EN 4946 – Refurbishment of Electrical Substations

Slides:



Advertisements
Similar presentations
Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
Advertisements

Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
Outline of JICA’s Assistance prepared for
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Preliminary Studies of the Electric Power Distribution for CLIC
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Sepam case studie EN 2007_01.ppt1 Installation single-line diagram G M Transformer 63KV / 6.3KV 10MVA Generator 2MVA 30A / 5s 6A continuous 1 CSH 30A /
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Electrical Engineering
SPS point 3 New RF building LIU-SPS-200 MHz Power Upgrade April 19, 2011Eric Montesinos / CERN-BE-RF-SR.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
Proposal for rerouting of buried electrical networks and optical fibres at Point 1 LS2 Committee meeting S. Bertolasi on behalf on EN/EL WP17.2 HL-LHC.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Electrial Safety LS2 days November 2016 AP
Update on the PSB Cooling and Ventilation Systems
Survey on “Chargés de Consignation” Status Update
YETS & LS2 Works EN-EL / Power distribution
CC LLRF SM18 test plan and BA6 infrastructure
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Status, Schedule and EVM for the test facility project
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
Controls & software Andy Butterworth.
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
CLIC Civil Engineering & Infrastructure Working Group Meeting
TE-MSC activities in SPS during LS2
LIU Consolidation project (INDICO ) E. Blanco BE/ICS
EN-EL-FC Activity Jeremy Blanc, EN-EL-FC.
on behalf of the RF group
SPS cryogenic proximity equipment and SM18 validation
EC Activities Status for the LIU
the high-voltage network of CERN ToMORROW
Preparation of the activities for the LHC Long Shutdown 2
As energy coordinator for CERN Accelerators & Technology
Hollow e- lens, Cryogenic aspects
EN-HE SPS works during EYETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS activities during LS2 TE-EPC (Power Converter Group)
YETS & LS2 Works EN-EL / Power distribution
East Hall under construction
GIS Portal Racks Project
F Duval, on behalf of EN/EL
Business opportunities related to CERN electrical network
Experimental Areas – LS2 planning
LIU-SPS review for BI (no BWS)
Aziz AMAMOU EACM – 21th May 2019
ILO Industrial Opportunities Days, 6-7 June 2019
SPS Planning meeting for LS2 #25 Vacuum sectors status
Presentation transcript:

EN 4946 – Refurbishment of Electrical Substations Gerardo Velázquez Gutiérrez - EN-EL-ENP

Projects Summary Projects completed. New 400/66 kV Substation BE2. Renovation 400 kV Protection & Control System. The SPS test stand for HiLumi Crab Cavities East Area Consolidation. Building 272 – Workshop TE-MPE.

Projects completed. 66/18 kV Protection System Upgrade Building 272 – Test Lab for TE-MPE. RPADO Converters for TE-EPC Test Lab building 272 Commissioning Works in LHC4

New 400/66 kV Substation BE2 & 400 kV Protection & Control System: Design and Execution Phase Role: Project Engineer Status: Design Phase taking in account possible 400 kV extension, Users, RTE and French Authorities. Transformer Design – On going. 400 kV Protection – Design Phase. Preliminary civil works done. Next steps: Civil Engineering – Execution phase. Validation of the mechanical design of the transformer

The SPS test stand for Crab Cavity projects. Role: Project Manager Main client: BE-RF Location: BA6 and LSS6 1200 kVA requested by the users. Scope: Installation of a new 2 MVA 18/0.4 kV transformer in building BA6. 400V Electrical distribution 21 kW UPS power 1kW Secured network Energization foreseen January 2018

The East Area & 272 – Workshop TE-MPE East Area Consolidation Role: Project Manager Client: EN-EA Electrical Consolidation in East Area to be done during LS2. Conceptual Design Report finished by June 2017. Building 272 – Workshop Role: Project Manager Client: TE-MPE New Electrical Installation for the new workshop. Status of the works: Energization beginning July 2017.

Questions & Answers