ALICE – Evolving towards the use of EDG/LCG - the Data Challenge 2004

Slides:



Advertisements
Similar presentations
1 CHEP 2000, Roberto Barbera Grid activities at the ALICE Experiment TNC2002, On behalf of the ALICE GRID Working Group: G. Andronico.
Advertisements

DataTAG WP4 Meeting CNAF Jan 14, 2003 Interfacing AliEn and EDG 1/13 Stefano Bagnasco, INFN Torino Interfacing AliEn to EDG Stefano Bagnasco, INFN Torino.
Grid and CDB Janusz Martyniak, Imperial College London MICE CM37 Analysis, Software and Reconstruction.
The DataGrid Project NIKHEF, Wetenschappelijke Jaarvergadering, 19 December 2002
INFN Testbed status report L. Gaido WP6 meeting CERN - October 30th, 2002.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
F.Fanzago – INFN Padova ; S.Lacaprara – LNL; D.Spiga – Universita’ Perugia M.Corvo - CERN; N.DeFilippis - Universita' Bari; A.Fanfani – Universita’ Bologna;
Finnish DataGrid meeting, CSC, Otaniemi, V. Karimäki (HIP) DataGrid meeting, CSC V. Karimäki (HIP) V. Karimäki (HIP) Otaniemi, 28 August, 2000.
IST E-infrastructure shared between Europe and Latin America High Energy Physics Applications in EELA Raquel Pezoa Universidad.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
November SC06 Tampa F.Fanzago CRAB a user-friendly tool for CMS distributed analysis Federica Fanzago INFN-PADOVA for CRAB team.
ALICE Simulation Framework Ivana Hrivnacova 1 and Andreas Morsch 2 1 NPI ASCR, Rez, Czech Republic 2 CERN, Geneva, Switzerland For the ALICE Collaboration.
The ALICE short-term use case DataGrid WP6 Meeting Milano, 11 Dec 2000Piergiorgio Cerello 1 Physics Performance Report (PPR) production starting in Feb2001.
Andreas Morsch, CERN EP/AIP CHEP 2003 Simulation in ALICE Andreas Morsch For the ALICE Offline Project 2003 Conference for Computing in High Energy and.
EGEE is a project funded by the European Union under contract IST HEP Use Cases for Grid Computing J. A. Templon Undecided (NIKHEF) Grid Tutorial,
The ALICE Computing F.Carminati May 4, 2006 Madrid, Spain.
M.MaseraALICE CALCOLO 2004 PHYSICS DATA CHALLENGE III IL CALCOLO NEL 2004: PHYSICS DATA CHALLENGE III Massimo Masera Commissione Scientifica.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America High Energy Physics Applications in EELA.
30/07/2005Symmetries and Spin - Praha 051 MonteCarlo simulations in a GRID environment for the COMPASS experiment Antonio Amoroso for the COMPASS Coll.
ROOT WorkShop1 ALICE F.Carminati/CERN Root WorkShop Geneva, October 14.
Computing R&D and Milestones LHCb Plenary June 18th, 1998 These slides are on WWW at:
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 WP8 - Demonstration ALICE – Evolving.
NEC' /09P.Hristov1 Alice off-line computing Alice Collaboration, presented by P.Hristov, CERN NEC'2001 September 12-18, Varna.
Phase 2 of the Physics Data Challenge ‘04 Latchezar Betev ALICE Offline week Geneva, September 15, 2004.
2 Sep 2002F Harris EDG/WP6 meeeting at Budapest LHC experiments use of EDG Testbed F Harris (Oxford/CERN)
Large scale data flow in local and GRID environment Viktor Kolosov (ITEP Moscow) Ivan Korolko (ITEP Moscow)
Computing Issues for the ATLAS SWT2. What is SWT2? SWT2 is the U.S. ATLAS Southwestern Tier 2 Consortium UTA is lead institution, along with University.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
ARDA P.Cerello – INFN Torino ARDA Workshop June
ALICE RRB-T ALICE Computing – an update F.Carminati 23 October 2001.
ALICE experiences with CASTOR2 Latchezar Betev ALICE.
1 The AliRoot framework, status and perspectives R.Brun, P.Buncic, F.Carminati, A.Morsch, F.Rademakers, K.Safarik for the ALICE Collaboration CHEP 2003.
Status of AliEn2 Services ALICE offline week Latchezar Betev Geneva, June 01, 2005.
ALICE Computing TDR Federico Carminati June 29, 2005.
ALICE Physics Data Challenge ’05 and LCG Service Challenge 3 Latchezar Betev / ALICE Geneva, 6 April 2005 LCG Storage Management Workshop.
November 17, 2003LCG Comprehensive Review1 ALICE Offline Y. Schutz CERN, November 17, 2003.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
ALICE Computing Data Challenge VI
INFNGRID Technical Board, Feb
ALICE Offline Organisation and Status
ALICE and LCG Stefano Bagnasco I.N.F.N. Torino
BaBar-Grid Status and Prospects
The EDG Testbed Deployment Details
Real Time Fake Analysis at PIC
The ALICE Cosmic Ray Physics Program
LHC experiments Requirements and Concepts ALICE
ALICE analysis preservation
INFN-GRID Workshop Bari, October, 26, 2004
Alice DC Status P. Cerello March 19th, 2004.
Alice Week Offline Day F.Carminati June 17, 2002.
ALICE – First paper.
ALICE Physics Data Challenge 3
AliRoot status and PDC’04
MC data production, reconstruction and analysis - lessons from PDC’04
April HEPCG Workshop 2006 GSI
Alice Week Offline Day F.Carminati March 18, 2002 ALICE Week India.
Simulation use cases for T2 in ALICE
CMS report from FNAL demo week Marco Verlato (INFN-Padova)
CernVM Status Report Predrag Buncic (CERN/PH-SFT).
Stephen Burke, PPARC/RAL Jeff Templon, NIKHEF
US ATLAS Physics & Computing
ALICE-Grid Activities in Bologna
Alice Software Demonstration
The GENIUS portal and the GILDA t-Infrastructure
Use of Geant4 in experiment interactive frameworks AliRoot
Geant4 in HARP V.Ivanchenko For the HARP Collaboration
ATLAS DC2 & Continuous production
The LHCb Computing Data Challenge DC06
Presentation transcript:

ALICE – Evolving towards the use of EDG/LCG - the Data Challenge 2004 WP8 - Demonstration ALICE – Evolving towards the use of EDG/LCG - the Data Challenge 2004 S. Bagnasco, R. Barbera, P. Cerello for the Alice-Grid team Contact: cerello@to.infn.it

Outline Approach: - maximize resources - provide uniform access ALICE & its Offline Framework: AliRoot Running on EDG/LCG Software installation (multi)Event simulation on EDG – demo n. 1 – with GENIUS Strategy for the Data Challenge evolving to AliEn + LCG – demo n. 2 Conclusions Approach: - maximize resources - provide uniform access

Alice collaboration online system 8 kHz (160 GB/sec) 200 Hz (4 GB/sec) multi-level trigger filter out background reduce data volume Total weight 10,000t Overall diameter 16.00m Overall length 25m Magnetic Field 0.4Tesla 8 kHz (160 GB/sec) level 0 - special hardware 200 Hz (4 GB/sec) level 1 - embedded processors 30 Hz (2.5 GB/sec) Get the right numbers for ALICE level 2 - PCs 30 Hz (1.25 GB/sec) data recording & offline analysis

AliEn activity: the ALICE Physics Performance Report (2001-2003) Yerevan Saclay Lyon Dubna Capetown, ZA Birmingham Cagliari NIKHEF Catania Bologna Torino Padova IRB Kolkata, India OSU/OSC LBL/NERSC Merida Bari Nantes Houston RAL CERN Krakow GSI Budapest Karlsruhe 32 sites configured 5 sites providing mass storage capability 12 production rounds 22773 jobs validated, 2428 failed (10%) Up to 450 concurrent jobs 0.5 operators

AliRoot on EDG: Event Simulation Typical job for 1 central Pb-Pb event at the LHC energy (2288 TeV): 84,000 primary particles from Event Generators (HIJING) Transport + Digitisation: 12h on a 2.4 GHz CPU, > 500 MB RAM Output: about 2 GB, with new I/O many files (1/detector/simulation stage) Reconstruction: ITS+ TPC For this demo (time constraints) – show functionality Simulate few peripheral events, with 100 primary tracks each Register output in the ReplicaCatalogue Retrieve output & Display Event (pseudo-interactively)

the Grid The GENIUS Web Portal WEB Browser GENIUS Local EnginFrame WS Grid Services from a WEB Portal: anywhere and anyhow https+java/xml+rfb WEB Browser GENIUS EnginFrame Local WS Apache the Grid Grid Services Grid UI

AliEn+LCG ROOT AliRoot layout AliRoot G3 G4 FLUKA Virtual MC EVGEN ISAJET AliRoot HIJING AliEn+LCG Virtual MC EVGEN MEVSIM HBTAN STEER PYTHIA6 PDF PMD EMCAL TRD ITS PHOS TOF ZDC RICH HBTP STRUCT CRT START FMD MUON TPC RALICE ROOT C++: 477kLOC + 225kLOC (generated) FORTRAN: 13kLOC (ALICE) + 914kLOC (external packages)

AliRoot Evolution Schema Alice Offline Framework Root hits structures Root digit structures Physics results Root tracks C++ macro C++ macro C++ macro ROOT data visualisation Persistency Root output file Strategic decision in 1998

The ALICE Framework installation Three packages to install (ROOT + geant3 + AliRoot) Code available via CVS servers: 1-click-away install - download and make We can install with a Grid job!!!!!! And we do it  We can modify the code, compile and run on-the-fly  No change in ROOT/geant3/AliRoot to run on a GRID Infrastructure Installation on the EDG application testbed Re-locatable rpms are generated and published/retrieved Installation on the LCG-2 Production facility Source code is downloaded from CVS server(s) and compiled

ALICE Physics Data Challenges Verify model and computing framework Reduce the “technological risk” Understand physics potentialities of the detector Prepare code for reconstruction and analysis on real data Period (milestone) Fraction of final capacity (%) Physic objectives 06/01-12/01 1% Phys. performance studies, TPC and ITS reconstruction   06/02-12/02 5% First test of the complete chain from simulation to analysis for the Physics Performance Report (PPR) 01/04-06/04    10% (200 TB) Complete chain used for trigger studies. Prototype of analysis tools. Simulated raw data.  01/06-06/06  20% Test of the final system for reconstruction and analysis. Strategy: Maximise use of available resources: LCG + Alice-managed farms Use AliEn to manage the production Access LCG resources through AliEn-LCG interface Store all data in CASTOR @ CERN Register all data in AliEn Data Catalogue Data generated by LCG must also be registered on the LCG Catalogue

AliEn – EDG Interface Mar, 11th, 2003: first AliRoot job, driven by AliEn, run on EDG Server Job submission Interface Site AliEn CE EDG UI AliEn SE EDG RB EDG Site EDG CE WN AliEn EDG SE PFN Status report Replica Catalogue Data Registration LFN Data Catalogue LFN=PFN

AliEn & LCG: Data Challenge CE/SE A User submits jobs Alien CE/SE Submission Alien CE/SE Server LCG CE/SE Alien CE LCG UI Catalog LCG CE/SE LCG RB Catalog LCG CE/SE

Conclusions AliRoot is evolving into a solid computing infrastructure It was managed by AliEn for the Physics Performance Report in 2001-2003, while EDG (v1 & v2) was being developed/tested Data Challenge 2004 is starting, including resources provided by LCG, which are accessed through an interface with AliEn, developed with the support of DataTAG We look forward trying a distributed analysis on a Grid environment… Thanks to the EDG/LCG teams for their guidance and support in using newly developed GRID services!!!!!

AliEn, Genius & EDG/LCG seen by ALICE A User submits jobs Server Alien CE LCG UI Alien CEs/SEs LCG RB LCG CEs/SEs LCG PFN Catalog Catalog LCG LFN LCG PFN = AliEn LFN