Lunch Order Cycle Time Project Storyboard Bahama Bistro Example

Slides:



Advertisements
Similar presentations
A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS / COUNTERMEASURES What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram)
Advertisements

Project Storyboard Template
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
Lean Sigma Overview and its Significance to Project Management Harjit Singh, PMP
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
SEMESTER PROJECT ISE 250: Organizational Improvement Capabilities and Skills Instructor: Dr. Baruch I. Saeed Team Members: Ramachandran Janakiraman Emma.
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
DMAIC Process Storyboard
From Research Prototype to Production
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
1 Project Kick Off Briefing Cost Data Integrity Project August 30, 2007.
8 - 2 Keep hot food hot and cold food cold Prepare food in small batches Measure internal temperatures at least every 2 hours When holding food:
Central Massachusetts Regional Library System Libraries and Lean Thinking An Overview / Workshop May 11, 2009.
A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram) What solutions.
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Project to Improve Help Desk Call Response Lean Six Sigma Green Belt Project.
Analyze Wrap Up and Action Items
Name: Project: March – April 2017
TM 720: Statistical Process Control DMAIC Problem Solving

A Strategy for Achieving World Class Perfor-mance
The DMAIC Method
Lean Six Sigma Road Map Improvement Process Road Map
What Do You Think? Can the temperature gauge on a holding unit be used to check the temperature of the food inside? A. Yes B. No Why? The temperature.
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Nurturing Next Generation Governance Globally
FDFPLSCP4A Manage and schedule production
IENG Lecture 05 Process Tools:
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Continuous Improvement Projects
Problem Solving Sheet Guidelines
Lunch Order Cycle Time Project Storyboard Bahama Bistro Example
Six Sigma DMAIC Improvement Story
Buffalo Trace District Health Department
Name: Project: March – April 2017
Pick-Up Order Lead Time Project Storyboard The Bahama Bistro Sample Storyboard Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Project Management Essentials Connecting PI to PM
A Road Map to Food Safety
Food Prep & Service Process
Visit GoLeanSixSigma.com for More Lean Six Sigma Resources!
Green Belt Project Storyboard
Lean Six Sigma DMAIC Improvement Story
DMAIC Project Template
OPS/571 Operations Management
3.2.2 Managing stock and quality
OPS 571 GENIUS Lessons in Excellence-- ops571genius.com.
OPS 571 GENIUS Perfect Education/ ops571genius.com.
Black Belt Project Storyboard
Lean Six Sigma DMAIC Improvement Story
Quality Management Six Sigma
Framework for Success: DMAIC
Green Belt Project Storyboard
Lean Six Sigma Project Name: Project: Date: Intros Expecations
and its applications to improve animal welfare during transportation
Instructor Notes The job of protecting food continues even after it has been prepared and cooked properly, since microorganisms can still contaminate food.
Project Management Training
Green Belt Project Storyboard
Green Belt Project Storyboard
Arrestee Food Prep & Service Process
OPS 571 HELP Dreams Come True / ops571help.com. OPS 571 Assignment Critical Path FOR MORE CLASSES VISIT a.Observe the critical path.
Presented by Joe Ellers
Lean-Green belt six sigma program
Task Board Monitoring Cards
Presentation transcript:

Lunch Order Cycle Time Project Storyboard Bahama Bistro Example Visit GoLeanSixSigma.com for more Lean Six Sigma Resources

Executive Summary

Key Words (Specific to Bahama Bistro) Order Lead Time: Total cycle time from the moment the customer places their order to the moment they receive their food. Lunch Time: Key lunch ordering hours from 11am to 2pm Customers: Business people and vacationers Packaging Process: All tasks related to placing food into take-out containers, selecting utensils, napkins and condiments and then placing them all into a bag Stock Items: All raw food items and food packaging items Condiments: Mini-bottles of hot sauce, limes, salt and pepper

Project Charter

VOC Translation Matrix Key Take Away: Project needs to address overall Lead time which will impact customer wait time as well as food temperature

SIPOC – Lunch Order to Delivery Key Take Away: The scope of this project goes from the point of receiving the lunch order to the point at which food is delivered or picked up

Data Collection Plan Key Take Away: Data collection was spread out among the staff and covered a 6-week period – Back-up help was provided for kitchen staff

Baseline Data –Lead Time Order Lead Time Sandwich Order Lead Time Key Take Away: The baseline shows that for many orders, both the Order Lead Time and the Sandwich Order Lead time were well beyond the requirement.

Fishbone Diagram Key Take Away: Initial brainstorming indicates that packaging and wait staff might be potential root causes

5 Whys Key Take Away: Root Cause Analysis will focus on verifying how much packing layout and wait staff habits are impacting Order Lean Time

Hypothesis Confirmations Histogram of Sandwich Prep Time Histogram of Cooking Time Key Take Away: Data shows sandwich prep takes up to 13 min., cook times are <20 min., prep area is issue & servers don’t delay orders

Impact Effort Matrix Key Take Away: The team left condiments out of the pick-up orders, switched vendors, labeled the bins and studied X-training options

Before & After Time Data Order Lead Time – Before and After Sandwich Order Lead Time – Before and After Key Take Away: Implemented solutions significantly decreased both Sandwich and Order Lead Time

Risk Management Key Take Away: Having the vendor call to confirm quantities would lead to lower risk of running out of key menu items

Control Plan Key Take Away: The team chose a mix of process and output measure to monitor going forward

Monitoring & Response Plan VO – The Monitoring plan should be meaningful and manageable. Collecting too many measure for a monitoring plan may discourage employees from doing it. Key Take Away: The monitoring plan factors in both the leading indicators of packaging and prep time along with the project “Y” of Order Lead Time