Task 5.2 INERTIA Simulation Test Suite TECNALIA Joseba Jimeno

Slides:



Advertisements
Similar presentations
System Integration Verification and Validation
Advertisements

0 DOD/DT/CEDCV – 20 th & 21 st January Paris meeting SAGEM RTD Activities C2-Sense project Paris – 20 & 21 January 2015.
The Roundtable on Sustainable Forests What is the Roundtable on Sustainable Forests? As Described in the Past: An open and inclusive multi-stakeholder.
WP5 – Knowledge Resource Sharing and Management Kick-off Meeting – Valkenburg 8-9 December 2005 Dr. Giancarlo Bo Giunti Interactive Labs S.r.l.
CUTTHROAT ENERGY Preliminary Design Review. Sponsored by:
1 SYSTEM and MODULE DESIGN Elements and Definitions.
State of the Art in Theory and Practice of Rural Development Measures Partner 4: The University of Wales Aberystwyth.
Review of the test results and plan for the final testing campaign Panagiotis Mousouliotis EDUSAFE ESR3 PhD Candidate, Aristotle University of Thessaloniki.
Business Process Performance Prediction on a Tracked Simulation Model Andrei Solomon, Marin Litoiu– York University.
Clara Puech European Projects Coordinator EGNATIA EPIRUS Foundation INTERREG III B CADSES Neighbourhood Programm “HERITOUR” September 2005.
1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 WP2 “Design and implementation of infrastructure capturing.
The FI-WARE Project – Base Platform for Future Service Infrastructures Future Internet PPP Core Platform Views and interest from FI PPP FI-WARE International.
Scalable Semantic Product Data Stream Management for Collaboration and Decision Making in Engineering Project WP17: Demonstration and evaluation.
Jenny Linnerud, 27/10/2011, Cologne1 ESSnet CORE Common Reference Environment ESSnet workshop in Cologne 27th and 28th of October 2011.
OOI CyberInfrastructure Workshop: Ocean Observation Programs Preparation Phone Meeting May 5, 2008 Alan Chave, Michael Meisinger OOI CI System Engineering.
5 PR Praktikum aus Informatik Gabriele Kotsis Summer Term 2009.
Kick of WP3 Steps towards building Oxford, first project meeting :30 am – 11:15 am.
1 reTHINK Deliverables, How To Read reThink deliverables quick starter.
Work Package 6 L2C Kick-off meeting Fontainebleau, March 7th 2006.
Project Title All your names 1. Problem Space Importance of problem space How do people deal with this problem today? Who will care about a solution?
Doc.: IEEE a IEEE a OCC SG Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Optical.
Proposed Professional Master’s Degree Overview and Discussion College of Engineering, Advisory Council Meeting March 1, 2010 Laurie Larson, Extended University.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Concepts/ definitions/ meanings of program plan, program scheme, program development, concept paper Program plan is a systematic arrangement of elements.
“Temperature-Aware Task Scheduling for Multicore Processors” Masters Thesis Proposal by Myname 1 This slides presents title of the proposed project State.
WP7 - Dissemination of Results & Exploitation
Évora demonstrator site
SmartNet: A European research project to study TSO-DSO coordination for ancillary services provision from distribution networks Gianluigi Migliavacca (RSE)
WP2 - INERTIA Distributed Multi-Agent Based Framework
Task 4.2 Grid Coordination & DR Activation Module
User Profiling and Ambient UIs
WP3 Local Control and Automation Hub,
Task 2.5: Holistic Flexibility Models (M10 - M24)
WP4 - INERTIA Aggregators Monitoring, Management and Control Hub
A new platform for testing TSO-DSO coordination schemes
WP3: D3.1 status, pending comments and next steps
[WP1] T1.2 User and Business Requirements
[WP1] T1.2 User and Business Requirements
WP3 INERTIA Local Control and Automation Hub
WP2 INERTIA Distributed Multi-Agent Based Framework
Presentation of new INERTIA partner:
Dissemination Activities Report
WP3 - INERTIA Local Control and Automation Hub
Project Management Status
WP3 - INERTIA Local Control and Automation Hub
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
WP1 – Smart City Energy Assessment and User Requirements
Project Management Status
WP2 INERTIA Distributed Multi-Agent Based Framework
WP2 - INERTIA Distributed Multi-Agent Based Framework
20th CJK UNIOT-WG (Standardization of Mobile IPTV in ITU-T)
Software Project Management
WP1 - INERTIA Framework Requirements, Specifications and Architecture
ITAU Credit Cards Project
WP3 Local Control and Automation Hub,
WP6 Pilot Set-up, Model Calibration and Assessment
Presentation of the three technological pilots
Task 5.2 INERTIA Simulation Test Suite TECNALIA Joseba Jimeno
WP5 INERTIA Integration & Lab Testing
WP1 INERTIA Framework Requirements, Specifications and Architecture
Future Communications Infrastructure – An update
دانشگاه شهیدرجایی تهران
مهارات التدريس الفعال.
تعهدات مشتری در کنوانسیون بیع بین المللی
Wide Area Workload Management Work Package DATAGRID project
Project title All Your Names
BEWAG - General Assembly 2016 – Brussels
P AIRPORT SURFACE DATALINK
The Global Forum Electricity Ancillary Services and Balancing | Berlin, SmartNet Pilots: The demonstration of the different TSO-DSO coordination.
Task Manager & Profile Interface
Presentation transcript:

Task 5.2 INERTIA Simulation Test Suite TECNALIA Joseba Jimeno

Task 5.2 Index Task Overview Test system architecture Work plan Deliverable D5.2.1/2 Current status Issues

T5.2 -Task Overview Objective: Duration: Partners involved: “This task is aimed to define a complete Test Suite for the different components, modules and prototypes developed in the project, going further than the individual tests performed during and after the implementation and focusing on their integration” [DoW] Duration: Start: July 2013 (M10) End: March 2015 (M30) Partners involved: TECNALIA (3 pm), PPC (2 pm), ENELSI (1 pm) Deliverables: D5.2.1/D5.2.2 “INERTIA Simulation Test Suite” (M24)(M30)

T5.2 – Test system architecture Simulation test system

T5.2 – Work Plan Definition of the simulated system (M24): DSO Control Hub with simulated network scenarios Aggregator Control Hubs (1 aggregator) Local Control Hubs (CERTH + simulated) Definition of test scenarios (M24): Basic integration test scenarios Network operation scenarios Market operation related scenarios Local Control Hub related scenarios Performance/Scalability tests???

T5.2 – Work Plan Development of test suite for each of the scenarios considering the simulation test system (M32). For each test in the test suite: Elements (SW & HW) participating in the test Preconditions Step by step instructions to execute the test Expected results for each step

T5.2 – Work plan Expected contribution from partners: TECNALIA: Definition of the simulated system, scenarios and test suite development PPC: Support on the definition of network operation related scenarios ETC EI: Consumption profiles for tertiary buildings PV generation profiles

T5.2 – Deliverable D5.2.1/2 Two deliverables: D5.2.1 (M24) Description of the test components Definition of test scenarios D5.2.2 (M30) Test suite

T5.2 – Current Status Initial first draft of D5.2.1 Started some discussions with partners: LCH simulators Market scenarios to be tested System set up at CERTH for executing the simulation tests

T5.2 – Issues Even if not participating in Task 5.2 contribution from developer partners is required HYPERTECH and ALMENDE for the Aggregator related scenarios (specifically market related scenarios) CERTH/Cnet/ALMENDE/HYPERTECH for LCH related scenarios ALMENDE for simulated LCHs Proposal: circulation of the D5.2.1 draft asking for specific contributions

T5.2 – Issues LCH simulators Market related scenarios How many? How are they implemented? What data is needed? Main responsible: ALMENDE Market related scenarios What scenarios will be tested? What does the VA need form the MAS optimization component? What data is needed to build the scenarios? Main responsible: HYPERTECH/ALMENDE

T5.2 – Issues CERTH LCH LCH scenarios Exactly what devices and sensors will be used in the simulation tests? Main responsible: CERTH/Cnet LCH scenarios What scenarios will be tested? What data is needed to build the scenarios? Main responsible: CERTH/Cnet/ALMENDE/HYPERTECH

Thank you for your attention