Paving a Gravel Road Case Study

Slides:



Advertisements
Similar presentations
Rodrigo Archondo-Callao ETWTR
Advertisements

The Economics Of Road Investment
ESTONIAN ROAD ADMINISTRATION Pärnu mnt. 463a Tallinn, Estonia Tel (0) Fax (0)
To Pave or Not to Pave? Making Informed Decisions on When to Upgrade a Gravel Road.
PASSABILITY CRITERIA FOR UNPAVED ROADS (The experience of an operational road engineer guided by research findings) PRESENTATION BY MARTIN HMENSA DEPARTMENT.
Economic Analysis Concepts. 2 Is the project justified ?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive.
Highways: free or toll?. In the past, roads were considered a public good Now it is possible to make people pay: should roads be produced by the private.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
8 th Road Pavements Forum 17 Nov 2004 SABITA PROJECT: Warrants for upgrading SuperSurf J Lea and P Paige-Green.
1 Ministry of Transport, Public Works and Water Management.
Cost Benefit Analysis As economists, we are usually called in when the project is already designed.
AT Benefit Cost Analysis Model Highway Design, Project Management and Training Section Technical Standards Branch Presented by Bill Kenny, Director: Design,
Henry Kerali Lead Transport Specialist The World Bank
OPPORTUNITIES FOR INVESTMENT IN THE STATE OF GOIAS DEVELOPMENT INFRAESTRUCTURE OF TRANSPORT IN METROPOLITAN REGION OF GOIÂNIA.
Roads Economic Decision Model (RED) January 2008 Rodrigo Archondo-Callao Senior Highway Engineer, ETWTR The World Bank.
Deterioration Unsealed Roads. 2 Gravel Earth (or Sand) * Unsealed Roads Classification * Engineered roads.
Webinar Texas Department of Transportation : Costs Associated with Conversion of Surfaced to Un-Surfaced Roads August 30, 2012.
Road Network Evaluation Tools (RONET) Version 2.00 January, 2009 Rodrigo Archondo-Callao.
Research Priorities for the Transportation and Traffic Safety Center in Kuwait Dr. Fahad AL-Rukaibi Director Transportation & Traffic Safety Center Faculty.
Evaluation of Low Volume Roads Rodrigo Archondo-Callao Senior Highway Engineer, ETWTR January 10, 2008 The World Bank.
ROAD CONSTRUCTION COSTS Key Concepts. Types of Main Road Works Routine Maintenance Works are day-to-day running repairs, e.g. Potholes, depressions, crack.
ECONOMIC EVALUATION. Economic evaluation: what is it?  Economic evaluation is the traditional tool for prioritizing road investment  It provides a monetarised.
Investment Appraisal. A means of assessing whether an investment project is worthwhile or not Investment project could be the purchase of a new PC for.
Optimum Road Surface Design John Hine International Division TRL Limited.
1 Economic Justification. 2 Used to evaluate project alternatives Compare projects Often a hurdle rate (eg. An IRR of > 20%) Variety of measurements:
DEPARTMENT OF ROADS AND TRANSPORT LIMPOPO PROVINCE INFRASTRUCTURE.
Social cost benefit analysis of Delhi Metro
1 Asset Management and Multi-Year Programming Christopher R. Bennett University of Auckland Highway and Traffic Consultants Ltd.
The World Road Association Development of HDM-4 Neil Robertson PIARC ISOHDM Project Coordinator.
1 THE HDM-4 TECHNICAL RELATIONSHIPS STUDY Asian Development Bank RETA 5549 Dr. Christopher R. Bennett Team Leader HDM-4 Technical Relationships Study ISOHDM.
HDM-4 Analysis Options The World Bank Christopher R. Bennett Director - Data Collection Ltd.
Roadex meeting 2016, Oslo Challenges and activities with low volume roads management in Estonia Taavi Tõnts Estonian Road Administration / Leading engineer.
C OUNTRY AND C OMPANY OVERVIEW C HALLENGES AND ACTIVITIES WITH LOW VOLUME ROADS MANAGEMENT Jānis Barbars ROADEX meeting, Oslo 5th April 2016.
Works and Transport Sector Overview of 2016/17 Grant and Budget Guidelines Ministry of Works and Transport and Uganda Road Fund.
1 The HDM Approach to Multi- Year Programming Christopher R. Bennett University of Auckland Highway and Traffic Consultants Ltd.
HDM-4: Pavement Deterioration Modeling and Road User Effects
Road Investment Decision Framework
Overview of dTIMS Input, Analysis and Reporting HTC INFRASTRUCTURE MANAGEMENT LTD.
6/2008 Keeping Finland Moving. 2 6/2008 Jukka Hirvelä Facts about Finland km² of which 77% is forest and 10% lakes and inland waterways. Built-up.
The University of Birmingham Role of HDM-4 in Road Management Professor Henry Kerali The University of Birmingham England, UK.
Road Owners and PMS Christopher R. Bennett Senior Transport Specialist East Asia and Pacific Transport The World Bank Washington, D.C.
Facing Funding and Weather Challenges: Impact of Weather Events on Treatment Selection and Pavement Condition PPRA Fall Meeting 2014 November 17-19, Baltimore,
INVESTMENT ANALYSIS OR CAPITAL BUDGETING
SR 156 Level 2 Toll Study TAMC Board Meeting August 23, 2017
Economic Concepts Christopher R. Bennett
Caldwell and Wilson (1999) 1. Determine primary rating factor for a road section based on traffic volume and user types 2. Primary rating factor is then.
Multi-Year Programming and Predictive Modelling
Internal Rate of Return
The South African National Roads Agency SOC Ltd
Economic Implications of Deteriorating Highway Conditions
EWG Study Tour, Galway, 18/09/2006
Introduction and Applications
Transportation Funding
High way and Transportation 2(Lab) LCIV 3034
LOGISTICS NETWORK.
Unsealed Road Deterioration
Project Feasibility Analysis
Christopher R. Bennett The World Bank Senior Transport Specialist NB :
Introduction and Applications
Introduction and Applications
التقييم المالي للمشروع
ROAD INFRASTRUCTURE DEVELOPMENT PROGRAMME ZIMBABWE
Success Factors for Computerized Road Management Systems
RED Model Case Study: Economically Justified Levels of Road Works Expenditures on Unpaved Roads January 2008 Rodrigo Archondo-Callao Senior Highway.
Worked Example: Highway Safety Modeling
Safe, Smooth, Sustainable Access Can we really have it all?
Investment Appraisal.
Kerala Expressway Cost Benefit Analysis Avik Rakhit.
The road maintenance backlog in South Africa
ESTIMATION OF MARGINAL SOCIAL COST, ISSUES AND SUGGESTIONS: The case for Namibian roads Presenter: Helvi Petrus Promoter: Stephan Krygsman.
Presentation transcript:

Paving a Gravel Road Case Study Christopher R. Bennett Director - Data Collection Ltd. The World Bank Paving a Gravel Road Case Study

The Scenario Without Project Case - Routine maintenance - Gradings every 180 days - Regravelling when gravel < 50 mm With Project Case - Pave the road in 2000 and after paving - Routine maintenance - Pothole patching - Resealing when damaged area > 20 % Gravel Road with 200 AADT

Road Deterioration and Timing of Works Replace Gravel at 50 mm Paving Reseal at 20% damaged area

Alternatives and Standards Maintenance Standard Alternative 1 with 1 Standard Maintenance Standard Alternative 2 with 2 Standards Improvement Standard

Comparison of Alternatives

Net Present Value (NPV) Case without Generated Traffic Paving a Gravel Road Case Study

Total Society Costs

Internal Rate of Return (IRR) NPV IRR Paving a Gravel Road Case Study

Distribution of Net Benefits

Project Impact

Generated Traffic Benefits

Transport Demand Elasticity

Generated Traffic Benefits Example

Optimal Grading Frequency (Efficiency Frontier Graph)

Optimal Grading Frequency (Average Roughness Graph)

Optimal Paving Timing (Efficiency Frontier Graph)

Unpaved Network Maintenance Funding Second State Highway Management Project Brazil, 1994 No of Gradings per Year Average Roughness Net Present Value Economic Costs/Year/km ($) Financial Costs/Year/km ($) Total Financial Costs/Year (M$); 1,838km

Selection and Justification of Project Components Second State Highway Management Project Brazil, 1994 New length (km) Initial Traffic (ADT) Initial Roughness (IRI) ERR (%) NPV (M US$) Financial Project Cost (M US$) Financial project Cost/km (US$/km) Total State ERR, Length, and Financial Project Cost

Accident Rates Number per 100 million vehicle-km - South Africa: Economic Warrants for Surfacing Roads, 1989, SABITA and CSIR - Canada : The Economic Appraisal of Highway Investment “Guidebook”, 1992, Ministry of Transportation

Accident Rates Number per 100 million vehicle-km

Accident Rates Assumptions Different Proportion Same Proportion

Accidents and NMT Benefits Base With With Accidents Accidents & NMT NPV 4.2 5.1 6.5 IRR 18.9% 20.2 % 22.2% NMT => 10 Bicycles ($75 purchase cost) 5 Rickshaws ($130 purchase cost) 5 Animal Carts ($180 purchase cost)