 5.10E-11 OC-050 Vectron Int. O/E Converter Master clock date EPC2 Hot Link 923 Optical fiber to the O/E converter of SM1 & SM2 Data+clock mixed TX1 HFBR1116T PECL Local bus APEX 20KE TX2 HFBR1116T PLX 9080 Hot Link 933 RX1 HFBR2116T Optical fiber From the SM1 RX2 HFBR2116T Optical fiber From the SM2 EEPROM Propagation time measurement (optional) To the station

G.U.I. under JAVA Home page

G.U.I. under JAVA TT event display of a 5 planes event

G.U.I. under JAVA Zoom on the previous event

G.U.I. under JAVA 3D view

ON-LINE software status G.U.I. : Inputs from the various sub-detectors WG (TT, RPC, PT) concerning data taking & acquisition calibration event display CORBA event building : Inputs from RPC & TT WG for the data to be stored (L0 trigger) Inputs from all sub-detectors & from the simulation WG for L1 trigger At present : storage in a relational DB (post-GRES)  adaptation to ORACLE ? Interface with the ROOT developed software ? Network : Simulation of the data rate to measure data transfer time, treatment time on the workstation (sorting & filtering), storage time in the DB Tests are limited to max. 5 ETRAX boards. 10 PC’s (166 MHz PII) have been also used (~3 times more powerful than ETRAX) but the results are difficult to extrapolate.