REPORTS BY NEW PROJECT DIVISION HEADS: “Rare Isotope Beams”

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Advertisements

COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Large-acceptance superconducting dipole magnet GLAD Magnet parameters: Large vertical gap ± 80 mrad High integrated field of 4.5 Tm Fringe field at the.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
EDM Fast Start Presentation WBS 11 – Assembly and Commissioning Vince Cianciolo, Paul Huffman May 23, 2006.
Technical Readiness Review of the n-3He Experiment Seppo Penttila ORNL P-div At SNS Jan
WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Xenon Delivery Japan 1 MCHF 575 kCHF granted Additional grant 656 kCHF Last 50l subject to negotiation.
Facilities Working Group Jiansong Wang, Yan Zhang, Xiaodong Tang, Xiaohong Zhou, Wanpeng Tan, Jianjun He, Georg Bollen.
TE-CRG Activities D. Delikaris, TE-CRG.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
O. Kester, 8 th MAC meeting, Darmstadt, Towards a resource loaded schedule Status of project planning and procurement O. Kester 8.
O. Kester, NuSTAR annual meeting, 27/02/2013
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
Rob Connatser NSS Instrument Work Packages and XLPM.
Peter Spiller MAC meeting Time Schedule SIS100 1.
W. Barth, 8th FAIR Machine Advisory Committee, REPORTS BY NEW PROJECT DIVISION HEADS: “LINAC& Operations” organisation issues tasks and.
Proposal for Microstation Prototype Jaak Lippmaa CERN 2005.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Unraveling stellar alchemy with NUSTAR From ideas to in-kind Alexander Herlert FAIR 2 nd In-kind Contributions Workshop (IKCW 2015) GSI/FAIR Darmstadt,
GSI Helmholtzzentrum für Schwerionenforschung GmbH MAC12 – O. Kester November 2014 GSI Helmholtzzentrum für Schwerionenforschung GmbH.
Peter Spiller, November 2012, Structure and Tasks of the Project Division Primary Beams Peter Spiller Machine Advisory Committee Meeting.
Operation SE view point Romuald Duperrier ESS SE manager.
Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR.
O. Kester, 6 th MAC meeting, Darmstadt, 10/10/2011 FAIR ACC planning and schedule O. Kester 6th FAIR - Machine Advisory Committee Meeting
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
Oleksiy Dolinskyy December 1st, 2014
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Schedule for the FAIR Antiproton Target
Status of LEB J. Gerl GSI – Darmstadt, Germany NUSTAR Week 2011
Testing of SC Magnets Status - November 2010
(Selected) Project Management Processes at the XFEL
Draft SuperB Organization Chart for TDR Phase
(Procurement, testing of magnets)
EFREMOV INSTITUTE SAINT PETERSBURG RUSSIA
10/month is the present production rate 2 FTE + sporadic contributions
MicroMegas Mechanical Meeting --- Cern April 2014
ESS RF Development at Uppsala University
DTS Fields of Interest POF IV
Super-FRS plans for commissioning and day-1 beams
TEST PLANS for HL LHC IT STRING
Advanced Research Electron Accelerator Laboratory
FAIR – the Universe in the labororatory
NEH - Status Stefan Moeller.
NSS integrated installation plan workshop Introduction
CBM Project Walter F.J. Müller, FAIR, Darmstadt
and collaboration with France
Presentation transcript:

REPORTS BY NEW PROJECT DIVISION HEADS: “Rare Isotope Beams” structure tasks and aims personnel milestones interfaces to other project divisions interfaces to experiment

FAIR@GSI

Rare Isotope Beams (RB) Organigramm /RB Rare Isotope Beams (RB) H. Simon Super-FRS M. Winkler (H. Weick) Detector Laboratory Ch. Schmidt (B. Voss) Secretariat N.N. R3B exp. project group Interim Structure: Additional NUSTAR detector divison expected in 2013 (Hi/DESPEC, ILIMA) 40 (45) FTE 10/2012

Personnel/RB Moderate increase, mainly at Super-FRS and Detlab To be covered by selective recruitment and redirection

Tasks and aims Project Group R³B (5 FTE) Established: 10/2012 handles GLAD magnet power supply, cryostat, cyrogenics and vacuum chamber for SAT in Cave-C (2013/14) and later use in the FAIR cave (PSP 1.2.5.1.1.2). system responsible for building the NEULAND neutron ToF detector (PSP 1.2.5.1.2.5) procurement of detector material, mechanical integration, NUSTAR detector department (5 FTE) 2013 Concept, design & construction of the core NUSTAR DAQ system for Super-FRS, R³B, HI/DESPEC within project scope (PSPs 2.4.6.3, 1.2.5.1.4, 1.2.2.4) with CSEL. Mechanical integration of the HI/DESPEC experiments (PSP 1.2.2.3). Procurement and SAT for 10% of the DESPEC high resolution gamma detector (PSP 1.2.2.14). System responsible for ILIMA ToF and decay detectors (PSPs 1.2.6.4&5) no increase in FTEs needed!

Interface experimental and accelerator development activities GLAD Cryo system as test bench for UNICOS controls  CSCO Core DAQ BuTiS/White Rabbit time distribution system for campus wide experiment synchronisation (e.g. with the PID from Super-FRS).  CSCO

The Super-FRS department (currently 17FTE) Established: 10/2012, evolves from FRS department Head: M. Winkler Technical realization of the Super-FRS: demanding „customer“ to other divisions 7 FTEs missing for the design & specification phase (2013/14).  Priority to magnets as they determine the timeline  Packages (e.g. Stopping cell) moved to external partners

List of major project Milestones All contracts closed for major component All major component series production started Building and infrastructure ready for assembly All components installation (incl. testing) Assembly and alignment finished Commissioning without beam Super-FRS - Q4/2016 Q2/2019 Multipletts Q2/2013 Q4/2015 Q4/2018 Q1/2019 Dipoles Q3/2013 Q2/2015 Q2/2017 Magnet Testing Q1/2012 Q4/2013 Target Q4/2014 Q1/2017  Dedicated talk tomorrow by M. Winkler/H. Weick

Detector Laboratory (currently 17 FTE) Tasks and aims Detector Laboratory (currently 17 FTE) Head: C.J. Schmidt Provides most of the necessary technologies to build the required instrumentation for packages to be handled in the different project departments. Strong focus on in-kind packages and priority to beam diagnostics. Hostlab support (limited) for „external“ packages. max. 4 FTEs missing in 2014-16.

Portfolio & link to other departments System design ASIC integration bonding, ... Mechanical design Gas detector techniques Vapor deposition includes also: Silicon detectors Diamond detectors ...