THE RECP ASSESSMENT Brent Goliath NATIONAL CLEANER PRODUCTION CENTRE

Slides:



Advertisements
Similar presentations
Renewables (CHP), Global Warming, and Energy Efficiency Richard Brent Solar Government Affairs Lake Tahoe, California July 28, 2005 California Manufacturers.
Advertisements

Energy Saving Options Electricity.
3RD GLOBAL NETWORKING CONFRENCE ENERGY AND RECP CASE STUDY IN KAKIRA SUGAR IN UGANDA Presented By: Ludigo James Uganda Cleaner Production Centre
Optimisation of Inlet Guide Vanes (IGV) Low Pressure Compressed Air Blower Number 5 1.
Make the most of your energy Head Office – Case Study.
Heat Recovery for Commercial Buildings
Facility Energy Efficiency Switch it Off - Turn it Down - Reuse it Jon Barker CEng MEI Chartered Energy Engineer Enerjon
Summary of Heat Loss Calculations Assessing overall heating requirements for building (E) Component U-ValueAreaHeat Loss Rate (W o C -1 ) Walls U walls.
Indiana’s Clean Energy Credit Program (Energy Efficiency & Renewable Energy Set-aside) Roger Letterman Sr. Environmental Manager Office of Air Quality.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Cleaner Production Assessment (Chapter 4)
Tomas Pivoras - CP assessment "Vernitas"1 Case Study Textile company Cleaner Production Assessment Tomas Pivoras Kaunas University of Technology Kaunas,
RETScreen® Energy Efficiency Projects
1 Vapour compression cycle Refrigerator Air conditioning plant Heat pump (“ ENERGY MANAGEMENT HANDBOOK” Sixth Edition, Chapter 8)
Energy Efficiency Methodology
Management and Organisation of Electricity Use Variable Speed Drives Belgrade November 2003.
GMIC Site Assessment Case Study 1. Company Description Mid-Sized Manufacture Materials: – Steel – Aluminum – Various wood products – Some Plastics Processes:
Cogeneration.
Slides 4- Energy analysis ENERGY ANALYSIS. Slides 4 – Energy analysis Structure of a company's energy system SupplyConversionDistributionConsumption Heat.
1 Kevin Cope Imperial College London Head of Building Operations Carbon Management Plans - achievements, maintenance and the future.
This document was specifically prepared to aid utility account managers who are working with C&I customers. Any other use of this material (in whole or.
This project has been assisted by the New South Wales Government through its Energy Efficiency Training Program Prepared by Energy Efficiency through Product.
Energy Efficiency in Serbian Industry – Implementation of Cleaner Production Cleaner Production Centre of Serbia Faculty of Technology and Metallurgy,
Presented by the Industrial Energy Efficiency Project.
Hawke’s Bay Refrigeration
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Surat Textile Cluster Surat, Gujarat State.
CLEAN ENERGY WORKS Transforming lives and communities by transforming homes.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
Albert Young – University of Glasgow Allan Crooks – Carbon Trust Case Studies.
1 DOE Data Center Energy Efficiency Program and Tool Strategy Paul Scheihing U.S. Department of Energy Office of Energy Efficiency and Renewable Energy.
Reducing Waste and Energy Consumption Neil Evan Peterson Advisor: Paul Pagel.
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
Smartcool Systems Inc. Providing effective and reliable energy efficiency solutions for HVAC-R customers around the globe.
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
Retrocommissioning Program UBS 677 Washington Blvd, Stamford, CT.
Resource efficiency and cleaner production: Measurable advantages Ndivhuho Raphulu.
ELECTRICITY COST OF CHILLER AND COOLING TOWER PUMPS KILLING YOU? We Have The RIGHT Solution just for YOU! + =
Energy Consumption Calculations Group 4a. Contents 1.Introduction 2.Methods 3.Tools 4.Country specific variations a.Finland b.Other Nordic countries c.Italy.
PNW RoofTop Unit Working Group - RTUG – RTU Savings Research Project Phase 3 December 15, 2009.
Program Name or Ancillary Texteere.energy.gov Three-Day Compressed Air Energy Saving Assessment Kelly Kissock Director: University of Dayton Industrial.
Energy Auditing – Energy Conservation and Efficiency Measures PRESENTER Mr. A. Hamukale BENG, Meng,MBA,PEEIZ,REng.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
Kaeser Compressors, Inc.
1 Workshop “Energy Efficiency management in chemical Industry sector" Thessaloniki, Greece Use of CARE +Tools in Bulgaria energy management.
Progressive Energy, Environment, & Sustainability Summit 17 Denver, CO Compressed Air - What a Waste! Presented by: September 17, 2013.
THE NELSON INSTITUTE CARBON FOOTPRINT PROJECT AASHE Conference November 11, 2008 Damon Clark Summit Blue Consulting Jeannette LeBoyer Econergy.
Enhancing The Efficiency Of New And Existing Cooling Systems Dr Robert Lamb CEng FInstR Group Sales & Marketing Director Star Refrigeration Ltd.
1 Energy Solutions for Production Supported by: The sole responsibility for the content of this presentation lies with the authors. It does not necessarily.
© INTECHNICA Energy efficiency assessment Systematic Approach to Green Production Energy Efficiency Assessment Supported by: The sole responsibility.
Dušan Petráš ENERGY AUDITING AND CERTIFICATION OF BUILDINGS IN SLOVAK REPUBLIC Slovak University of Technology in Bratislava, Faculty of Civil Engineering,
Robert Greenwald, P.Eng, MBA February 26, 2004
Utility Bills Reduction by Energy Consumption Management
RECP Clubs: resource materials
Seminar On Energy Audit Submitted To: Submitted By:
Prof. Khashimov Aripdjan Adilovich
Lecture Objectives: Continue with air-conditioning (psychrometric)
Recommended Strategy for an Integrated National Approach to EE
DOE Data Center Energy Efficiency Program and Tool Strategy
Arcelor Mittal Vanderbijlpark Industrial Energy Efficiency
3E Plus Program Software Insulation Thickness Calculator
Kaeser Compressors, Inc.
Thembi Kodisang-Sibanda
RECP Advanced course Zubeida Zwavel
Thank you for the opportunity to present our energy efficient product
The Benefit of Including Energy Recovery System Analysis
Energy Saving Concepts and Opportunities in Foundry (A case Study)
Heating, Ventilation and Air Conditioning HVAC
Energy Management Introduction Rantharu Attanayake BSc. (Eng), MSc, MBA EE – Energy Management Mobile :
Presentation transcript:

THE RECP ASSESSMENT Brent Goliath NATIONAL CLEANER PRODUCTION CENTRE SOUTH AFRICA THE RECP ASSESSMENT Brent Goliath @NCPC_SA

Resource Efficiency Cleaner Production (RECP) Assessment Methodology

Planning & Organising - PVQ Information

Planning & Organising - PVQ Information (Cont.)

Pre-Assessment - Potential Savings Opportunities Cooling water pump: 5 – 10% reduction in overall speed of motor. 5 – 20% reduction in motor power consumption. HVAC Fans: 25 – 35% reduction in power draw at low fan flow compared to damper control. Air leaks: Compressed air used for cleaning and hand drying. Reduce load/unload pressure. Evaluate VSD for compressors and remove load/unload cycle. Recover heat of compression. Change compressor type.

Pre-Assessment – Process Flow Diagram

Detailed Assessment - Energy Balance

Electrical Consumption By Department/Area Detailed Assessment Electrical Consumption By Department/Area

Electricity Balance By Process Detailed Assessment Electricity Balance By Process

Detailed Assessment – Transformer Graph

Detailed Assessment - Graphical Representation of Analysed Data

Detailed Assessment - Detailed Analysis of Company Data

Detailed Assessment - Evidence of Findings Uninsulated lines (m) Loss W / m Total loss kW Steam tonne / annum Cost / Insulation Cost / m Total Cost 25mm line (1'') 60 650.0 39.0 442.6 R 91,776 R 1,200 R 72,000 50mm line (2'') 7 4.6 51.6 R 10,707 R 1,600 R 11,200 75mm line (3'')   1,000.0 0.0 R 0 R 2,000 100mm line (4'') 2 1,500.0 3.0 34.0 R 7,060 R 3,000 R 6,000 Subtotal 46.6 528.3 R 109,543 R 89,200 Uninsulated items (Valves / flanges) 55 17.9 202.9 R 42,064 R 110,000 26 8.5 95.9 R 19,885 R 78,000 12 6.0 68.1 R 14,119 R 4,000 R 48,000 R 5,000  Subtotal 32.3 366.9 R 76,069 R 236,000 78.9 895.2 R 185,612 R 325,200

Detailed Assessment – Reducing Waste to Landfill

Detailed Assessment – Recommended Savings – The Basic Reporting Requirements Recommended savings should include a short description or context of the RECP opportunity Should include basic operating parameters of the equipment or department etc. A picture, graph or diagram to provide evidence and more context A very brief calculation to confirm the kL, tons, kWh and Rand savings Key Information that is linked to the Savings Opportunity Table are:- RECP Opportunity Description Annualised kWh Savings Annualised Rand Savings CO2 Emissions Reduction Annualised kL Water Savings Annualised Rand Savings for Water Annualised Ton Waste Saved Annualised Rand Saved for Waste etc

Detailed Assessment – Action Plan for Implementation

THANK YOU Brent Goliath NATIONAL CLEANER PRODUCTION CENTRE SOUTH AFRICA THANK YOU Brent Goliath @NCPC_SA