TOPIC-8A- PROJECT TIME CONTROL

Slides:



Advertisements
Similar presentations
Project management.
Advertisements

DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Management Information Systems [MOIS470]
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
SWE Introduction to Software Engineering
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 1 Slide 1 Project management.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project Time Management
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
Dr. Godfried Williams1 Project Management – Topic 6 Lecture Content Planning Tools/Techniques Optimization Techniques Resource Planning & Allocation Linear.
Project Monitoring and Control by Hateem Ghafoor, PMP.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
PROJECT PLANNING AND SCHEDULLING
Project Management.
Project management Topic 2 Planning.
1 PROJECT MONITORING & CONTROL. 2 Project Monitoring and Control Why do we monitor? What do we monitor? When to we monitor? How do we monitor?
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
COMP201 Project Management.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
TOPIC-8B- PROJECT COST CONTROL
Time Planning and Control Time-Scaled Network
PROJECT MANAGEMENT.
Procuring Professional Services
Maintenance Scheduling
Establishing and Managing a Schedule Baseline
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Assistant Professor of Computer Science Washington State University
Software Project Management
Project Planning and Scheduling
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
Activity Planning.
Chapter 6: Project Time Management
ENGINEERING MANAGEMENT (GE 404)
MAINTENANCE PLANNING AND SCHEDULING
CHAPTER 6 PROJECT TIME MANAGEMENT
ENGINEERING MANAGEMENT (GE 404)
Project Time Management
Theory, Tools, and Obstacles
Software Project Management
Monitoring and Reporting Project Progress
ENGINEERING MANAGEMENT (GE 404)
ENGINEERING MANAGEMENT (GE 404)
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Time Planning and Control Time-Scaled Network
Project Time Management
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
Project management Lecture 9
Lecture 6: Time-Cost Trade-Offs
ENGINEERING MANAGEMENT (GE 404)
Project Time Management
ARCH 435 PROJECT MANAGEMENT
Project Planning By Phaik San Liew.
Chapter 6 Activity Planning.
Project Time Management
Project Time Management
Chapter 27 Project Scheduling
Chapter 6 Activity Planning.
ENGINEERING MANAGEMENT (GE 404)
Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

TOPIC-8A- PROJECT TIME CONTROL 13 June 2013 Project Time Control GE404 ENGINEERING MANAGEMENT

Control = Monitor + Compare + Analysis + Action Definition: Controlling Control = Monitor + Compare + Analysis + Action Controlling involves making sure that the results achieved are in line with the planned results. The main feature of control is action to correct performance deviations and to insure that expected results are forthcoming.

TOPIC-8A- PROJECT TIME CONTROL 13 June 2013 Project Time Control PURPOSE: The successful attainment of set time objective is the essential purpose of the time-management system. AVAILABLE: An operational plan and a detailed calendar is prepared to: meet project objective and level resource requirements. WHY? No plan can ever be perfect. No planner can anticipate every future circumstances. Problems arise that could not have been foreseen. GE404 ENGINEERING MANAGEMENT

Process of Project Time Control Establish an operational schedule. Measure and report progress (Establish a progress monitoring and information feedback procedure). Compare actual achievement with planned. Check and analyze time progress and determine effect on completion date and milestones. Plan corrective action Bring work back to schedule. Modify schedule. Implement corrective action. Update operational schedule.

Establish Operational Schedule For project control purposes a hierarchy of schedules may be needed, depending on who will use it. Key Dates Schedule For owners and top-level management in terms of MILESTONES or KEY DATES. Detailed Schedule For engineers, work supervisors, material suppliers and subcontractors. A schedule of that particular engineer/supervisor work responsibility. Provide him with a day-to-day forecast of field operations. Critical activities and free float values should be noted. Covers limited time spans (2 weeks or 30 days). Tabular listings and computer-printed bar charts are common forms.

Measure and Report Progress Methods Estimated number of working days req. to complete the activity. Estimated % completion of the activity. Quantities of work units put in place. Equations Working days to complete = d (1 - P/100) Working days to complete = d (1 – (W/T)) Where d= total activity duration in working days P = estimated percentage of completion W= number of work units put into place. T= total number of work units associated with the activity. Based on the assumption of straight-line variation between time and work accomplishment

Measure and Report Progress How often? Balance between management benefits and costs and efforts. To serve other reports benefits such as cost control. According to project characteristics and peculiarities. Weekly Progress reports A common procedure in many industries. Listing those activities that started, finished, or were in progress during the week and indicating their stages of completion. Must include procurement, material delivery information, ….. Chose a cutoff date, to be selected to serve both time management and labor cost accounting.

WEEKLY PROGRESS REPORT Working days to complete Measure and Report Progress WEEKLY PROGRESS REPORT Project: Highway bridge Week ending: Wednesday, July 21 (working day 27) Job. No: 7903-50 Prepared by: K.M. Activity Activity Number Date Started Date Completed Percent Complete Working days to complete A 110 - July 15 100 B 115 13 C 130 80 2 D 150 July15 E 160 July 16 July 21

Measure and Report Progress Field Progress Narrative To accompany weekly progress reporting. Discussion of projected project features. General statement about time status. Critical or low float activities in difficulty. Potential trouble spots. Exceptionally well project areas.

Compare and Analysis of Project Progress Concerned primarily with determining the effect of the latest information on the project completion date and any milestone goals. 1st - A quick and simple check for critical activities status. 2nd - Check the possibility of a new critical path. SIGNS OF DANGER: Activities fall behind LS schedule. Resource availability delays. Realizing that time duration of future activities have been materially underestimated. Change logic becomes necessary.

Corrective Actions When there are small delays that are within network time contingency, no action is usually required. Otherwise use Time Reduction Technique to bring project back on schedule. Make periodic job progress meetings to enhance time management efficiency. Weekly, biweekly, monthly. Project managers, field supervisors, major subcontractors, material suppliers, and owner representative.

Network Updating (Rescheduling) Making necessary network corrections and re-computing activity times and float times. Concerned with determining the effect of schedule deviations and plan changes on the portions of the project yet to be constructed. INFORMATION NEEDED: New activities to be added. Existing activities to be deleted. Changes in the resource availability and delivery dates. Changes in the job logic. New estimate of the time required to finish unfinished activities. Changes in the scope of work. ……………………………….

Example The initial AON diagram for a small engineering project is shown below with its planned activity times in days. At the end of the 15th day, the field progress report gives you the following information: Activity “A” was completed on schedule. Activity “B” started as planned but four days were lost due to waiting for the required resources. Activity “C” was completed one day earlier. The remaining duration of Activity “D” is 2 days. The duration of activity “H” will be reduced to 12 days instead of 17 days. The activity “F” cannot start until the morning of day 22. Activity “Z” is expected to take two days more. Due to owner requirement the volume of work of activity “X” will be increased by 50%. Required: Construct the updated AON diagram, calculate the early and late start times of each activity, and indicate the critical path.

TOPIC-8A- PROJECT TIME CONTROL 13 June 2013 Example GE404 ENGINEERING MANAGEMENT

Example