De-cabling strategy during YETS

Slides:



Advertisements
Similar presentations
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Advertisements

LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
MKE4 Rearrangement -Updated Drawings -Visit to ECA4 -Visit to LSS4 -SPS Safety File -Safety during intervention MKE4 Rearrangement - TCM 25 August
Injector De-cabling Project Project Team Meeting #
Injector De-cabling Project Enlarged meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Injector De-cabling Project Enlarged meeting # E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
Injector De-cabling Project Enlarged project meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Planned activities during (E)YETS… up to LS2 for PSB-PS equipment Etienne CARLIER On behalf of TE/ABT/EC.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
Warm Magnets - LS1 Feedback J. Bauche, on behalf of the TE-MSC-MNC Team.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Survey on “Chargés de Consignation” Status Update
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
YETS & LS2 Works EN-EL / Power distribution
Linac4-PSB 160 MeV connection readiness review
Linac4-PSB 160 MeV connection readiness review
ABT-EC EYETS Activities 2nd reports
PS / Booster septa control
LIU – EVM status and next steps
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
YETS & LS2 Reminder P. Lelong / G. Georgiev / JM Lassausse
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
Identification of the unused cables
EYETS David Hay EN-OSS.
EYETS LHC 2016/2017 Works EN/EL/CF
Injector De-cabling Project
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
Safety in Construction and Upgrade Phases
LIU – EVM status and next steps
EYETS16-17 ACTIVITIES EN-EL-CF
EC Activities Status for the LIU
Buffer Zones - Status Report
YETS & LS2 Reminder G. Girardot 20 juin 2017.
# 56- FIRE PREVENTION (Decision Needed)
TE-ABT Activities for LS2
prepared by R.A.Barlow 30/056/2016
EN-HE SPS works during EYETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Survey on “Chargés de Consignation” Follow-up
SPS activities during LS2 TE-EPC (Power Converter Group)
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
YETS PS + PS SWY + TT2 Facility Coordinator:
EN-HE L2 – PS – PSB – TT2 works during YETS
YETS & LS2 Works EN-EL / Power distribution
Overview & baseline of LS2 and roadmap for CRG
East Hall under construction
GIS Portal Racks Project
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Experimental Areas – LS2 planning
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
Safety in the East Area Renovation Project
SPS 2, 3, 4 and 6 during W D.MCFARLANE EN-ACE-OSS 12/06/2019.
WP1: Status and Plans Francisco Sanchez Galan (EN-EA-PE)
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

De-cabling strategy during YETS 2017-2018 PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meetings Thursday, 28st September 2017 Gérard CUMER on behalf project team

Injectors de-cabling Project De-cabling Project : status August 2017 Master Schedule, Dashboard Decabling interventions during YETS 17-18 (PS Center Ring) Identification campaign TT2 during YETS 17-18 PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017

De-cabling project : Master schedule (August 2017) PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017

Dashboard (August 2017) PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017

Injectors de-cabling Project De-cabling Project : status August 2017 Master Schedule, Dashboard Decabling interventions during YETS 17-18 ( PS Center Ring ) Identification campaign TT2 during YETS 17-18 PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017

De-cabling interventions during YETS 17-18 (PS Center Ring) PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017

PS False Floor consolidation Buildings 353-359–367: no stability issues due to false floor  requested consolidation due to and accident on 18th May 2017 (A2_6806602 EDMS1813453). This works are not required for the de-cabling project of PSCR and SMB can carry them out independently. Building 368: False floor will be reinforced with the same tripod type already installed in PSB in order to assure a permanent stability. PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017

Works classification and Responsible Unit The works for the removal of obsolete cables have been classified as electrical nature in application of the Norm NF 18-510 (EDMS Memorandum: 1686597) Complying with GSI-WS-1, EN-EL is the responsible unit for: All the VIC’s must be organized by EN-EL The necessary lock outs for this works must be requested by EN-EL The removal of the obsolete cables will be carried out by the COMSA company from EN-EL, with electrician professionals authorised H1-B1 + a work supervisor certified H2-B2 PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017

Lock-out organization The Project Team has proposed and approved the equipment that necessarily needs to be kept powered in order to assure the safety of workers The works for the cable removal require: The Lock-out Standard and systematic of PS (EPC-ABT) The supplementary and specific lock-out (racks, power RF, Tablx BT, UPS…) The temporary power supply for the basic needs (vide, star-points…) The works for the cables’ removal are framed by 2 VICs, one at the beginning and one at the end of the work. Signatures and formal exchanges of forms for lock-out certificates (first or second stage) during the VICs. The group leaders (owners of each installation/equipment), previously notified through the Memorandum EDMS 1686597, are named lock-out responsible for their equipment. PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017

Organization of the project & Safety Project Group Link Person and Lock out responsible Updating process from the groups in progress PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017

De-cabling during YETS 17-18 (PS Center Ring) Duration Planning 3 days for Lockout and False floor consolidation (20,21 & 22/12/2017) Surface + galleries (without Ovoid 8) 30 working days needed Ovoid 8 (in parallel with surface): 27 working days needed Pulling 30 cables LIU: 5 working days needed (intervention period TBD) Specific lock-out for decabling project from 20/01  15/02 First Draft The calculations are based on the gained experience in PSB (works in 2 shifts). PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017

De-cabling during YETS 17-18 (PS Center Ring) Test Génératrice PS PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017

Injectors de-cabling Project De-cabling Project : status August 2017 Master Schedule, Dashboard Decabling interventions during YETS 17-18 ( PS Center Ring ) Identification campaign TT2 during YETS 17-18 PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017

Organization of the project & Safety Procédure identification câbles obsolètes Similar procedure draft for the TT2 PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017

Identification process TT2 YETS 2017-2018 GROUPES + EL + ACE : Recherches, identifications sur site Déconnections, repérages violet tests Renseignements dans SharePoint EN/ACE Réaffectation de câbles entre les groupes Réaffectation de câbles dans autres Zones du PS autres zones du PS TT2 (EN/ACE) Stockage des fichiers dans SharePoint Futures campagnes de dé-câblages CES (en service) Importation des câbles en service dans la BD GESMAR DOV (à déposer) Déposés pendant ce YETS DEC’s Autres câbles trouvés coupés ou déconnectés avec ou sans numéro PT (pas trouvés – déjà déposés dans le passé depuis 1960… ) 2017 Cablothèque GESMAR Papier V1 Papier V2 Cablothèques numérisées en Excel importées Cablothèques après 1989 sous format Excel – DEC avant 1989 macro Analyse par les Groupes MASTER FILE sous Share-point Identification, repérages, déconnexions Renseignements BD par les groupes Identification process TT2 Transmis aux groupes Analyse en cours PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017

TT2 & Building 269Y PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017

Summary Procedures and methodologies are similar to the previously applied during EYETS 16-17 De-cabling works at the PS Centre Ring is not linked to the false floor consolidation (contrary to PSB) Standard Lock-out for the PS machine and supplementary lock-outs required for de-cabling works: lock-out responsible (chargé de consignation) for the 14 groups involved. Decabling works at PS Centre Ring are classified ALARA 1 Building 359: Identified coactivity with maintenance works (TE-ABT and EN-CV) and false floor consolidation works (SMB) The TT2 identification campaign will entail cable investigation out of TT2 and Building 269 such as AD, nTOF and SPS. The cable analysis from the cablotheque has already started PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017

…..Questions? Thanks for your attention PSB/PS/TT2/Linac2-3 YETS 17–18 & LS2 - Gerard Cumer & Lucia Maricalva - 28th September 2017