PCB Design and Construction

Slides:



Advertisements
Similar presentations
1 Calorimeter Trigger to L1-Board data transmission Umberto Marconi INFN Bologna.
Advertisements

MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
Performed by: Gadit Ben-Habib Dan Porat Instructor: Inna Rivkin המעבדה למערכות ספרתיות מהירות High speed digital systems laboratory.
Performed by: Farid Ghanayem & Jihad Zahdeh Instructor: Ina Rivkin המעבדה למערכות ספרתיות מהירות High speed digital systems laboratory הטכניון - מכון טכנולוגי.
Molly, Gwyn, Sam, and Eric.  Do we need mounting holes for the main PCB? How many?  What are our options for heat sinking converters? Should we use.
Students: Nir Engelberg Ezequiel Hadid Supervisor: Mony Orbach In association with: September 28, Winter 2005.
Characterization Presentation Spring 2006 Implementation of generic interface To electronic components via USB2 Connection Supervisor Daniel Alkalay System.
Students: Asulin Ofir Heller Itai Supervisor: Mony Orbach In association with: June 16, summer 2006.
CROSSBAR LAN TEAM 8 CURTIS PETE D. ERIC ANDERSON DANIEL HYINK JOHN MUFARRIGE.
WALTA DAQ. Input 4 BNC Connections for PM signal GPS Connection for Time Signal Serial port for programming.
Khaled A. Al-Utaibi  What is Arduino?  Arduino Boards  Arduino Shields  Arduino Uno Hardware.
Circuit Lab. Experiment-3 Operating the function generator and digital oscilloscope.
Controlled Impedance An introduction (No electronics background required)
FPGA-Based Systems Design Flow in Action By: Ramtin Raji Kermani.
 Chasis / System cabinet  A plastic enclosure that contains most of the components of a computer (usually excluding the display, keyboard and mouse)
9th October 2008AIDA FEE progress report P.J.Coleman-Smith 1 AIDA Frontend Electronics progress report. Mezzanine to FEE64 connection. Mezzanine Layout.
-1- Current Telescope Strengths High resolution (~2.5um) Adaptability Ease of use – Currently borrowed by SPS collimator group Weaknesses Small number.
Pot 32x16 channels = 512 Readout a pair of rows on one end and the next pair on the other. Connect the fibers to “SiPM cassettes” in 2 row by 16 channel.
1 Warsaw University of Technology Faculty of Electronics and Information Technology Institute of Electronic Systems HARDWARE SIMULATOR of the high-resolution.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
EduRobotics.com Innovation First unveils a new Educational Construction Kit The new miniature robot controller (right) features the same as the current.
Font 4 Review Digital Feedback System BPM Analogue Processor Digital Processor Feather Kicker Power Amplifier Pick up StriplinesKicker StriplinesBeam.
Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June th 2010, Argonne. 1.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
Understanding Data Acquisition System for N- XYTER.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
Paralleling capacitors to reduce high frequency output voltage ripple
Some of the best books of  &mid= A23D2FC75CD A23D2FC75CD7.
SEABAS DAQ development for T3MAPS Readout Abhijeet Sohni (with – Max Golub, Raymond Mui and Sean Zhu) Fall Quarter 2014.
Test setup 07/08/ Components Labview control application I2C communication FPGA firmware IC board 2.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
Lab instruments ELCT 201 Digital Multimeter Voltage Tester
Testing of ABC  Not to scale! 100nF Edge Sensor wired to A9, A10 ? ABC nF NB graphic is not an exact match with “ABC_Pads_V5.2.pdf”
Charge Measurement Using Commercial Devices Jinyuan Wu, Zonghan Shi For CKM Collaboration. Jan
Electrocardiogram (ECG) application operation Performed By: Ran Geler Mor Levy Instructor:Moshe Porian Project Duration: 2 Semesters Spring 2012 Characterization.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
Bottom half – ch 0-5 placed & routed FE PS PROC FIFO TRIG OSC RX/SHAP ADC DAC VME.
Prestenters : Ehab Shakour Gaby Shakour Instructor : Moni Orbach.
P08311: FPGA Based multi-purpose driver / data acquisition system Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Andrew FitzgeraldCEProject Manager/FPGA.
Status report 2010/9/24 Atsushi Nukariya. GEMFE2 outline (1) ・ FPGA controls 4 chips. ・ Each chip has 9 channels. ( 8 channels will be used in data acquisition,
Supervisor : Evgeniy Kuksin Hanna Abo Hanna Alaa Mozalbat 32CH BEAM-FORMER FOR MEDICAL ULTRASOUND SCANNER.
Mircea Bogdan Chicago, Oct. 09, BIT, 500 MHz ADC Module for the KOTO Experiment The University of Chicago.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
User Manual FIBER OPTIC 2Ch Video LINK Fiber Optic 2Ch Video Link.
32ch Beam-Former for Medical Ultrasound Scanner Performed by : Alaa Mozlbat, Hanna Abo Hanna. Instructor : Evgeniy Kuksin.
E. Hazen - CMS Electronics Week
LHCb Outer Tracker Electronics 40MHz Upgrade
Development of T3Maps adapter boards
Adapter Board Design Changes
UMAC 구성예 (1) ▪ CPU (w/ WD Board) - Ethernet (TCP/IP)
Iwaki System Readout Board User’s Guide
Introduction to Handshaking Communication with SSC-32U
USB Pixel 3D System Update I-Beam Simulation
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
T3MAPS Summer Update Yedi Luo & Raymond Mui 1.
T3MAPS Summer Final Report
Hans Krüger, University of Bonn
HCAL Data Concentrator Production Status
SEABAS/EUTelescope Integration Idea
FMC adapter status Luis Miguel Jara Casas 5/09/2017.
Introduction to Electronics
OPA wiring To Scope EHD V 100K 10K.
PCB Design Preeti Mulage 03/17/2010.
Design of Digital Circuits Lab 8 Supplement: Full System Integration
SALTRO16 activities in Lund
A Time-Digital Converter (TDC)
I have… I have… Who has 3:40? Who has 12:20? I have… I have…
LIU BWS Firmware status
Presentation transcript:

PCB Design and Construction Eric Chung

Quarter Goals: Finish PCB design, send out for manufacturing, and order parts Build and test all the boards Move board designs to Altium+start working on next design Design simple board-to-board adapter card

What actually happened Finish building the cards (except the regulators) Finished testing the SEABAS card Can’t get access to Altium Working on board to board adapter 3.3V regulator card not working Started reading through High-Speed Digital Design book

Finalizing board design

Building the Cards 2V regulator card 3.3V regulator card SEABAS/T3MAPS adapter card

Testing SEABAS adapter card Tested all channels’ outputs at 5MHz with BNC probe Tested channel 7 at 5, 10, 20, and 30MHz with BNC probe Tested channel 7 and channel 1 at 1, 10, 30 MHz with TEK probe Ch. 0 output @ 5MHz with BNC probe

Tests with TEK probe Ch7 output @ 1MHz Ch7 output @ 10MHz

Tests with TEK probe Ch7 output @ 30MHz

Board-to-board adapter Connects Atlys FPGA to Multi I/O

Next Steps Working on next design for adapter cards Troubleshooting problems with regulator cards Working through High-Speed Digital Design book