PEM pre-O1 1) Current status of PEM system pre-O1: 80/90% working

Slides:



Advertisements
Similar presentations
ILIAS WG1 meeting - Birmingham1 Cryogenic Trap Vs Brewster window & noise coupling through windows J. Marque.
Advertisements

1 S5 Environmental Disturbances: August ‘06 Robert Schofield, U of O Erik Katsavounidis (MIT), Laura Cadonati (MIT), Michele Zanolin (MIT), Dennis Ugolini.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
LIGO-T V1 LIGO-T V1 (Fan Gasket Assembly) Fan Gasket for LLO Rack David Kinzel 1.
G Z 1 Block-Normal, Event Display and Q-scan Based Glitch and Veto Studies Shantanu Desai for Penn. State Burst Group And Glitch Working Group.
1 S4 Environmental Disturbances Robert Schofield, U of O John Worden, Richard McCarthy, Doug Cook, Hugh Radkins, LHO Josh Dalrymple, SU I.Pre-S4 “fixes”
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Introduction Dennis Coyne April 12, 2002.
Oregon Proposal, Jim Brau, PAC, December 5, Jim Brau Univ. of Oregon December 5, 2002 Oregon Proposal for LIGO Research LSC collaborator since formation.
LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.
S4 Environmental Disturbances Robert Schofield, U of O I.Pre-S4 “fixes” II.Some S4 veto issues III. Early coupling results from S4 PEM injections.
1 Environmental Disturbances: S4 and Pre-S5 Robert Schofield, U of O Doug Cook, Fred Raab, Richard McCarthy, LHO I.Seismic up-conversion II.Some peak identification.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
1 Environmental Disturbances: Early S5 and S4 Robert Schofield, U of O Rana Adhikari, CIT, Richard McCarthy, John Worden, LHO I.HVAC flow rate reduction.
LIGO-G M LIGO Laboratory1 Adv. LIGO Facilities Modifications (FAC) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
Laser Interferometer Gravitational-wave Observatory1 Characterization of LIGO Input Optics University of Florida Thomas Delker Guido Mueller Malik Rakhmanov.
1 S4 Environmental Disturbances Robert Schofield, U of O John Worden, Richard McCarthy, Doug Cook, Hugh Radkins, LHO Josh Dalrymple, SU I.Pre-S4 “fixes”
Electricity, Electronics And Ham Radio “Kopertroniks” By Nick Guydosh 4/12/07.
The Remote Sensing of Winds Student: Paul Behrens Placement and monitoring of wind turbines Supervisor: Stuart Bradley.
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
Making LIGO wind-resistant Krishna Venkateswara Borrowing from J. Kissel, B. Lantz, L. Barsotti, S. Dwyer, R. Schofield, D. Talukder, G. Vajente, M. Vidrio,
G D Tasks After S3 Commissioning Meeting, Oct 6., 2003 Peter Fritschel, Daniel Sigg.
Advanced LIGO Commissioning Overview Stanford LVC Meeting, August 27, 2014 Peter Fritschel.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
1 Update on PEM - related activities: March 2012 Robert Schofield (Oregon), Anamaria Effler (LSU), Richard McCarthy (LHO), Rich Abbott (CIT), Thomas Abbott.
G D Initial LIGO improvements & Advanced LIGO P Fritschel PAC Meeting LLO, 18 May 2005.
Noise Control A Guide for Workers and Employers. Steps used to solve Noise Control Problems Define the problem Establish a noise reduction target Determine.
Thoughts on short term improvements for Mirror Suspension Control G.Losurdo - P.Ruggi.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
31 May 2006Federico Paoletti Elba GWADW 1 Available traps (short sensors’ list) l Fast monitoring (50Hz < f sample < 20kHz)  vertical high frequency accelerometers.
1 Environmental Coupling During S5 Robert Schofield (University of Oregon) I. PEM injection overview II.Acoustic/seismic coupling III.Seismic upconversion.
1 EIB seismic noise and mitigation I.Fiori, Internal Meeting, 26 August 2009, EGO with E.Genin, F.Frasconi, R.Day, B.Canuel.
E v3 aLIGO SEI Testing and Commissioning Overall Plan
LIGO-G Z E7 Correlations Nelson Christensen, Russ Bainer - Carleton College Adrian Ottewill - University College Dublin Steve Penn - Syracuse.
Enhanced LIGO with squeezing: Lessons Learned for Advanced LIGO and beyond.
Daniel Clark Dan DeBra Victor Herrera Brian Lantz Joe Hansen Jeff Kissel Michael Meyer Brian O’Reilly Celine Ramet & Staff at LLO Anamaria Effler Michael.
Cascina, June 19th, Brewster window noise ? Raffaele Flaminio EGO and CNRS/LAPP Summary - Original observations - Brewster window replacement - New.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
1 Status of Search for Compact Binary Coalescences During LIGO’s Fifth Science Run Drew Keppel 1 for the LIGO Scientific Collaboration 1 California Institute.
The control of the Virgo Superattenuator: present and future Giovanni Losurdo - INFN Firenze/Urbino on behalf of the Virgo Collaboration.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
2009/6/25Amaldi 8 in NewYork City1 Thermal-noise-limited underground interferometer CLIO Kazuhiro Agatsuma and CLIO Collaborators Institute for Cosmic.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
G D LIGO Commissioning Update LSC Meeting, March 16, 2004 Peter Fritschel.
1 Frequency Noise in Virgo by Matt Evans. 2 The Actors  Noise Sources  Input Mode Cleaner length noise  Sensing noise on IMC lock  Frequency Servo.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
G I Enhanced LIGO Update Rana Adhikari July ’07 LSC Meeting.
Advanced SA Specifications & Scientific Motivations S.Braccini, Cascina 21 Settembre 2007.
Conor Mow-Lowry Thanks to: Krishna, Jeff, Brian, Jim, Hugh, Robert
Next Generation Low Frequency Control Systems
Daniel Sigg, Commissioning Meeting, 11/11/16
Aspen January, 2005 Nergis Mavalvala
Reaching the Advanced LIGO Detector Design Sensitivity
First Lessons from the Advanced LIGO Integration Testing
Commissioning Progress and Plans
Present Superattenuator performance vs. ET Requirements S
A Proposed Capacitive Position Sensor Timing Synchronization and Distribution Solution Ben Abbott May 9, 2014 G v1.
Commissioning Update PAC 15, Dec. 11, 2003 Daniel Sigg.
Superattenuator for LF and HF interferometers
Stochastic background search using LIGO Livingston and ALLEGRO
Status of LIGO Installation and Commissioning
Frequency Noise in Virgo
Environmental Monitoring: Coupling Function Calculator
ALLEGRO calibration for the LLO-ALLEGRO stochastic analysis
P Fritschel LSC Meeting LLO, 22 March 2005
Some ideas on advanced Virgo Twins A. Giazotto-INFN Pisa
ET Site evaluation WG2 group status report June 13, 2019.
Presentation transcript:

PEM pre-O1 1) Current status of PEM system pre-O1: 80/90% working 2) What we have learned so far about environmental coupling to the new instrument. a) Magnetic: >10 below, glitches at LLO a couple below b) Vibration, acoustic and seismic (scattering, jitter): 2 below, trucks don’t matter, at least O1, thanks to SEI! c) RF: good so far, much more to check d) Wind tilt: very local e) Beam tube particulate glitches: like estimate of intersite rate 3) Coupling to electronics: some improvements Robert Schofield, UO, Katie Banowetz, OSU, Terra Hardwick, LSU, Vinnie Roma, UO, Jordan Palamos, UO, Sudarshan Skarki, UO, Anamaria Effler, LSU, Ray Frey, UO, Dipongkar Talukder, UO, Hugh Radkins, LHO, Nutsinee Kijbunchoo, LHO, Richard McCarthy, LHO, Filiberto Clara, LHO

Current status of PEM pre-O1 Continuing installation 2) Recent tests of every accelerometer, microphone and magnetometer. Some cross-talk problems with accelerometers. 3) LIGOCam tuning 4) pem.ligo.org

Magnetic coupling Coupling at end, corner station (link) Substation Magnetic coupling Coupling at end, corner station (link) Coupling ended up at low end of pre-sensitive estimates (link) 3) Beam tube current glitches make low frequency coupling worse at LLO (link) 4) Studies of Schumann resonance detection and testing of sensitive magnetometers (link); estimates suggest not a problem in O1, but likely problem at higher sensitivity

Vibration, acoustic and seismic LVEA acoustic coupling (link) Input beam jitter noise (source identification: link) mount resonance tuning (link), (link) IMC alignment (link) Servos, ISS and special (link) Coupling at LHO HAM6 (link), coupling at LLO similar, not scattering (link) Blade spring and flexure resonances likely source of coupling at HAM6; possible damping solutions (link) Scattering from OMC (link) Scattering from beam tube baffles (link)

Greater Transmission at Blade and Flexure Resonances Slide: Katie Banowetz (2) (3) Greater Transmission at Blade and Flexure Resonances 3 Flexures inside HAM connect the two stages When HAM 6 was shaken, peaks appeared Possibly the result of flexures vibrating at natural frequencies Testing with Viton lined clamps to damp

RF RF recievers being installed. Four lambda/2 antennae inside, 4/2 wide band on roof Injection at all modulation frequenies etc. to look for sensitivites. So far injections not loud enough to see in DARM Jordans scanner

Wind tilt One year of wind tilt at LHO (link) Much lower tilt 40m from building (Link) Lower tilt in beer garden (Link)

Beam Tube Particulate Glitching Beam tube cleaning bumps at 0.1 g, 1000 Hz cause particulate glitches (link) Proposed experiment to test ambient intersite coincidence rate: shake at several amplitudes and try to get rate vs. amplitude curve for projection

Coupling to electronics 1) I/O chasis coupling (link) I/O power supply replaced with magnetically quieter supply Separate power supply for I/O chasis fans still not installed 2) Rack magnetometers were useful in identifying combs from HWS and ring heater at LLO, LHO (link)