The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting.

Slides:



Advertisements
Similar presentations
National Thousands Block Number Pooling Services NANC Meeting May 18, 2004.
Advertisements

1 National Thousands Block Number Pooling Services NANC Meeting September 14, 2004.
Accounting and Financial Reporting
Year-end Planning Key Changes Accruals Receiving P-Cards Roles/Responsibilities Handout Year-end calendar 1.
Special Registry/Industry Q&A Session ALLOWABLE COSTS SUBMISSIONS
Claims Timeliness Requirements Effective January 1, 2013.
Natural Gas Liquids Royalty Framework Changes
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Waste Plant Operator Meeting Monday, March 30, 2009.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session June 22, 2005.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session September 21, 2006.
Page 1 of 11 Lessees can submit individual Unit Values for their Production Entities if they do not want to utilize the default unit value. If no Unit.
Creating and Submitting a Necessary Wayleave Application
Fall Data Collection 2012 September Agenda Timelines Educator Profile Sept 17 th Initial Student Enrolments Sept 28 th Enrolment Snapshot October.
The Petroleum Registry of Alberta REGISTRY INFORMATION SESSION June 2, 2004.
The Petroleum Registry of Alberta Training Session September 27, 2004 The Petroleum Registry of Alberta Energizing the flow of information.
Production Allocation Discrepancy Reporting
General Ledger Fiscal Year End Closing out WELCOME! To the Year End Workshop. During this workshop and presentation, references will be made to.
Training Monday, February 04, Saturday, October 11, Welcome to the Accounts Payable Invoice Processing Course.
Page 1 of 16 Royalty Reporting is an online service available in the Electronic Transfer System (ETS). It provides the functionality of electronic submission.
Travel 1: Travel Authorization. Welcome to Training! Why PeopleSoft? – PeopleSoft will help UTEP to grow. What’s Your Part? – We need your skills and.
Page 1 of 36 The Public Offering functionality in Posting allows users to submit requests for public offerings of Petroleum and Natural Gas(PNG) and Oil.
Page 1 of 30 This process involves authorizing a company to act on behalf of the designated representative for a Crown petroleum and natural gas licence.
The Petroleum Registry of Alberta Training Session September 27, 2004 The Petroleum Registry of Alberta Energizing the flow of information.
School Community Councils Working Together for School Improvement.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information REGISTRY INFORMATION SESSION February 24, 2005.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session January 24, 2006.
The Petroleum Registry of Alberta REGISTRY INFORMATION SESSION March 2, 2004.
The Petroleum Registry of Alberta REGISTRY INFORMATION SESSION May 29, 2003.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session September 22, 2005.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Waste Plant Operator Meeting Thursday February 26,
The Petroleum Registry of Alberta REGISTRY INFORMATION SESSION December 2, 2003.
400 7 th Street, SW | Washington | DC w w w. d o t. g o v MARAD Virtual Office of Acquisitions (VOA) NS Savannah Proposal May 24, 2006.
Supply Chain ERP: Vendor Training Change is coming …. Change is Here!!!!!!!!!!
1 Adjusting the “Dispatch Instructions” to the Defined Metering Point (DMP). “Functional Deferral 6 (FD-06)” Market Operations Standing Committee (MOSC)
1 27 April 2004 CFS Division Day – New York hCue Product Demonstration Walter Garcia Business Analyst.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Terminal Reporting Changes Meeting.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Lead Management Tool Partner User Guide March 15, 2013
1 Railroad Clearing House for Car Hire ACACSO May 7, 2008 Chicago, Illinois Anthony Glover.
Class Description In the class today we will be discussing how to properly file the PR report. The PR report is a monthly report that is filed by the.
MyFloridaMarketPlace Vendor Performance Tracking Overview: Requestor Interface February 23, 2006.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
NHS Connecting for Health Ophthalmic Payments Electronic submission of GOS claims.
Archdiocese of Chicago Interim Report Training Class CLICK IT AND SUBMIT IT! Presentation Will Start Presentation Will Start at 10 am at 10 am.
DCA timeline and ROM Overview 12 October Smart Metering Indicative Timeline Evaluation Service (EVS) 2528 received / Rough Order of Magnitude.
Pipeline and Terminal Reporting Changes Meeting February 11, 2004
REGISTRY INFORMATION SESSION
Production Allocation Discrepancy Reporting
REGISTRY INFORMATION SESSION
Registry Information Session
REGISTRY INFORMATION SESSION
Waste Plant Operator Meeting
APMC/Industry Conventional Oil Forecasting Project Update Conoco Phillips Auditorium 3rd Floor Gulf Canada Square January 25, 2016.
REGISTRY INFORMATION SESSION
Registry Information Session
Expense Report Training
Ohio Web Portal Ohio Edison, Illuminating Company, Toledo Edison
Waste Plant Operator Follow-up Meeting
Form 1040 Electronic Signature Initiatives
REGISTRY INFORMATION SESSION
Expense Report Training
Registry Information Session
The Petroleum Registry of Alberta Energizing the flow of information
Waste Plant Operator Meeting
The Petroleum Registry of Alberta Energizing the flow of information
Registry Information Session
ETS – Air Data submission Training
Pipeline and Meter Station Reporting Changes Meeting February 4, 2004
EMS &Trauma Registries Update
Presentation transcript:

The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Meter Station Reporting Changes Meeting February 4, 2004

The Petroleum Registry of Alberta Agenda –Introductions –Purpose of the Meeting –Reporting Changes Background Design Changes –Implementation –Other

The Petroleum Registry of Alberta Purpose of the Meeting Inform the Operators of the changes to the pipeline and meter station reporting Discuss the Implementation Process and Timing of the changes Capture any other input from the Pipeline Operators

The Petroleum Registry of Alberta Background of Reporting Changes TCPL is required to report many paper pipelines in order for the Registry to accommodate the large number of meter stations and auto population of activities. ATCO also has large files with many meter stations and auto population of activities --- requires processing after Registry hours. Volumetric Changes to a single meter station require the entire PL to be resubmitted – results in large amount of processing in order to change one number.

The Petroleum Registry of Alberta Background of Reporting Changes Contd Some pipeline to pipeline activities are not able to be reported under the current setup and rules. Liquids Pipelines and Terminals are unable to report DISPs to Alberta facilities when they control the measurement of the product. Changes required to reflect the true business process for pipelines Funding –Shared equally between Industry, DOE and EUB –Total cost = $126 K

The Petroleum Registry of Alberta Design Changes Reporting done at the MS level versus the PL –Transactions will begin at the meter station (MS) and the Registry will autopopulate the Pipeline activity. –CSOs are restricted at the MS to the specific activities (i.e. at a 631 type MS, the CSO can only report receipts). –ISCs will be required at the meter station but the Registry will not autopopulate them where they are not needed (no ISCs at the PL).

The Petroleum Registry of Alberta Design Changes - cont Key Terms Field relates to a meter station that receive gas from facilities that are inside the Royalty network i.e. GS, GP, IF Interconnect relates to meter stations where the gas is leaving (flowing out of) a pipeline to another facility these other facilities includes other pipelines, BT, GS, GP, IF, PL Interconnect Receipt and Interconnect Disposition meter stations are the same type of meter stations except an interconnect receipt meter station will be reported by the receiving facility operator (receipts will populate dispositions) and the interconnect disposition meter station will be reported by the disposing facility operator (dispositions will populate receipts).

The Petroleum Registry of Alberta Design Changes - cont Key Terms Autopopulate Flag is an infrastructure item that indicates the volume, energy and ISCs (where applicable) transactions will be created to flow through (in and out of) the meter station to the facilities connected on both ends of the meter station. It can only be used when there is a one to one relationship between the meter station and a single facility connected on each end of the meter station i.e. the meter station receives from a single facility and delivers to a single facility.

The Petroleum Registry of Alberta Design Changes - cont Meter Station Sub type Definitions 631 Field Receipt Meter Station This subtype of meter station handles field Receipts from producing facilities. Gas DISP to this type of MS is a Royalty Trigger and requires an SAF/OAF to be submitted. 632 Interconnect Receipt Meter Station This subtype of meter station handles gas leaving the pipeline it is linked to. The PL operator will report the MS REC from the PL. The CSO can only report the MS DISP to facilities other than the linked PL if the auto populate flag set is set to No. If the auto populate flag is set to Yes the PL operator will report the MS REC from the PL and the Registry will auto populate the DISP to the other facility.

The Petroleum Registry of Alberta Design Changes - cont Meter Station Sub type Definitions 633 Interconnect Disposition Meter Station This subtype of meter station handles gas leaving the pipeline it is linked to. The PL operator may report the MS REC from the PL. The CSO may report the MS DISP to facilities other than the linked PL if the auto populate flag is set to No. However if the auto populate flag is set to Yes the CSO may report the DISP to the single facility linked downstream from the MS and the Registry will auto populate the REC from the linked PL. 634 Interconnect Non Reconciled Meter Station This subtype of meter station is used to identify when gas is leaving or entering the PL the MS is linked to via a non-reporting entity. For example Gas from or gas to Saskatchewan. It should always be 100% out of balance. Only the linked PL should be reported in the from/to field at this type of MS.

The Petroleum Registry of Alberta Design Changes - cont Meter Station Sub type Definitions 635 Registry Summary Non Reporting Meter Station This subtype of meter station is not used for volumetric reporting in the Registry. 636 Non Reporting Meter Station This subtype of meter station is not used for volumetric reporting in the Registry. 637 NEB Regulated Field Receipt Meter Station This subtype of meter station handles field Receipts from producing facilities. Gas DISP to this type of MS is a Royalty Trigger and requires an SAF/OAF to be submitted.

The Petroleum Registry of Alberta Design Changes – cont Meter Station Sub type Definitions 638 NEB Regulated Interconnect Receipt Meter Station This subtype of meter station handles gas leaving the pipeline it is linked to. If the MS is reporting in the Registry. The PL operator will report the MS REC from the PL. The CSO can only report the MS DISP to facilities other than the linked PL if the auto populate flag set is set to No. If the auto populate flag is set to Yes the PL operator will report the MS REC from the PL and the Registry will auto populate the DISP to the other facility.

The Petroleum Registry of Alberta Design Changes - cont Meter Station Sub type Definitions 639 NEB Regulated Interconnect Disposition Meter Station This subtype of meter station handles gas leaving the pipeline it is linked to. If the MS is reporting in the Registry. The PL operator may report the MS REC from the PL. The CSO may report the MS DISP to facilities other than the linked PL if the auto populate flag is set to No. However if the auto populate flag is set to Yes the CSO may report the DISP to the single facility linked downstream from the MS and the Registry will auto populate the REC from the linked PL.

The Petroleum Registry of Alberta MS Subtype 631 & 637 PL/MS Oper reports DISP to PL w/ISC CSO reports REC w/ISC from multiple facilities Linked Pipeline – REC from MS No ISC Auto GP DISP to MS w/ISC Auto IF DISP to MS w/ISC Auto Design Changes - cont MS Subtype 631 & 637 with No Auto populate

The Petroleum Registry of Alberta Linked Pipeline REC from MS No ISC Auto GP DISP to MS w/ISC Auto MS Subtype 631 & 637 PL/MS Oper reports DISP to PL w/ISC MS REC from GP w/ISC Auto Design Changes - cont MS Subtype 631 & 637 with Auto Populate

The Petroleum Registry of Alberta MS Subtype 632 & 638 PL/MS Oper reports REC from PL w/ISC CSO reports DISP w/ISC to multiple facilities Linked Pipeline – DISP to MS No ISC Auto GP* REC From MS No ISC Auto IF* REC from MS w/ISC Auto PL* REC From MS No ISC Auto * IFs only will have ISCs populated Design Changes - cont MS Subtype 632 & 638 with No Auto Populate

The Petroleum Registry of Alberta MS Subtype 632 & 638 PL/MS Oper reports REC from PL w/ISC MS DISP to GP w/ISC Auto Linked Pipeline – DISP to MS No ISC Auto GP* REC from MS No ISC Auto * IFs only will have ISCs populated Design Changes - cont MS Subtype 632 & 638 With Auto Populate

The Petroleum Registry of Alberta MS Subtype 633 & 639 PL/MS Oper reports REC from PL w/ISC CSO reports DISP to multiple Facilities w/ISC Linked Pipeline – DISP to MS No ISC Auto GP* REC from MS No ISC Auto GS* REC from MS No ISC Auto IF* REC from MS w/ISC Auto * IFs only will have ISCs populated Design Changes - cont MS Subtype 633 & 639 with No Auto Populate

The Petroleum Registry of Alberta Linked Pipeline – DISP to MS No ISC Auto IF* REC from MS w/ ISC Auto MS Subtype 633 & 639 MS REC from PL w/ISC Auto CSO reports DISP to Single Facility w/ISC * IFs only will have ISCs populated Design Changes - cont MS Subtype 633 & 639 With Auto Populate

The Petroleum Registry of Alberta Linked Pipeline – DISP to MS No ISC Auto MS Subtype 634 PL/MS Operator reports REC from PL No ISC No DISP created MS 100% out of balance No CSO Design Changes - cont MS Subtype 634 Gas Leaving the Pipeline (PL)

The Petroleum Registry of Alberta Linked Pipeline – REC from MS No ISC Auto MS Subtype 634 PL/MS Operator reports DISP to PL No ISC No REC created MS 100% out of balance No CSO Design Changes - cont MS Subtype 634 Gas Entering the Pipeline (PL)

The Petroleum Registry of Alberta Implementation –Steering Committee approval was received January 21, 2004 –Development has commenced and is to be completed and system tested by March 31 st –Acceptance Testing will occur in April –Conversion, by the Registry, to the new process is estimated at 5 days and will take place right after the EUB deadline – approx. May 20 th

The Petroleum Registry of Alberta Implementation - cont Prior to implementation of the changes, cleanup and validation is needed on existing data –Pipeline operators need to validate existing Meter station subtypes ( any required changes to –Any pending records need to be accepted (operator must Submit) –Pipeline operators need to clean up outstanding EUB non-compliance issues, where possible

The Petroleum Registry of Alberta Implementation Schedule TaskDate Required Complete Validation of MS Subtypes (MS operators) February 28 th Facility operators accept pending records and balance MS and PLs March 31st Registry Development Complete March 31 st Registry Acceptance Testing April 1 – 30 th Pipeline Companies test batch file submission April 15 – May 15 th Registry ConversionMay 20 – 25th Go Live with new processMay 26th

The Petroleum Registry of Alberta Other Items Confirm the Change Leader – with the name, phone number, and of contact person Pipeline Splits –Electronic uploads to the pipeline companies –Availability mid-year for industry to use New Issues?