8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Machine Coordinators: G. Arduini, J. Wenninger
Wednesday September 14th
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday fill with 1092 bunches (6 h stable beams)
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Summary week 23 Luminosity production
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Thursday morning – optics correction
Monday 6th August & night
LHC Morning Meeting - G. Arduini
Fri 15th – Sun 16th June Friday Saturday Sunday Monday
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Saturday – Morning 7:36 beams dumped
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Summary week 18 Intensity ramp up & production
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
IP8 aperture measurements (07:30-10:30)
Tue/Wed 12/ :00 Probe beam back again
Thursday 26th July 13:21 Fill 2880 beam dumped
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Week 25 Summary Coordinators: Mike Lamont and Barbara Holzer
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Thursday
Saturday 24 September 2011.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Thursday Morning/Afternoon
Wednesday 26 October 2011.
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Wednesday 14:30 Fill 2011 dumped.
Wednesday morning / afternoon
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Tuesday
Presentation transcript:

Friday 15th June 01:11 Injection. 02:42 Stable beams #2733. Initial lumi: 6.7e33cm-2s-1. 08:17 Reached 5.976/6.042 fb-1 (ATLAS/CMS) for 2012. 15:54 Beam dumped, triplet RQX.L2 tripped. Delivered lumi 183 pb-1. 17:00 Drink for 5 fb-1 18:00 Drink for 6 fb-1 17:30 MKI temperatures ok, waiting on EPC and precycle RQX.L2. 19:45 Injection septum is misbehaving, getting FMCM RMSI.R8B2. Injection problems, longitudinal and transverse 22:50 Stable beams #2734. Initial lumi 6.3e33 cm-2s-1 08:45 MKI.8D 4.5 % above temperature interlock level. This fill 150 pb-1 so far… 16/06/2012 LHC 8:30 meeting

15:54 Beam dumped, triplet RQX.L2 tripped The fault was originated by an internal problem on RTQX2.L2, which generated voltage oscillations of the three nested converters. I_ref had a sudden jump; that was probably due to the change of current of RQX2.L2 by -5 A This resulted in orbit oscillations Beam was dumped by fast losses on TCLA.B6L7.B2 The pc tripped by overcurrent inside the RTQX1.L2, after 300 ms N.B. Behaviour of the PC (and protections) correct, apart for the initial current change (which is not clear whether is coming from the PC.) the subconverter 3 of RTQX2.L2 went probably in short-circuit 16/06/2012 LHC 8:30 meeting

PC behavior 16/06/2012 LHC 8:30 meeting

New Filling Scheme 6 bunches for first injection BSRT emittances at 600 GeV, B1 BSRT in squeeze: B1 looks ok again… 16/06/2012 LHC 8:30 meeting

Injection not smooth Longitudinal and transverse problems with beams from SPS Problems with longitudinal blow-up during the ramp Resulting in lower peak luminosities and possibly more heating of the MKI during the fill 16/06/2012 LHC 8:30 meeting

Injection kicker MKI temperatures After increase of temperature thresholds on Thursday evening, MKI.8D is the limiting temperature which cannot be further increased as a reduced kick strength (faster rise time) has been measured for this magnet Just before beam dump at 15:55 – MKI.8D.DOWN was going down in temp, MKI.8D.UP was flat, but not going down yet. Max temperature 2 % above threshold – this depends on temp at start of stable beams This is after 13 hours of stable beams … Needed to what about 1.5 hours after beam dump before ok – 30 minutes wait. At this moment MKI.8D 4.6 % above threshold… would need a much longer wait MKI.8D UP and Down Temperatures higher than in previous fill. Problem with bunch lengths in ramp... 16/06/2012 LHC 8:30 meeting

Individual bunch lengths at 8:50 this morning Mean bunch length comparison last two fills. Especially B1 is shorter, but we see more heating for B1 and B2…. 16/06/2012 LHC 8:30 meeting

Planning Ahead Delivering luminosity… To be done… RF: Long. blow-up at injection: tried it, to be re-visited after TS New filling scheme (6 non colliding bunches for ATLAS/CMS): In - OK ADT: Pilot for 15min. 6b for 15min. Impact of TETRA on hump / beam: 30 mins at injection with probe bunches. Access: TCLIB.6R2.B1 electronics and LVDT sensor. MAD PM15: motors of inner doors not working (at least 4 hours). BI in Pt4 (3-4 hours, working hours). TOTEM vacuum gauge (3 hours, not urgent). MCBV18.L4B1 and RCO.A12.B1 to be repaired / replaced. LBDS Check/repair Ethernet connection on FEC cfc-ua63-mkdtspm. 1 hour during working hours, N. Magnin. Collimator cooling check TCT IR8 – Oliver Aberle Pt.7 (IMPACT: 18638) to exchange two amplifiers for the diamond BLMs. 2 hours (Ewald). BI: UA43 - lost remote communication with one of our controls front-ends. ½ hour. BI: Q7R4 (RF zone) - install attenuator and temperature probes on the HT- monitor to be retrieved during the next TS. ½ hour. 16/06/2012 LHC 8:30 meeting