Comments on the DAQv2 advancement

Slides:



Advertisements
Similar presentations
Julie Prast, DHCAL Meeting, 24 janvier 2008 La carte DIF pour DHCAL (proto au m 2 et au m 3 ) Sebastien Cap, Julie Prast ( LAPP) Christophe Combaret (IPNL)
Advertisements

Contrib passées & à venir du LLR (pour toi, à modifier)‏ VFE DAQ sur EUDET ( ): [C. Jauffret, V. Boudry] test du HardROC.
Vincent Boudry Franck Gastaldi Antoine Matthieu David Decotigny CALICE meeting 19 feb Kyungpook Nat'l U., Daegu, Korea Status of the Data Concentrator.
Clock module for TB spring 2012 Uli Schäfer 1 R.Degele, P.Kiese, U.Schäfer, A.Welker Mainz.
Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development 1 Front-End-Electronics for ILC Calorimeter Development G. Blanchard, P. Gay,
1 Overview of DAQ system DAQ PC LDA ODR Detector Unit DIF CCC Detector Unit DIF Detector Unit DIF Detector Unit DIF Storage Control PC (DOOCS) DAQ PC ODR.
Taikan Suehara, AIDA-2020 kickoff meeting, 3 Jun page 1 Requirements from CALICE-DAQ for WP5 Taikan Suehara (Kyushu University, Japan)
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
Clock module (and other hardware) - questions rather than answers - post Palaiseau / pre DESY nach dem meeting ist vor dem meeting Uli Schäfer 1.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
Taikan Suehara, CALICE DAQ TF, 7 Apr page 1 CALICE DAQ TF meeting Taikan Suehara (Kyushu University, Japan)
Mainz hardware activities - clock module for TB spring R.Degele, P.Kiese,U.Schäfer, A.Welker Mainz Uli Schäfer 1.
CALICE: status of a data acquisition system for the ILC calorimeters Valeria Bartsch, on behalf of CALICE-UK Collaboration.
C. Combaret 14 jan 2010 SDHCAL DAQ status in lyon C. Combaret, for the IPNL team.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
JRA3 DAQ Overview Matt Warren, on behalf of EUDET JRA3 DAQ Groups. Please see the following talks from the JRA3 Parallel Session for more detail: DAQ and.
C. Combaret DIF_GDIF_MDIF_D ASU 6x 24 HR2 ASU USB Hub RPi USB2 DCC SDCC RPi USB 1 hub+Rpi for 4 cassettes 1 DCC for 8 cassettes (1 spare) Trigger.
C. Combaret 11/10/ 2008 Status of the DHCAL m2 software C. Combaret IPNL.
Taikan Suehara, Belgrade, 9 Oct page 1 SiECAL DAQ Taikan Suehara (Kyushu University, Japan)
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 - Data Acquisition Status Report Daniel Haas DPNC Genève Extended SC Meeting 1 Sep 2008.
Monday December DESY1 GDCC news Franck GASTALDI.
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
Maurice Goodrick, Bart Hommels EUDET Annual Meeting, Ecole Polytechnique, Paris EUDET DAQ and DIF DAQ overview DIF requirements and functionality.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
1 On- and near-detector DAQ work for the EUDET calorimeters Valeria Bartsch, on behalf of CALICE-UK Collaboration.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
Taikan Suehara, CALICE meeting at KEK, 20 Apr page 1 Report from CALICE DAQ Task Force Taikan Suehara (Kyushu University, Japan)
14th january 2010 Actual Micromegas USB DAQ ASU and DIF
12/09/2007Julie Prast, LAPP, Annecy1 The DIF Task Force and a focus on the DHCAL DIF Remi Cornat, Bart Hommels, Mathias Reinecke, Julie Prast.
Status of DCC CALICE WEEK University of Manchester September 9, 2008 Franck LLR Polytechnique.
Bart Hommels for the DIF WG Electronics/DAQ for EUDET, DESY DIF status AHCAL, DHCAL, ECAL DIF prototypes Ongoing developments & plans.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
19 Apr 2007DAQ Readiness1 Paul Dauncey. 19 Apr 2007DAQ Readiness2 DAQ hardware layout ? More CRCs New HCAL stage May not be used.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
Vincent Boudry Franck Gastaldi Antoine Matthieu David Decotigny CALICE meeting 19 feb Kyungpook Nat'l U., Daegu, Korea.
Vincent Boudry, Rémi Cornat, Franck Gastaldi, Nicolas Roche, Muriel Cerutti LLR, École polytechnique–CNRS/IN2P3 Guillaume Vouters LAPP, U. de Savoie–CNRS/IN2P3.
Vincent Boudry Rémi Cornat David Decotigny Franck Gastaldi Antoine Matthieu CALICE Week U. of Texas at Arlington 11/03/2010 Recent & future developments.
DHCAL Acquisition with HaRDROC VFE Vincent Boudry LLR – École polytechnique.
Vincent Boudry, Ch. de la Taille LLR, École polytechnique LAL, Orsay EUDET Annual meeting DESY, 29/09/2010 CALICE DAQv2.
Vincent Boudry Matthew Wing EUDET Final Annual meeting DESY, 30/09/2010 JRA3 DAQ Task Status report.
Toward a DAQ for the DHCAL m³ (in Test Beams)
Technical Review: DAQ/Online
CALICE DAQ Task Force Launch meeting
DIF – LDA Command Interface
ILD & Test Beam DAQs session
EUDET Elec/DAQ meeting
CALICE DAQ Developments
Calicoes Calice OnlinE System Frédéric Magniette
Integration of CALICE DAQ in common DAQ
Wing-LDA Timing & performance Beam Interface (BIF)
AHCAL Beam Interface (BIF)
CCS Hardware Test and Commissioning Plan
ECAL Integration / CALICE DAQ task force
AIDA DAQ needs (and other issues)
Status of the DHCAL DIF Detector InterFace Board
Testbeam Timing Issues.
DAQ status and plans DAQ Hardware Moving stage (MIP calibration)
Status of the Data Concentrator Card and the rest of the DAQ
Hall A Compton Electron detector overview
Valeria Bartsch UCL David Decotigny LLR Tao Wu RHUL
CALICE/EUDET Electronics in 2007
The DHCAL DIF Board For the M2 Prototype
UK ECAL Hardware Status
State of developments on Readout interface of European DHCAL
Clock & Control Timing and Link 29 July 2008 Matt Warren Maurice Goodrick, Bart Hommels, Marc Kelly, ABSTRACT: A data acquisition system is described.
Clock & Control Timing and Link 29 July 2008 Matt Warren Maurice Goodrick, Bart Hommels, Marc Kelly, ABSTRACT: A data acquisition system is described.
LIU BWS Firmware status
Presentation transcript:

Comments on the DAQv2 advancement Vincent Boudry LLR, École polytechnique Calice Week 23/09/2010

General comments on DAQv2 – Calice Week, 2010-09-23, Casablanca, date HW status 10 ECAL DIF ready and working; 10 in prod; mat for 40 in total (CAM) DHCAL DIF: 165/170 cards tested & ready (LAPP) AHCAL DIF: in design, prod in NIU → 4 unit CCC: 10 cards ready; 4 in use in 4 labs; 3 more shipped → LLR DCC: 3 prototypes ready; 2 cards being tested → 20 end of october LDA: 20 main board OK 5 v1 + 15 v2 Ethernet mezzanine : ✔ 6 CCC mezzanine; clock OK — Busy & Trigger not yet tested (TBC) 20 HDMI Mezzanine: faulty connectors on 8 → in repair ODR + PC 8 ODR ready ; network card being used instead for debugging 6 PC available: 1 in LLR ; 3 other ready; OS needs to be upgraded BIF: to be developped (part of AIDA) ~ No more basic problem with HW Reliability of HDMI connectors mechanics ? Vincent.Boudry@in2p3.fr General comments on DAQv2 – Calice Week, 2010-09-23, Casablanca, date

General comments on DAQv2 – Calice Week, 2010-09-23, Casablanca, date HW status 10 ECAL DIF ready and working; 10 in prod; mat for 40 in total (CAM) DHCAL DIF: 165/170 cards tested & ready (LAPP) AHCAL DIF: in design, prod in NIU → 4 unit CCC: 10 cards ready; 4 in use in 4 labs; 3 more shipped → LLR DCC: 3 prototypes ready; 2 cards being tested → 20 end of october LDA: 20 main board OK 5 v1 + 15 v2 Ethernet mezzanine : ✔ 6 CCC mezzanine; clock OK — Busy & Trigger not yet tested (TBC) 20 HDMI Mezzanine: faulty connectors on 8 → in repair ODR + PC 8 ODR ready ; network card being used instead for debugging 6 PC available: 1 in LLR ; 3 other ready; OS needs to be upgraded BIF: to be developped (part of AIDA) ~ No more basic problem with HW Reliability of HDMI connectors mechanics ? Vincent.Boudry@in2p3.fr General comments on DAQv2 – Calice Week, 2010-09-23, Casablanca, date

General comments on DAQv2 – Calice Week, 2010-09-23, Casablanca, date FW status LDA+CCC comm (M.Warren) Reuse MUX from DCC (FG) LDA DCC DIF's Ethernet ✔ at full speed CCC Clk; Trig; Busy Nlinks up 7/10 conn. no MUX 9 1 Fast Commands ✔ Block transfert Data1) ✔ (< 50 MHz) ✔ (<50 MHz) ROC Structure ✔ Adapt SDHCAL USB Code on going... Simple but critical FW have been advancing rather fast during the last months effort on going (⊃ in UK) → MW, MW & BH at LLR on 28th of July G.V. → integration of ROC management in DIF started but needs finalisation Many progresses recently End of October for first full minimal usable chain ? Vincent.Boudry@in2p3.fr General comments on DAQv2 – Calice Week, 2010-09-23, Casablanca, date

General comments on DAQv2 – Calice Week, 2010-09-23, Casablanca, date SW status Many progress XDAQ (L. Mirabito, Ch. Combaret) “critical part“ complete: Writing of LCIO data in RAW format versatile online analysis framework (root histos) DAQ2 interface ←→ XDAQ being worked on (D. Decotigny, G. Vouters) Missing utilities Semi-automatic noisy channels spotting & correcting (moniting) ←←← Clean Slow control interface to CondDB; event display (most probly DRUID) interface to the GRID interface to the machine Analysis environment (IPNL) rec. data format in LCIO ~ ✔ ✔ ~ ✔ × × × × × ~ USB ✔ DAQv2 × × ✔ ✔ Vincent.Boudry@in2p3.fr General comments on DAQv2 – Calice Week, 2010-09-23, Casablanca, date

General comments on DAQv2 – Calice Week, 2010-09-23, Casablanca, date Installation mechanics mod. VME crate for DCC CCC Special box for LDA Support for cables Final set-up not yet known: stand alone SDHCAL stand alone ECAL Stand alone AHCAL Combined test → 5 m long HDMI cables halogen free; Vincent.Boudry@in2p3.fr General comments on DAQv2 – Calice Week, 2010-09-23, Casablanca, date

General comments on DAQv2 – Calice Week, 2010-09-23, Casablanca, date Plans Critical: Complete the FW → full acquisition chain & check perfs (stability) Trigger logics → M. Warren LDA MUX → F. Gastaldi Finish adaptation of USB FW → DAQv2 FW → G. Vouters Adapt SDHCAL DIF FW → ECAL DIF & AHCAL DIF Complete the SW critical part Integration of DAQv2 in XDAQ → D. Decotigny Continue development SW of utilities Define optimal PC configuration: Stand alone SDHCAL → Combined tests Writing to GRID; interface to beam → L. Mirabito, Ch. Combaret Prepare the set-ups SDHCAL m³ TB Electronics & Cosmic ECAL test bench in LLR μMegas, ECAL & AHCAL TB (to be defined): brute perf to be ×-checked Vincent.Boudry@in2p3.fr General comments on DAQv2 – Calice Week, 2010-09-23, Casablanca, date