EHN1: CE Integration process updating

Slides:



Advertisements
Similar presentations
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
Advertisements

West Contra Costa Unified School District Facilities Subcommittee Meeting March 11, 2014 State School Facility Program Seismic Funding Update.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
John Osborne GS/SE March 2013
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Construction and Installation of the CLIC Experimental Area
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
09 July EHN1 civil engineering project status (JUNE) Summary: Updating of the activities carried out on-site (Done) in JUNE List activities on going.
06 August EHN1 civil engineering project status (JULY) Summary: Updating of the activities carried out on-site (Done) in JULY List activities on.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
EHN1 North Wall Dismantling Schedule Bastien Rae.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
AWAKE E. Gschwendtner, EATM, 1 July Highlights Since April 2015 Cabling, piping and rack installation campaign for the AWAKE facility has started.
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
22 October Summary: Updating of the activities carried out on-site (Done) in SEPTEMBER List activities on going (Next steps) and scheduled for OCTOBER.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016.
EHN1 – EN/EL Progress update J. Devine 25/02/16. Integration – Jura Substation Position updated to avoid clash with door. Meeting next week for Civil.
WP 17.1 Civil Engineering Platform height / vs option Status on M. Manfredi on behalf of WP17.1 team.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
21 January Summary: Updating of the activities carried out on-site (Done) in DEC + ½JAN List activities on going (Next steps) and scheduled till.
10 December Summary: Updating of the activities carried out on-site (Done) in NOVEMBER List activities on going (Next steps) and scheduled for DECEMBER.
WP 17.1 Civil Engineering Point 1 - Networks LS2 COMMITTEE – CERN – Pieter Mattelaer (SMB-DI)
25 June EHN1 civil engineering project status (MAY) Summary: Updating of the activities carried out on-site (Done) in MAY List activities on going.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
ELENA installation progress F. Butin / ELENA collaboration.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
Linac4-PSB 160 MeV connection readiness review
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
CLIC Civil Engineering Update
IT-4337/SMB – Bidders Conference
Schedule CM SPS G.Vandoni.
VENTILATION OF AD TARGET Kick off meeting
Francois and Lau EATM 17 July 2012
EHN1 Extension planning
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
San Luis Potosi – New plant April 24th 2015
INSTALLATION SEQUENCE
CMS Area Working Group Meeting
Budget specification EHN1 Extension: Infrastructure (WG2)
CE Status: Activities executed until 03/08 and ongoing
G. Carboni for the Muon Group
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SR1 cleanroom extension
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
Key Issues CPOC Update February 2011 Second Avenue Subway TBM Drive #1
Minuteman Vocational Technical Regional High School Progress
Mount Vernon Community School
LS1 status 17/03/2014.
Operations, Risks & Hazards
Walker Street Reconstruction Project 25% Design Public Hearing
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
Neutron guide Shielding Concept
Bunker Wall Design Wall ESS
Bunker Project Schedule/Budget
Avera St. Luke’s Therapy Addition January 2012 Update
FASER LS2 work coordination meeting
WP1: Status and Plans Francisco Sanchez Galan (EN-EA-PE)
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

EHN1: CE Integration process updating Martin Manfredi SMB-SE

ROUTING SERVICES ‘EAU INCENDIE’– SALEVE SIDE - TG DONE ROUTING SERVICES ‘EAU INDUSTRIELLE’ AND ‘EAU POMPAGE – JURA SIDE – TG => OK DONE Reference plan submitted by CV have been forwarded to contractor ROUTING SERVICES ‘EAU INCENDIE’– SALEVE SIDE - TG DONE Reference plan submitted by CV have been forwarded to contractor JR: Piquage DN 80 + bride + obturation par plaque pleine communiqué CERN_CV ? TBC TBC JR: Piquage DN 50 + bride + obturation par plaque pleine communiqué

VENTILATION GRILLES: Position to be confirmed by CV DONE Lift up of 400mm ??

CABLE TRAY ON NORTH GABLE: PENDING The possible options of intervention (SMB <-> EL): EL to temporary remove the tray and protect the cables (before mid-July) before the dismantling process start --> Our contractor remove the entire surface of the wall --> You come back to reposition your cables (after CE handover). EL to permanently remove the tray by fixing the hall cable lighting in the steel beam (like the other axis?) and deviate/cut, after your internal evaluation, the other cables (before mid-July) --> Our contractor remove the entire surface of the wall; Our contractor retains inconvenient or unfeasible to operate even without the tray and we finally conclude to dismantle only the portion below the tray and keep the rest there --> No impact for EL. We will deal with the cables protection during the dismantling process.

GRATING STEPS: DONE

CALE DYNAMOMÉTRIQUE: DONE

Martin Manfredi SMB-SE EHN1: Status CE works Martin Manfredi SMB-SE

Next Steps: Activities scheduled untill end-MARCH 08/03/2016 (1) INSIDE PITS: (A+B) Erection/Installation precast internal walls (209 elements in total). 70% DONE. Currently working on 1st and 2nd level on the PIT B; (2) SLAB SYSTEM: S4, S5 lower slab and drainage complex to be executed. Backfilling process in parallel Execution remaining part of the retaining wall on top of the GHN106 by end-February

Martin Manfredi SMB-SE EHN1: Planning CE works Martin Manfredi SMB-SE

DRAFT : Discussion w/ contractor ongoing Deadlines to be confirmed TRAVAUX CHARPENTE MÉTALLIQUE DRAFT : Discussion w/ contractor ongoing Deadlines to be confirmed 11/08 02/09 16/09 Official building delivery date is 15/08; Delay during WP1 activities led to review WP2 schedule; New planning with delivery date shifted to 16/09 (+4wks); End of North gable dismantling (concrete wall ongoing) End of the CE activities inside the building (outside on going) PARTIAL HANDOVER End of the CE activities outside the building FINAL HANDOVER Partial handover granted from 02/09 , allowing service installation to start inside the building; Thus, 2wks of activities lost between 15/08 --> 02/09; Contractor propose a time window to access the building (15/07 --> 29/07, i.e. 2wks); EHN1 Temporary lighting; Installation of pits’ barrier; Crane cabling (commissioning after 11/08) Start installation of cable trays in the Hall Identification of the activities to be carried out inside the building Issue of access (personnel, material, etc..) to be identified; Crane commissioning potentially possible after 11/08 ; Activities inside the GHN106 can start from 04/04. Proposition for mid-June. Can we create an access on the existing concrete wall ?