Luanda Electricity a key strategic factor for growth and development

Slides:



Advertisements
Similar presentations
UK-Malawi Trade & Investment Forum March 20, 2013 Energy Sector Perspectives Rob Mills World Bank.
Advertisements

REGULATORY AND INVESTMENT CHALLENGES IN HYBRID POWER MARKETS IN DEVELOPING COUNTRIES REGULATORY AND INVESTMENT CHALLENGES IN HYBRID POWER MARKETS IN DEVELOPING.
Dr. Bader Eddin Al-Majali
Implementation of Prepayment System in Mozambique E D M PREPAYMENT SYSTEM.
1 Power Sector in Tanzania Recent Developments, Current Crisis, Issues, Challenges and Solutions.
Donors’ Conference on Sustainable Energy for Kosovo
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Renewable Energy Program Arab Union for Electricity
Hydropower Development: Experience of Nepal
The Need for an Energy Grid in the Maldives
Powering Africa – SAPP Strategies
THE CURRENT STATE OF ENERGY SECTOR IN MONGOLIA, DEVELOPMENT TRENDS
Draft Energy Policy for Nairobi City County An Initiative of UN-Habitat in Collaboration with Nairobi City County Rose Muema Chief Officer, Urban Planning.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Electricity Reforms in Bangladesh
Designing effective national incentive and subsidy schemes in industrial policy (energy and water) Jerson Kelman Brazil Round Table Comparative Analysis.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Russian power sector reform Presentation to AmCham Russia members by CEO of Unified Energy Systems of Russia, Anatoly B. Chubais March 20, 2001Moscow.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
THE 2005 CERT ENERGY ROUNDTABLE Ontario’s Electricity Sector: The Hybrid Model Takes Shape By: Ron Clark May 31, 2005.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
Electricity Power Market: Competitive and Non-competitive Markets Ito Diejomaoh.
Energy Regulatory Authority (ERA) of Mongolia Mr.Tumentsogt Tsevegmid, MSc, MPA Regulator, Energy Regulatory Authority University Street 2A, Ulaanbaatar.
Renewables Readiness Assessment -Background Jensen Shuma IRENA - local consultant Dar es Salaam, 9 March 2016.
Support for the SDDX Program: Training for Renewable Energy Service Companies Beijing JKD Renewable Energy Development Center 8 th June, 2005.
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
Comparison between Wind Energy Public Policies in Brazil and Colombia
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Presentation to the Portfolio Committee on Energy
Irvine Ranch Water District Distributed Energy Storage Case Study
Chairman of the Board and CEO,
RESTRUCTURING OF THE ELECTRICITY DISTRIBUTION INDUSTRY
Damitha Kumarasinghe Director General
REFLECTED IN JAMAICA’S ENERGY POLICY
CURRENT STATUS - ENERGY TRANSITION
NS4960 Spring Term 2017 Mexico: Electricity Prices
DCC Cluster/Working Group Energy MTDS (GoT) priorities for the sector
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
Overview on Renewable energy in Bulgaria
The Transition to a High DER Future
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024 North America Microgrid Market.
Sahar Rahim MS-Electrical Engineering Supervisor: Dr. Nadeem Javaid
COUNTRY PRESENTATION OUTLINE: BURUNDI
GREEN MINIGRID REGULATORY REFORM: TRENDS AND APPROACHES *
THE REPUBLIC OF MALAWI MALAWI PRESENTATION AT
Opportunities in the Changing Energy System
Zahrani & Selaata IPP Projects
Yangon Region Rural electrification plan
NS4960 Spring Term, 2018 China: Expanded Renewables
DEMOCRATIC REPUBLIQUE OF CONGO
March, 30 – April 3, 2009, Honolulu, Hawaii
Vietnam Power Sector Reform And Market Devvelopmentvvvv
The Electricity Sector in Mozambique
Developing Reliable and Cost-Effective Grids
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
The Electricity Sector in Mozambique
FUTURE OF POWER GENERATION IN GHANA At the 2019 GhIE Annual Conference
Scaling up of Renewable Energy for Power Generation in the Western Balkan countries
The Potential of Renewable Energy in Libya
Presentation transcript:

Luanda Electricity a key strategic factor for growth and development Angolan Power Sector and its challenges

Current State of Affairs Estimated total population:24 millions Total installed generation capacity 5 000 MW, Less than 35% of the population has access to “formal” electricity supply (many more have access through illegal connections). Approximately 70% of the total supply is consumed in Luanda, where almost 30% of population live; Generation deficit and transmission constraints need to be reduced ; Major investments are required to expand access of electricity to a larger proportion of the population as well as to provide for the growing industrial needs; Reliability and quality of power supply Grid not interconnected Three main systems and isolated power networks The supply does not cover the demand (Deficit). High levels of suppressed demand Losses Technical and non technical losses are high due to the poor condition of infrastructure, inefficient billing, metering and settlement systems, illegal connections Revenue Collection Collection has improved substantial over the last three years. The Collection rate which was of 36,3% in 2003, went up to 41,1% in 2004, 63% in 2005, 77,6% in 2006; Utility financial situation Despite the direct subsidy that the utility gets from the Government, it still have significant losses. The subsidies are not enough to cover operating costs, the utility is over staffed, its commercial services are not reliable, scarcity of qualified human resources and financial resources; Investments depends on Public Service Investment Program; Financial problems have limited the ability to rehabilitate and expand infrastructure. Non cost reflective tariffs Tariffs not cost reflective; The Shortfall is met through Government subsidies, but not sufficient to cover all cost involved Last tariff increase occurred in August 2006 through an executive decree 118/06 MINFIN, which raised tariffs at Residential customers at US$ 0.042/KWh Low voltage industrial and commercial customers at US$ 0.055/KWh Social tariffs at US$0.015/WKh for 50 KWh and is applicable for those customers not exciding 200 KW per month MV and HV tariffs were not increased Average tariffs for distributors At 60 KV, US$ 0,032/KWh At 15 KV, US$ 0,025/KWh

Electricity Industry Dynamics and Investment Opportunities 2025 Goals The government established the guidelines reinforcing the importance of the electricity and allowing for external investments to achieve major development goals in the sector. 2025 Goals Ensure and Increase Electricity Supply Increase the electricity rate from 35% to 60% Quadruplicate the generation capacity from current ~2.000 MW to ~9.500 MW in 2025 Extend more than 2.500 km of lines and substations in the transmission grid, and establish international interconnections Rehabilitate distribution networks, adding more than 1,5 million consumers Industry Competitivenes s Improve the efficiency of public companies Implement a new market model that allows for cost reductions Develop a new regulatory model encouraging efficiency System Sustainability Reduce tariff subsidization Develop an optimal generation mix, making better use of Angola’s natural resources Develop the capabilities of the local workforce

Projects in the field of Generation: Cambambe Hydropower station total output of 960 MW (project concluded in 2017) Lauca Hydropower– 2067 MW, (commissioned in 2017) Caculo Cabaça Hydropower- 2100 MW construction starting in 2017 Construction of a new Thermal 20 MW power station in Namibe Construction of the Jamba Ya Oma and Jamba Ya Mina Hydro power stations; Rehabilitation and Enlargement of Luachimo Hydro power station; Construction of new the Hydro power stations of Luapasso, Chiumbe-Dala (commissioned in 2017) and Chicapa II

Projects in the field of Transmission: Construction of the transmission lines associated to the new power plants, Projects in the field of Distribution: Expansion of Luanda distribution network ; Expansion of distribution networks of the capital cities and towns of the eastern provinces which are not connected to the main power grid ; Expansion of Cabinda distribution network Implemention of a new tariff model in order to ensure the self-financing of the power sector expansion

Projects in the area of Renewable Energy Development of Small hydropower program, including the realization of feasibility studies and project executives studies of 50 hydroelectric power stations; Development of solar photovoltaic systems programme which include the installation of 63 PV systems in 52 localities; Development of mini-hydropower stations program, seeking private sector participation. Implementation of wind parks, with the participation of the private sector Development of wind and solar mapping for power generation In isolated networks where hydropower, solar and wind, are adopted, it is expected to maintain the use of thermal generation source and / or energy storage systems (reservoirs and water pumping systems, battery for solar / wind systems) to guaranty the continuity of supply. In rural areas , renewable energy (especially the mini-hydro, wind and solar) may be the most interesting alternative not only from the perspective of sustainability, but also from an economic perspective and also the short time needed to ensure the supply to the population.

Major Challenges – partial liberalisation phase Electricity Sector Reform Master Plan ENE.EP. has started its internal reorganization and restructuring process in February 2007; Restructuring will focus on: Ring fencing, Human resources development, Reorganization of commercial and marketing function, Adoption of a new corporate structure in line with new strategic vision; The separation of accounts will allow the effective identification of the cost drivers and facilitate the possible move to unbundling if viable and feasible; A Business Unit on Internal restructuring has been recently established in February 2007; The utility is seeking funds to implement its restructuring programme (financial and technical support); A strategic and business plan were developed; A Contract Performance was developed and is under negotiation with the Government; The Rehabilitation and Expansion Master Plan were revisited; The Load Forecast Study was also revisited; Develop an Information Technology Master Plan; Develop a new remuneration package based on key performance indicators; Develop a specific power training needs programme to meet the new challenges

Aproveitamentos no Médio Kwanza Kwanza River Hydroelectric capacity 1.000 m CAPANDA (520 MW) LAÚCA (2.067 MW) 800 m CACULO-CABAÇA (2.100 MW) 600 m ZENZO 1 (450 MW) 400 m TÚMULO DO CAÇADOR (450 MW) ZENZO 2 (120 MW) 200 m LUÍME (330 MW) Potência Total estimada 6.700 MW 0 m CAMBAMBE 1 e 2 (960 MW)

Major Challenges Expand the electrical power infrastructure; Improve the quality and reliability of power supply; Increase the access to electricity supply in the country; Increase the supply side to meet the demand; and better efficiency. Interconnect the three main power systems in the country (Northern, Central and Southern); Interconnect the country to its neighbours (RDC , Namibia and Zambia) ; Improve the performance indicators within the utilities operations; Expand installation of Pre-paid meters in order to increase utilities cash flow and gradually eliminate state subsidies. Capacity building and training of local staff in the field of engineering and management. Electricity Sector Reform Master Plan ENE.EP. has started its internal reorganization and restructuring process in February 2007; Restructuring will focus on: Ring fencing, Human resources development, Reorganization of commercial and marketing function, Adoption of a new corporate structure in line with new strategic vision; The separation of accounts will allow the effective identification of the cost drivers and facilitate the possible move to unbundling if viable and feasible; A Business Unit on Internal restructuring has been recently established in February 2007; The utility is seeking funds to implement its restructuring programme (financial and technical support); A strategic and business plan were developed; A Contract Performance was developed and is under negotiation with the Government; The Rehabilitation and Expansion Master Plan were revisited; The Load Forecast Study was also revisited; Develop an Information Technology Master Plan; Develop a new remuneration package based on key performance indicators; Develop a specific power training needs programme to meet the new challenges

Steps forward Bearing in mind: the existing natural resources the potential for the growth and development of the Angolan market the existing energy resources the rapid growth in electricity demand The application of the revised legal framework of the power sector, namely the General electricity Law , Conditions are hence created for private sector participation in power infrastructure through public private partnerships. Angola has created an enabling environment to attract private sector investment for co-financing the rehabilitation and expansion of the infrastructure by establishing transparent legal, institutional and regulatory frameworks: The Private Investment Law 11/03, May 13, allows for private sector involvement in the power sector; (http:/www.investinangola.com; info@investingangola - ANIP) The Electricity Act 14/A 96, May 13, promotes competition in generation and allows for participation of private sector in generation and distribution; The Economic Sectors Under the State Control Act 4/02, April 16, allows the participation of private sector in the electricity generation and distribution industry through various forms of concessions (BOO, BOOT, ROT, Service and Management Contracts). BOO, BOOT – build (own) operate transfer, ROT – rehabilitate operate transfer, Service and Management Contracts Huge investments are required for rehabilitation and expansion of generation, transmission and distribution infrastructure - Almost $US2.5 billion needed up to 2016 (for the next three years $US559million) Main constraints Scarcity of public funds to rehabilitate and expand infrastructure due to other priorities (social and post war recovering programmes); Hydropower facilities that need rehabilitation – Mabubas (17 MW), Lomaum (35 MW); Use of non cost reflective tariffs.

Steps forward Taking into account the above mentioned measures, Actions are being undertaken with regard to the electricity pricing reforms including introduction of cost reflective tariffs; Consolidation of the role of the Regulator (IRSEA) with the adoption of new regulations as well as the capacity building of its staff. Identification of business opportunities for IPPs, BOO, BOOT, ROT concession and management contract schemes, ; Creation of conditions to promote PPAs (private investment participation) in the sector. Private operators are expected to play an important role in helping restore the power system during the rehabilitation phase, as well as during the phase of its expansion. Angola has created an enabling environment to attract private sector investment for co-financing the rehabilitation and expansion of the infrastructure by establishing transparent legal, institutional and regulatory frameworks: The Private Investment Law 11/03, May 13, allows for private sector involvement in the power sector; (http:/www.investinangola.com; info@investingangola - ANIP) The Electricity Act 14/A 96, May 13, promotes competition in generation and allows for participation of private sector in generation and distribution; The Economic Sectors Under the State Control Act 4/02, April 16, allows the participation of private sector in the electricity generation and distribution industry through various forms of concessions (BOO, BOOT, ROT, Service and Management Contracts). BOO, BOOT – build (own) operate transfer, ROT – rehabilitate operate transfer, Service and Management Contracts Huge investments are required for rehabilitation and expansion of generation, transmission and distribution infrastructure - Almost $US2.5 billion needed up to 2016 (for the next three years $US559million) Main constraints Scarcity of public funds to rehabilitate and expand infrastructure due to other priorities (social and post war recovering programmes); Hydropower facilities that need rehabilitation – Mabubas (17 MW), Lomaum (35 MW); Use of non cost reflective tariffs.

Actions in course Stabilization and adjustment of the market relationship between the public utilities according to “Single Buyer” model; Adjustment of electricity tariffs to be more cost-reflective ;application of the true-cost of all generation and supply activities and simultaneously reduce the subsidization to electricity retail tariffs; Application of “merit order” to generation plants, ranking them with respect to marginal cost (from cheapest to most expensive) when considering dispatch instructions; Install electricity meters in all consumption points, preferably pre-paid meters, reducing consumers without a meter; Electricity Sector Reform Master Plan ENE.EP. has started its internal reorganization and restructuring process in February 2007; Restructuring will focus on: Ring fencing, Human resources development, Reorganization of commercial and marketing function, Adoption of a new corporate structure in line with new strategic vision; The separation of accounts will allow the effective identification of the cost drivers and facilitate the possible move to unbundling if viable and feasible; A Business Unit on Internal restructuring has been recently established in February 2007; The utility is seeking funds to implement its restructuring programme (financial and technical support); A strategic and business plan were developed; A Contract Performance was developed and is under negotiation with the Government; The Rehabilitation and Expansion Master Plan were revisited; The Load Forecast Study was also revisited; Develop an Information Technology Master Plan; Develop a new remuneration package based on key performance indicators; Develop a specific power training needs programme to meet the new challenges

Main Requirements for the Power Sector Development Infrastrutures Political Stability Investments Energy Market