Tge draft ballot information

Slides:



Advertisements
Similar presentations
Doc.: IEEE /177r0 Submission January 2000 Ian Gifford, M/A-COM, Inc.Slide 1 IEEE P Working Group for Wireless Personal Area Networks TG1.
Advertisements

Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE /0144r01 Submission February 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the February EC Telecon IEEE P Wireless.
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: IEEE /0659r0 Submission July 2005 John Fakatselis, ConexantSlide 1 Tge draft Sponsor Ballot Information Notice: This document has been prepared.
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
A Proposed Timeline for IEEE ba TG
Submission Title: [TG4e Closing Report for November 2011 Session]
IEEE TGv March 2010 Agenda Date: Authors: March 2010
IEEE TGa Project Timeline
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
802.11e Portland Report July 16, 2004 July 16, 2004
802.11e Berlin Report September 17, 2004 September, 2004
Sub-1 GHz Study Group Closing Report Sept 2018
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
d 100G to Sponsor Ballot (unconditional)
HTC 34; 5656 AE Eindhoven, the Netherlands
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGs San Diego Closing Report
July 2014 doc.: IEEE /25/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
IEEE Motions at the November Plenary EC Meeting
802.11e Albuquerque NM Meeting Report
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
July 2014 doc.: IEEE /17/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
IEEE Motions in July Plenary DCN:
IEEE Motion at the February EC Telecon
doc.: IEEE /479r0 Mika Kasslin TGh chair
Month Year IEEE Motions in July Plenary DCN:
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
Closing IEEE 802 EC Friday 15th March 2019
IEEE Task Group G Report
802.11bd Timeline Date: Authors: January 2019
Closing IEEE 802 EC Friday 15th March 2019
Closing IEEE 802 EC Friday 15th March 2019
IEEE Motion at the February EC Telecon
802.11e Monterey meeting 09/13/02 September, 2002
doc.: IEEE /479r0 Mika Kasslin TGh chair
IEEE MEDIA INDEPENDENT HANDOVER
IEEE P Working Group for Wireless Personal Area Networks
July 2014 doc.: IEEE /18/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
IEEE SGa Project Timeline
802.11e Vancouver Report January 16,2004 January 15, 2004
TGad March 2011 Closing Report
IEEE Revision Timeline
TGs Process, September Date: Authors: September 2007
September 2009 Closing Report
Submission Title: Berlin e/ Liaison Report.
Tge draft ballot information
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Editor Report Sept 2008 Date: Authors:
Motion via Ballot IEEE motion Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot.
TGs Process, March Date: Author: March 2009 March 2009
TGs Process, January Date: Authors: January 2007
IEEE MEDIA INDEPENDENT HANDOVER
P b to RevCom: Conditional Approval Request
Sheung Li Task Group J Chairperson March 19, 2004
May 2008 Closing Plenary Motions
802.11e San Francisco Meeting Report
P802.11j Sponsor Ballot Procedure 10
TGs Taipei Closing Report
July 2019 IEEE P Spectrum Characterization and Occupancy to Sponsor Ballot IEEE WG Letter Ballot Launch Date # of Comments Received Comment Resolution.
TGs Process, March Date: Authors: March 2008 March 2008
Presentation transcript:

Tge draft ballot information March 2004 Tge draft ballot information John Fakatselis, Tge Chair Srinivas Kandala John Fakatselis & Srinivas Kandala

March 2004 History Adds QoS to IEEE 802.11 standard to meet a wide range of application and market requirements. Study Group began work in November 1999. PAR and 5 Criteria approved in March 2000. First 3 drafts issued failed to achieve the required 75% approval vote. John Fakatselis & Srinivas Kandala

First 3 drafts Draft 1.0 (LB 27) Draft 2.0 (LB 30) Draft 3.0 (LB 39) March 2004 First 3 drafts Draft 1.0 (LB 27) Closed on May 15, 2001 38% Yes Vote, 62% No Vote (15% Abstain) Draft 2.0 (LB 30) Closed on Jan. 16, 2002 55% Yes Vote, 45% No Vote (15% Abstain) Draft 3.0 (LB 39) Closed on July 2, 2002 49% Yes Vote, 51% No Vote (17% Abstain) John Fakatselis & Srinivas Kandala

Summary of the successful letter ballots March 2004 Summary of the successful letter ballots Letter Ballot (Closing Date) Letter Ballot 51 (Jan. 8, 2003) Letter Ballot 59 (Aug. 1, 2003) Letter Ballot 63 (Dec. 20, 2003) Yes No Abs Total Votes 222 46 27 240 34 26 248 30 23 Percentage 83% 17% 9% 88% 12% 89% 11% 8% Voting Response 92% 93% 94% Letter Ballot (Closing Date) Letter Ballot 65 (Feb. 15, 2004) Letter Ballot 67* (Mar. 10, 2004) Yes No Abs Total Votes 258 19 24 268 10 23 Percentage Voting Response 94% * - Six members changed their vote from “No” to “Yes” after LB67 closed. John Fakatselis & Srinivas Kandala

Technical comments Number of Technical comments: March 2004 Technical comments Number of Technical comments: Original letter ballot (LB51) – 1173 1st Recirculation ballot (LB59) – 542 2nd Recirculation ballot (LB63) – 243 3rd Recirculation ballot (LB65) – 104 4th Recirculation ballot (LB67) – 56 Number of Technical comments that were part of a “No” vote: Original letter ballot (LB51) – 806 1st Recirculation ballot (LB59) – 327 2nd Recirculation ballot (LB63) – 121 3rd Recirculation ballot (LB65) – 50 4th Recirculation ballot (LB67) – 6 Outstanding Technical comments that were part of a “No” vote: Carried over from original letter ballot (LB51) – 2 Carried over from 1st recirculation ballot (LB59) – 12 Carried over from 2nd recirculation ballot (LB63) – 0 Carried over from 3rd recirculation ballot (LB65) – 0 From 4th recirculation ballot (LB67) – 6 John Fakatselis & Srinivas Kandala

Approval rate of the draft March 2004 Approval rate of the draft John Fakatselis & Srinivas Kandala

March 2004 Number of comments John Fakatselis & Srinivas Kandala

Invoking Procedure 10 We request invoking procedure 10. March 2004 Invoking Procedure 10 We request invoking procedure 10. Confirmation (Recirculation) ballot will be held. Expected closing date of the Confirmation ballot: Apr. 15, 2004. Confirmation ballot and resolution meeting will be held on April 19, 2004. John Fakatselis & Srinivas Kandala