Task 5.2 INERTIA Simulation Test Suite TECNALIA Joseba Jimeno
Task 5.2 Index Task Overview Test system architecture Work plan Deliverable D5.2.1/2 Current status Issues
T5.2 -Task Overview Objective: Duration: Partners involved: “This task is aimed to define a complete Test Suite for the different components, modules and prototypes developed in the project, going further than the individual tests performed during and after the implementation and focusing on their integration” [DoW] Duration: Start: July 2013 (M10) End: March 2015 (M30) Partners involved: TECNALIA (3 pm), PPC (2 pm), ENELSI (1 pm) Deliverables: D5.2.1/D5.2.2 “INERTIA Simulation Test Suite” (M24)(M30)
T5.2 – Test system architecture Simulation test system
T5.2 – Work Plan Definition of the simulated system (M24): DSO Control Hub with simulated network scenarios Aggregator Control Hubs (1 aggregator) Local Control Hubs (CERTH + simulated) Definition of test scenarios (M24): Basic integration test scenarios Network operation scenarios Market operation related scenarios Local Control Hub related scenarios Performance/Scalability tests???
T5.2 – Work Plan Development of test suite for each of the scenarios considering the simulation test system (M32). For each test in the test suite: Elements (SW & HW) participating in the test Preconditions Step by step instructions to execute the test Expected results for each step
T5.2 – Work plan Expected contribution from partners: TECNALIA: Definition of the simulated system, scenarios and test suite development PPC: Support on the definition of network operation related scenarios ETC EI: Consumption profiles for tertiary buildings PV generation profiles
T5.2 – Deliverable D5.2.1/2 Two deliverables: D5.2.1 (M24) Description of the test components Definition of test scenarios D5.2.2 (M30) Test suite
T5.2 – Current Status Initial first draft of D5.2.1 Started some discussions with partners: LCH simulators Market scenarios to be tested System set up at CERTH for executing the simulation tests
T5.2 – Issues Even if not participating in Task 5.2 contribution from developer partners is required HYPERTECH and ALMENDE for the Aggregator related scenarios (specifically market related scenarios) CERTH/Cnet/ALMENDE/HYPERTECH for LCH related scenarios ALMENDE for simulated LCHs Proposal: circulation of the D5.2.1 draft asking for specific contributions
T5.2 – Issues LCH simulators Market related scenarios How many? How are they implemented? What data is needed? Main responsible: ALMENDE Market related scenarios What scenarios will be tested? What does the VA need form the MAS optimization component? What data is needed to build the scenarios? Main responsible: HYPERTECH/ALMENDE
T5.2 – Issues CERTH LCH LCH scenarios Exactly what devices and sensors will be used in the simulation tests? Main responsible: CERTH/Cnet LCH scenarios What scenarios will be tested? What data is needed to build the scenarios? Main responsible: CERTH/Cnet/ALMENDE/HYPERTECH
Thank you for your attention