THEMIS Mission Confirmation Readiness

Slides:



Advertisements
Similar presentations
OC ORSTF Position WECC Board Meeting December 8, 2006.
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
Project Management Application in Health IT Farrokh Alemi, Ph.D. Geff Garnhart, PMP.
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
T Project Review Magnificent Seven Project planning iteration
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 IDPU Mechanical / Thermal Preliminary Design Review Heath Bersch University of California - Berkeley.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
THEMIS Pre-Confirm 02/04/040 Final Inputs Pre-Confirmation Review February 4, 2004 Probe & Probe Carrier Program Management Director of Civil and Commercial.
MPEREMC 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Probe 2 EMC Test Results David Curtis University of California - Berkeley.
THEMIS FDMO Review Management Topics − 1 October 5, 2004 Management Topics Manfred Bester.
THEMIS MISSION PDROVERVIEW- 1 UCB, November 12, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness.
THEMIS peer Instrument CDR 1 CETP, Paris, April 8, 2004 THEMIS Mission Status at Peer UCB Instrument Critical Design Review UCB, April 19/20, 2004 Vassilis.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
THEMIS MPDR PM 11/12/20030 Mission PDR Cost & Schedule Review Probe & Probe Carrier Program Management Director of Civil and Commercial Space Michael Cully.
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
THEMIS FDMO CDR Peer Review − FOT Activities 1June 1-2, 2004 FOT Activities Mark Lewis.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
PPPL is Committed to the Success of NCSX Rob Goldston, Director Princeton Plasma Physics Laboratory August 15, 2007.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
MUSE KO: MUSE Support at ESO ‘customer’  MUSE Team Created (ESO-customer), contacts with the Consortium and support activities on-going  Budget and Manpower.
ITAR Restricted Data 1THEMIS Mission CDR 6/18/04 System Safety Overview WBS Element Tim Keepers (301)
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: Time History of Events.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
The Texas Nodal Market Trip Doggett ERCOT Interim President and Chief Executive Officer Mike Cleary ERCOT Chief Technology Officer Executive Briefing 28.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Slide 3.1 © The McGraw-Hill Companies, 2002 SOFTWARE LIFE-CYCLE MODELS.
Program Management Agenda
Camera PDR/CD1 Planning 19 September 2008
FDMO Peer Review RFA Summary
THEMIS THEMIS MCDR June 14-18, 2004 University of California, Berkeley
SPF MAG Quarterly Report – Feb 2015
Keith Goetz University of Minnesota
THEMIS MISSION PRE-SHIP REVIEW
THEMIS Mission Assurance
University of California - Berkeley
0.0 Instrument Suite Name Presenter’s name
Level 1 Level 1 – Initial: The software process is characterized as ad hoc and occasionally even chaotic. Few processes are defined, and success depends.
Enterprise Content Management Owners Representative Contract Approval
Defining the Activities
CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code 450/Code 572 April 2003.
Digital Sub-System Dorothy Gordon.
Systems Engineering Management
IS&T Project Reviews September 9, 2004.
Lockheed Martin Canada’s SMB Mentoring Program
SBS Working Group 14 April 2015
Software Engineering Lecture 16.
XRN4361 – UK Link Release 2 - Delivery
Ctclink executive leadership committee May 31, 2018
LCLS-II Cryoplant Controls Workshop.
DOE Review of the LCLS Project 7-9 February 2006
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

THEMIS Mission Confirmation Readiness Review Peter R. Harvey University of California - Berkeley

GSFC-Required Additional Management Issue#1. Staffing GSFC-Required Additional Management UCB Has Complied with Additional Personnel Swales/Hammers Oversight: Dave King (fmr GSFC/JSC Shuttle) Mission I&T : Rick Sterling (RHESSI) SE Oversight : - Thermal : Paul Cleveland (GSFC, RHESSI) - Software: Dave King / Will Marchant (EUVE, ChipSat) - I&T : Terry Sharton (JPL retired, RHESSI) ISM : Peter Berg (RHESSI) IDPU Dev Lead: Michael Ludlam (Rosetta)

Issue#2. Instrument Schedules Add Detail to Instrument Schedules Continued to Detail Schedules (Definition & Resources) Worst Instrument Schedule (ESA) Added Instrument Manager (C. Scholz) Had n tasks, Now has M tasks At PDR, the instrumentation used 13 schedules, 1417 tasks Currently, we use 20 schedules, 2121 tasks Resource loading being added as time permits. Schedule Maintenance Instrument Developers Report to Their Schedule Weekly 1 Full-Time Scheduler for Instrumentation Provides Status to Project Management & Mission Manager

Impacts of Delayed GSFC-UCB Contract Issue#3. Contracting Impacts of Delayed GSFC-UCB Contract GSFC-UCB Contract Definitized December 2003 UCB-Swales subcontract work agreed by all parties Implement subcontract value per CSR proposal Add Swales-developed CPU card as mod 1 Subcontract Expected in February timeframe Contract Delay has had no known cost or schedule impacts to reserves.

Develop Integrated Risk Management Issue#4. Risk Develop Integrated Risk Management GSFC Provided Risk Management Training to UCB Jan 2004 THEMIS Risk Management Plan Submitted Jan 2004 UCB/Swales Risk Lists Integrated and Provided to Explorers

Issue#5. Separation System Expedite Separation System Development Prioritizing the Separation System tests at Swales Long Lead Item (NSI’s) are currently critical path. Review of Test Plan Considered Essential to the Effort

Expedite ODA Issue Resolution Issue#6. Orbit Debris Expedite ODA Issue Resolution Submitted Orbit Debris Analysis Results Lower Perigee Option Helps but may Impact Science Studies with KSC and Boeing to Provide Possibilities Examining Possible Options to Increase Reliability from 0.83 Reliability of a Single-String Probe will Never be 0.99

Issue#7. Instrument Thermal Instrument Thermal Design Instrument Thermal Design presented only at Peer Reviews    Detailed thermal analyses have been completed for all instruments            Currently on 3rd iteration of integrated instrument/spacecraft model            Hot/Cold cases have been identified and are being used            Board level thermal analyses are in progress    Peer Review of instrument thermal design has been scheduled for last week in February    Paul Cleveland (RHESSI) Providing Oversight of system level thermal design

Issue#8. Monitoring Separation Add Separation Monitoring for Probes 2-5 Top Probe Will Transmit Separation in RealTime All Other Probes Will Be Programmed to Monitor Probe Sep Each Probe will have Gyros On Replay of All Probes after Separation one at a time. Details in MPDR RFA #17