RACH configuration ZTE, Sanechips R1-171xxxx

Slides:



Advertisements
Similar presentations
Way forward for LTE DL 4Rx AP SI on RF
Advertisements

WF on PBCH Coverage Enhancement
Way forward on eIMTA signaling to support up to 32 component carriers
WF on DL LBT Scheme for DRS
Summarizing baseline results Nokia Networks 3GPP TSG RAN WG1 Meeting #81R Fukuoka, Japan, 25 th – 29 th May 2015 Agenda Item:
WF on MCOT and CWS for LBT priority classes
Way forward to NB-IoT 3GPP TSG RAN WG1 #83 R1-157xxx
WF on LAA DL Multi-Channel LBT
Proposal for NB-IoT single-tone only UE
WF on UE capability signaling for FD-MIMO Class B LG Electronics, Intel Coorporation, NTT DOCOMO, Qualcomm 3GPP TSG RAN WG1 Meeting #84 R St Julian’s,
Clarification of the scope of the study on latency reduction techniques for LTE 3GPP TSG RAN Meeting #71RP-16xxxx Göteborg, Sweden, March , 2016.
WF on MCOT limit Signaling and Modifying LBT type Ericsson, … 3GPP TSG RAN WG1 #85 R1-16xxxx Nanjing, China 23 rd – 27 th May 2016 Agenda item:
WF on Supporting different Numerologies in a NR carrier LG Electronics, [Huawei, HiSilicon, Panasonic], 3GPP TSG RAN WG1 Meeting #85R Nanjing,
Overview of open issues in
Offline discussion on remaining details on RRM measurements
WF on Bandwidth Part for DL common channel
WF on RA-RNTI design 3GPP TSG RAN WG1 Meeting NR#3 R1-171xxxx
3GPP TSG-RAN WG4 Meeting NR#3 Nagoya, Japan, 18 – 21 Sep, 2017
Summary on Beam Recovery Mechanism
Summary of SLS for RRM NTT DOCOMO
Offline Discussion on remaining details about RACH Procedure
Single Tx switched UL DRAFT 3GPP RAN #77 September , 2017
R GPP TSG RAN WG1 Meeting #90 Prague, P.R. Czechia, 21st – 25th August 2017 Agenda: WF.
WF on new NR CG sequences for PUCCH
Initial workplan on NR spectrum
WF on NPUSCH scrambling for Rel-14 NB-IoT
WF on pre-DFT PT-RS pattern for DFTsOFDM
Summary of proposals on CBG-based retransmission
WF on single Tx switched UL
Proposals on remaining issues on PDCCH structure
Summary of offline discussion for PDCCH structure
Proposals on remaining issues on search space
WF on Beam Indication for Beam Management
WF on NB-IoT Radio Link Monitoring Performance Test Procedure
WF on measurement capability and measurement gap for NR
3GPP TSG RAN WG1 Meeting #90bis
Summary on Beam Recovery Mechanism
R : SRS Enhancements for LTE-A
WF on remaining open items for allowing 1Tx transmission in LTE-NR DC
WF on Beam failure recovery
Qualcomm Incorporated
Illustration of RMSI monitoring windows (TDM)
WF on SS Block Index Reporting through RACH Procedure
Way forward on cell identification in NR
Proposal for defining requirement of LTE BHH TRP/TRS
WF on transmit diversity for DFTsOFDM
Samsung, KT Corp., NTT DOCOMO, Verizon, [ZTE], [CATT], [Intel]
WF on beam reporting CATT, Intel R1-17xxxxx
WF on Beam-Related Indication
WF on CSI timing offset for PUSCH
Motorola Mobility, Lenovo, …
WF on UE mandatory channel bandwidth for NR bands
WF on scenarios and evaluation assumptions for flexible duplex
Evaluation Model for LTE-Advanced
WF for 4Rx CA 256QAM(1/2 layer) and 3/4 layers tests in Rel-14
Motivation for WI on "LTE-based V2X Services"
Way Forward on Coexistence Evaluation Methodologies for LAA
WF on LTE-NR DC with UL coexistence
Summary of Offline Discussion on RMSI CORESET Configuration (Part 2)
WF on UL Beam Management
WF on UL Beam Management
WF on CB-group based retransmission
WF on Phase discontinuity issue in intra-band EN-DC with 1-PA
WF on LTE-NR Coexistence
Network Slicing (and related) Features in 3GPP
AANI SC Closing Report March 2017
3GPP RAN1 status on NR-Unlicensed
Status of NR-U - Wi-Fi coexistence
Jing Sun, Qualcomm Incorporated Rapporteur of Rel.16 NR-U Work Item
Presentation transcript:

RACH configuration ZTE, Sanechips R1-171xxxx 3GPP TSG RAN WG1 Meeting RAN1 #90bis Prague, CZ, 9th – 13th, October 2017 Agenda item: 7.1.2.1 R1-171xxxx RACH configuration ZTE, Sanechips

AGENDA for RACH configuration during this week Numerology that the RACH resource configuration is based on. Then we can discuss the RACH resource configuration period and resource density within one RACH resource configuration period Then focus on the mapping within a RACH block (RACH block will be discussed in combination with the numerology for the RACH resouces configuration) Other key issues (depending on progress of above)

RACH resource configuration period RACH resource configuration period, P (ms) RACH slot A RACH slot is based on Msg1 numerology N RACH slots within one RACH configuration period. N equals P/R, R = Msg1 num / 15kHz N = P for Msg1 num = 15kHz, N = 8P for Msg1 num = 120kHz Define D as the density of the RACH slots within a RACH configuration period. D = 1 -> One RACH slot is configured within one RACH configuration period D = n -> n RACH slots are configured within one RACH configuration period P can be: fixed, e.g 5ms Follow the SS burst set periodicity other?

Discussion on RACH configuration Question rasied during online session: What numerology to base the RACH configuration on Alt1: Signaled, Working assumption Alt2: Based on Msg1: 14 symbol RACH blocks Alt3: Based on SS block, (SS block numerology >= Msg1 num). 14 symbol RACH blocks Alt4: For short sequences, below 6GHz. Use SCS [15 30] kHz For short sequences, above 6GHz. Use SCS [60 120] kHz

RACH blocks based on signaled RACH block 2 DL 12 UL UL/DL data based on 30kHz RACH blocks configuration based on MSG1 SCS = 15kHz Configured with 30kHz Will be a 14 symbol RACH block 1 DL 6 UL 1 DL 6 UL 14 symbols RACH block

RACH blocks based on signaled RACH block 2 DL 12 UL UL/DL data based on 15kHz RACH blocks configuration based on MSG1 SCS = 30kHz Configured with 15kHz Will be a 28 symbol RACH block 4 DL 24 UL 28 symbols