Snr Power Supply Engineer

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

Diamond Diamond is the new UK Synchrotron Light Source
Oct. 10th 2006NSLS II Accelerator System Advisory Meeting SR-PS 1 NSLS II Accelerator System Advisory Committee Meeting October 10 – NSLS II Storage.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN EPICS collaboration meeting 2004 Dec , 2004 RICOTTI,
1 Slow Global Orbit Feedback at Pohang Light Source (PLS) Heung-Sik Kang Pohang Accelerator Laboratory Pohang, Korea.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Patrick Krejcik LCLS April 7-8, 2005 Breakout Session: Controls Physics Requirements and Technology Choices for LCLS Instrumentation.
Vegard Joa Moseng BI - BL Student meeting Reliability analysis summary for the BLEDP.
Development of new power supplies for J-PARC MR upgrade Yoshi Kurimoto (KEK) for J-PARC accelerator group.
Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
18. June 2003EPICS WS Control of Digital Power Supplies Andreas Lüdeke Swiss Light Source / PSI 20 May 2003 EPICS Collaboration Meeting.
7/11/01Steven Hays E/E Support Page 1 NuMI Beam line Power Supplies  The supplies in the line is detailed  Main Ring Style…………………..…1  PEI/Transrex.
29/06/2007FOFB at Diamond1 Fast Orbit Feedback (FOFB) at Diamond Guenther Rehm, Head of Diagnostics Group.
CHAPTER 18 Power Supplies. Objectives Describe and Analyze: Power Supply Systems Regulation Buck & Boost Regulators Flyback Regulators Off-Line Power.
POWER PLANT USED IN TELECOM
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Beam Instrumentation for Orbit Stability I. Pinayev.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
Performance Improvement of APS Booster Ring Dipole Magnet Power Supplies Ju Wang The 3 rd Workshop on Power Converters for Particle.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
W.S. Graves ASAC Review Sept 18-19, 2003 R&D at Bates William S. Graves MIT-Bates Laboratory Presentation to MIT X-ray laser Accelerator Science Advisory.
Operational experience of high-power RF at Diamond Light Source Chris Christou, Pengda Gu, Alun Watkins Diamond Light Source.
Alexander Aleksandrov Oak Ridge National Laboratory
1 BROOKHAVEN SCIENCE ASSOCIATES ASAC Meeting NSLS-II Project July , 2008 G. Ganetis Power Supplies & Electrical Utilities ASAC Meeting National Synchrotron.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
October, 2009 Magnet Electrical Systems Bob Lambiase October, 2009 Internal Review.
Marjorie Widmeyer LCLS Injector Magnet Power March 30, LCLS Injector, Sector 21 and BC1 DC Magnet Power and Control.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
1 BROOKHAVEN SCIENCE ASSOCIATES Open-Source Distributed Deterministic Device Control Larry Doolittle Alex Ratti Bob Dalesio.
Operational experience of high-power RF at Diamond Light Source
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
ALBA RF Systems Francis Perez.
1 T. Mohite and H. Welker LINAC and Operation/ Electric Power Systems GSI Darmstadt Power Converters for the Magnets of Collector Ring in FAIR
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
Failure analysis experience at TLS Yi Chih Liu 15 April ARW 2013.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Andreas Lüdeke, Trieste, 24. Sep., WAO '07 Operation Information Management at the Swiss Light Source Andreas Lüdeke of the Swiss Light Source at the Paul.
Operation Status of the RF Systems and Taiwan Photon Source
Report Technical Director Storage-Ring-Installation Completed
Operations Machine Simulator.
The Survey of the Power Supply Reliability at SSRF
Status of the ASTRID2 facility
Magnet Power Supply System Overview
SLS Timing Master Timo Korhonen, PSI.
SuperB Injection, RF stations, Vibration and Operations
Coupling Correction at the Australian Synchrotron
MAGNET POWER SUPPLIES RELIABILITY IMPROVEMENTS AT SOLEIL
Commissioning the Fast Orbit Feedback System at SSRF
Fast Orbit Feedback System for HEPS (Cooperation work among all related systems) Dapeng Jin Control System Dec. 12, 2017.
Klystron Power Supplies for ILC
CEPC RF Power Sources System
Operation Progress and Upgrade in SSRF
LCLS RF Stability Requirements
Power Supply Control for BEPCII
Status of the ASTRID2 RF systems
Status of RCS eRHIC Injector Design
Presentation transcript:

Snr Power Supply Engineer Diamond Light Source Power Converters C Abraham Snr Power Supply Engineer 1

Located on the Harwell Science and Innovation Campus ISIS (Spallation Neutron Source) Central Laser Facility Research Complex (for users of Diamond, ISIS and CLF) Diamond Light Source Diamond is located on the Rutherford Appleton Laboratory campus, which also accommodates sever other large research facilities. Located on the Harwell Science and Innovation Campus 2

C Abraham – Snr Power Supply Engineer Injector: 100MeV Linac + 3Gev 5Hz Booster Storage Ring: 24 DBA Cells, 560m, 300mA 30 Beam lines, including 22 I.D. Beam lines 7 Dipole Beam lines Diamond consists of three accelerators, 100Mev Linac identical to SLS? 3Gev 5Hz booster synchrotron, located within the SR 560m circumference SR, with 29 user beam lines C Abraham – Snr Power Supply Engineer 3

C Abraham – Snr Power Supply Engineer Inside the Storage Ring. C Abraham – Snr Power Supply Engineer 4

Storage Ring MTBF 2015 Total Faults = 56, in 4650 User Hours MTBF = 83Hrs (inc RF) MTBF = 4650Hrs (Power Supplies) C Abraham – Snr Power Supply Engineer C Abraham – Snr Power Supply Engineer 5

Power Supply Reliability User beam trips by Year C Abraham – Snr Power Supply Engineer 6

C Abraham – Snr Power Supply Engineer Operational Issues. Booster Dipole regulation. Booster Dipole, boost converter runaway. Trips from load resistance inaccuracies Loss of ADC resolution ADC Enhancements DSP - Flex n_pwr trips C Abraham – Snr Power Supply Engineer 7

Booster Dipole Jitter Mains Frequency Band is due to Dipole clock being asynchronous with timing system clock Operation Tied to Mains Frequency Operation at Fixed 5 Hz Frequency LH plot, dither caused by 5Hz control loop synchronised to mains 50Hz RH Jitter is blue line Steps are measurement quantization not real current C Abraham – Snr Power Supply Engineer 8  

Booster Dipole Power Converter Structure Output- Filter Series Connected Magnets Unit 1 Unit 2 Unit 3 Unit 4 Unit switching frequency 4 kHz giving 16 kHz at output. Input- Filter Output- Filter 9  

C Abraham – Snr Power Supply Engineer Boost Control Failure C Abraham – Snr Power Supply Engineer 10

Load resistance monitoring 11

Faulty Card : Histogram of 30mV sawtooth data ADC Loss of Resolution Faulty Card : Histogram of 30mV sawtooth data 12

Good Card : Histogram of 30mV sawtooth data ADC Loss of Resolution Good Card : Histogram of 30mV sawtooth data 13

ADC Enhancements IC8, TL431 – prone to resonate. Replacement of all Al. Electrolytic caps with ceramic. Which causes 13.5 to rise to circa 15v. Requires trimming. 13.5v rail reduced to minimum required for acceptable output from resonant converters. All of the above actions result in improved performance and reliability of the ADC card. 14

DSP - Flex n_pwr trips Caused 4-5 user beam trips up to 2013 No error messages No hardware faults Affected different power supply types. Discovered by Jackle Hans of PSI. Thank you! 24V supply watchdog spuriously triggering. Stops PWM Added de-bounce. Fixed.  15

Upgrades and Enhancements Fast orbit feedback (FOFB) New 50A power module EPICS PSC support tools. Plug in replacement ADC (in progress) ID10 – Fast Chicane power supplies DDBA Upgrade C Abraham – Snr Power Supply Engineer 16

Corrector Performance for FOFB Standard di/dt rate limiter Amplitude dependant di/dt rate limiter C Abraham – Snr Power Supply Engineer C Abraham – Snr Power Supply Engineer 17

FOFB Installation (one of 24 cells) Corrector power supplies Power supply & FOFB proc VME crate Diagnostics rack C Abraham – Snr Power Supply Engineer 18

C Abraham – Snr Power Supply Engineer Integrated Impact of Orbit Feedback C Abraham – Snr Power Supply Engineer 19

C Abraham – Snr Power Supply Engineer 50A Power Module Smaller form factor Surface mount technology More efficient 100kHz switching Active current share Wider bandwidth Pulse by pulse current limit Hot swappable C Abraham – Snr Power Supply Engineer 20

EPICS PSC Support tools Remote maintenance of power supply controllers: Upload / download and comparison of parameter sets via command line and GUI Upload / download of binaries via command line Waveform upload / download in progress Power Supplies Technical support tools suite.

Replacement ADC Card Existing ADC Card has ‘issues’ Component obsolescence Attrition of faulty cards. Noise floor too high (Unsynchronised flyback) Design deficiencies Poor fault reporting Cause of many power converter faults. New ADC. Form, fit and functionally the same Higher performance ADC devices. Scope to perform oversampling Extra functionality could be used on a future DPSC

ID10 - Fast ID Switching 10Hz Switching between undulators ID Device ID Device 10Hz Switching between undulators Usually RH Circ / LH circ polarization. Careful control needed to change states. 23

C Abraham – Snr Power Supply Engineer DDBA Upgrade 4 off Dipoles – Each has two circuits. 1300A Main circuit 200A Trim circuit. 10 off Quadrupoles – 200A unipolar 10 off Sextupoles – 100A unipolar (maybe) 16 off Correctors – 5A 4Q. 6 off Sq-Quad – 5A 4Q. Only six week shutdown to swap from DBA to DDBA sector! C Abraham – Snr Power Supply Engineer 24

Thank You. Any Questions?