Building Enclosure Airtightness Testing In Washington State

Slides:



Advertisements
Similar presentations
BUILDING ENERGY CODES UNIVERSITYwww.energycodes.gov/BECU 1 BUILDING ENERGY CODES UNIVERSITY ANSI/ASHRAE/IES Standard Scope and Application April.
Advertisements

1 Making buildings better Building Tight Chris Knights.
Southeast Region Chapter 2011 Fall Meeting Birmingham, Alabama Thursday, September 29, 2011 Jim Magee President, Facility Commissioning Group 158 Burt.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Building Science Basics WEATHERIZATION INSTALLER/TECHNICAN FUNDAMENTALS.
Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
ENERGY STAR In the World of Green. ENERGY STAR FOR HOMES GROWTH THE ROAD TO ONE MILLION HOMES Number Labeled Homes Year ,000.
WALTER SCARBOROUGH CSI CCS CCCA SCIP AIA D+D Specifiers Series Sponsored by Air Barriers.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010eere.energy.gov Energy Movement WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM Overview Introduction to the Weatherization Assistance Program Communication Skills House as.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Moisture Barriers WEATHERIZATION INSTALLER/TECHNICIAN FUNDAMENTALS.
West Virginia's residential building code is mandatory statewide; however, adoption by jurisdictions is voluntary. The 2013 West Virginia Legislature.
The House as a System 1. Air Temperature and Water Vapor.
Heat Loss & Gain Calculations 1. How Heat Moves in Homes Conduction is the transfer of heat through solid objects, such as the ceilings, walls, and floors.
Standardized Curriculum WAP Training Plans and Resources.
Standardized Curriculum WAP Training Plans and Resources.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Moisture Assessment WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Blower Door Basics WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
Chapter 4: Air Leakage Control: Materials and Techniques
Building science.
1 ENERGY STAR ® and Air Sealing Products: New Program Requirements Doug Anderson, US EPA 1.
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
Adriana Galue Wolfgang Custom Finishes HOME ENERGY STATS Biggest energy consumers Space heating – 34% Appliances and lighting – 34% Refrigerator.
Overview of ENERGY STAR for Multifamily High Rise Requirements
P1a 1.5 Heat transfer by design. Lesson Objectives To investigate factors that affect the rate of thermal energy transfer. To describe how thermal energy.
Your House as a Healthy System Bruce Stahlberg. Improvements / Remodeling When one has finished building one's house, one suddenly realizes that in the.
SEEM Tool Overview Regional Technical Forum Member Orientation January 22, 2013.
ARCH-432 Vapor Retarders and Air Barriers Attendance In what modern day country was the first cavity wall developed and used? For what purpose? A. Spain.
What You Need to Know About EPA’s ENERGY STAR Certified Homes Program Learn more at energystar.gov 1.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Energy Movement WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
Objectives Compare locations in North America Potential for moisture problems Different driving forces Analyze potential for moisture problems in cooling.
Part 2: Buildings as a System Lee F. Ball Jr., PhD
Southeast Region Chapter 2010 Winter Meeting Decatur, Georgia December 15, 2010 SERBCA WINTER MEETING.
Performance Metrics for Weatherization UGI LIURP Evaluation Yvette Belfort Jackie Berger ACI Home Performance Conference April 30, 2014.
Michael Logsdon, Ben Larson, David Baylon 13 December th Avenue NE, Seattle, WA (206)
CALRES Update Phase 1 Progress Report April 22, 2009 Bruce Wilcox Phil Niles Ken Nittler.
Improving smoke control and protecting lives Air Sealing Industrial, Commercial, Institutional and Multi-Family Buildings to Improve Smoke Control.
Ben Larson 1 November th Avenue NE, Seattle, WA (206)
Heating Systems.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Zone Pressure Diagnostics WEATHERIZATION ENERGY AUDITOR SINGLE.
Objectives Finish air cleaner problem Measure ventilation rates Focus on smaller buildings.
Group 4B: Bergold, Kajander, Leppä, Niemeläinen, Pesonen.
HVACR416 - Design Pressure Measurement Part 1. Why Measure? Need to Make Sure: All combustion appliances vent properly All HVAC systems are installed.
1 Standards: S6E4b. Relate unequal heating of land and water surfaces to form large global wind systems and weather events such as tornados and thunderstorms.
SELECTING INSULATION MATERIALS  Insulation can serve as more than just an energy barrier, providing fire resistance, humidity control, and noise reduction.
1 1 Weatherization & Indoor Air Quality Impacts of Weatherization on Air Quality and Comfort Inside Your Home Prepared with the assistance of Jed Harrison,
Heat loss, U-values and all that stuff. First a bit of Science First Law of Thermodynamics You can’t get more heat out of a closed system than you put.
Stretch Code Informational Session March 16, 2011.
Day 3 Part 3 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010 eere.energy.gov Duct Sealing and Insulation TRAIN THE TRAINER WEATHERIZATION.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010eere.energy.gov Moisture Assessment WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
Warm-up 9/20/16 What is the underlayment called below the shingles?
OBJ: SWBAT create a CAD Rendering of a Utility shed.
Draught Finder Trevor Clark 3. WIND, AIR & VAPOUR BARRIERS Qualified
Truss Heel Heights and Energy Code Requirements
LEVEL 4 Air Pressure Testing
Chapter 6: INFILTRATION
ASHRAE Annual Conference 2014 July 2, 2014
Teaching Point: “To analyze how pulleys change the effort force to do work.” Do now Discussion: Which of the two pulleys here do you think makes work easier?
2015 Energy Code: Major Changes for Residential Buildings
Warm-up 9/19/16 What template are we using?
Prof. Chris Hendrickson
Thermal Conductivity.
CHAPTER 3 VENTILATION.
Things you need to know before you play the game
Chapter 6A: INFILTRATION BACKGROUND
Module 5: Facilitating Compliance with Prefabrication
Common Components of a Traditional Wood Framed Building
Above Grade ICF Walls Interim Summary - Details & Water Management Strategies Building Green With Concrete October 22, 2015 Presented by Brian Hubbs, P.
Chapter 6B: INFILTRATION CALCULATION
Presentation transcript:

Building Enclosure Airtightness Testing In Washington State Lessons learned about air barrier systems and large building testing procedures July 1, 2014 Presented by denali jones, RDH Building Sciences, Seattle Welcome My name is Denali Jones, I’m with RDH Building Sciences here in Seattle I’m going to be talking to you guys about air leakage testing, or airtightness testing (I’m a glass half full guy), on large buildings here in Washington ASHRAE 2014 Annual Conference Seattle WA

Overview Airtightness Testing Testing Procedures What is it? Why test? 2009 vs. 2012 energy codes Testing Procedures ASTM E779 and USACE Single-family vs. large building Challenges with large tests Test Results & Discussion Different air barrier types Common leakage areas Summary & Conclusion So first I’ll go over a bit of background information about what airtightness testing is and why we’re doing it, and talk about the recent code requirements here in Seattle and in WA state I’ll give you guys a brief overview of the test procedures that are used commonly here, and some of the differences between testing single family homes and large buildings, and some of the challenges with that. Next I’ll go over our test results on new construction projects over the last few years, talk about the results of different air barrier types, and some common problem areas. Then I’ll wrap up with a conclusion and take any questions you might have.

What is an Air Barrier? A system of materials and components that resist the flow of air under a given air pressure difference Code requirements: Continuous Components are joined and sealed in a flexible manner, allowing for relative movement Withstands combined forces (negative and positive) without displacing adjacent materials Materials: 0.004 cfm/ft2 @ 75Pa Assemblies: 0.04 cfm/ft2 @ 75Pa Whole building: 0.4 cfm/ft2 @ 75Pa So first of all what is an air barrier? Well the code defines it as a system of materials and components that resist the flow of air under a pressure. There are also weather resistive barriers, thermal barriers, and vapor barriers, and sometimes a material can serve several functions, but I’ll just focus on air barriers today. According to the energy codes here in WA, the air barrier must be continuous, joined and sealed in a flexible manner, withstand the positive and negative forces on it, and it needs to be pretty airtight. The requirement for air barrier materials is 0.004 cfm/ft2, which actually came from the permeability of drywall (1/2” I believe) [ASTM E2178] Assemblies need to be 0.04 cfm/ft2, 10 times leakier than materials, so this would be a wall or roof assembly [ASTM E2357] And the whole building needs to be at 0.4 cfm/ft2, again 10 times leakier [ASTM E779]

Primary Air Barrier Systems Sealed Sheathing Sheet-Applied Liquid-Applied Self-Adhered Curtain Wall/Window Wall/Storefront Some typical air barriers we see around here are sealed sheathing; sheet applied, which is probably the most common in this market; liquid applied in some higher end buildings; there is also self adhered with exterior insulation commonly seen up north in colder climates; and also window wall or curtain wall or storefront systems, where the glazing system also functions as the primary air barrier.

Forces On Air Barriers Stack Effect Wind Mechanical Systems There are really only 3 forces act on air barriers – stack effect, which is just warm air rising up through the building and creating a pressure difference; wind, which is typically stronger further above ground (taller buildings are affected more); and the mechanical system also pushes on the air barrier since most buildings are designed to be under a slight positive pressure. All 3 of these forces are typically within 5-25Pa, and when they add together they can exert some powerful forces on the air barrier.

Whole-Building Airtightness Testing – What is it? Quantitative testing of air barrier system performance Calibrated fans pressurize the building and measure flow Flow in = flow out Results in cfm/ft2 of surface area So what is airtightness testing? Has anybody here ever been involved in a whole building air leakage test before? It is a way to quantitatively assess the performance of the air barrier It involves putting calibrated fans into doors and pressurizing the building. The fans also measure flow, and if we have a constant volume and constant pressure, flow in = flow out. This means that flow in through the fans = flow out through the leaks. We measure this in cfm, then divide by the total surface area of the building envelope to get out results.

Whole-Building Airtightness Testing – Why Test? Simple answer: because the code says you have to. To confirm air barrier performance To identify air leakage pathways To establish a number for future comparison So why are we doing this? Well the simple answer is that the code says you have to; but really what we’re doing is confirming the air barrier performance. I’m a firm believer that you don’t know how well something is performing until you measure it. Another reason is to identify air leakage pathways, which is typically done with infrared thermography. When the building is positively pressurized you can easily see where warm air is escaping. This can help remediate problems and help the design team to figure out common problem areas such as this parapet detail and vented roof assembly. An also we want to establish a number for future comparisons. People have been doing blower door tests on single family houses for the better part of 30 years now, and the results are well documented and understood, but there is very little published data about large buildings, which can in some cases lead to bad assumptions, which I’ll talk about later.

2009 Energy Codes Nonresidential air leakage testing requirements: 2009 Seattle Energy Code (SEC) All nonresidential and multifamily family residential buildings must be tested. Required* to achieve 0.4 cfm/ft2 2009 Washington State Energy Code (WSEC) All nonresidential buildings > 5 stories must be tested. *Requirement waived if air barrier has been inspected by a third party. Main takeaway here – most buildings need to be tested. Also WSEC allows for depressurization only testing, which means possibly less prep work and easier testing.

2012 Energy Codes WSEC and SEC nonresidential air leakage testing requirements: All nonresidential buildings must be tested. All buildings > 3 stories must be tested. Required* to achieve 0.4 cfm/ft2 or better. *If 0.4 is not achieved, then reasonable efforts must be made to seal all leaks and an additional report must be submitted to the code official. Regardless of 3rd party review – 0.4 actually means something

Testing Procedures – ASTM E 779 & USACE Measure flow at multiple pressures (multipoint testing). Highlight 75Pa Add units

Test Procedures – Large Building Challenges The concept is simple… but the execution… Who is going to

Test Results - How airtight are these buildings? Tested 31 buildings All under 2009 code cycle Air barrier type refers to walls Talk about building size – most between 50,000 sq ft and 100,000 sq ft

Test Results – How airtight are these buildings? Don’t talk too much about SF/CW Show # of tests per type Liquid Applied: 6 Curtain wall/Window wall: 3 Sealed Sheathing: 7 Sheet Applied: 12 Storefront: 3

Takeaways - What it takes to get an airtight building The Good Repetitive, simple details Few trade interfaces Experienced design team, general contractor, and trades Coordination of design team, contractor, and trades

Takeaways – What it takes to get an airtight building The Bad Owner/Contractor doesn’t perceive value in airtightness Poor/incomplete detailing Inexperienced trades Difficult review conditions Sometimes field review can be difficult – 6 floor pump jacks Add IR image of parapet – time animation with bullet point

What’s Next? Code target of 0.4 cfm/ft2 is attainable. Better coordination between HVAC and envelope designers = better performance. We know how airtight buildings are; size mechanical ventilation accordingly. Add IR image of HVAC leakage Careful about negative language – “narrow in on tighter design” “lower safety factors” Look at code requirements for damper leakage

Discussion + Questions For Further Information Please Visit rdh.com