CALICE News The 2007 beam tests have started!

Slides:



Advertisements
Similar presentations
The CALICE test beam at CERN Fabrizio Salvatore Royal Holloway University of London (on behalf of the Calice Collaboration) SPSC meeting, CERN, Geneva,
Advertisements

1 Calice UK Analysis Meeting 23/1/07David Ward Cambridge data analysis work David Ward Main focus – data-MC comparisons Using “official” reconstructed.
17 Sep 2009Paul Dauncey1 US DHCAL integration with CALICE DAQ Paul Dauncey.
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
31 May 2007LCWS R&D Review - Summary1 WWS Calorimetry R&D Review: CALICE Wrap-up Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
3 Nov 2006News - Paul Dauncey1 The 2006 beam tests have finished! DESY in May, CERN in Jul-Oct Many tens of millions of events and many TBytes of data.
20 Sep 2007Paul Dauncey1 CALICE beam tests Fantastically successful beam test at CERN this summer Yoshi will give a report on this shortly UK easily pulled.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
Calorimeter Test Beam Requirements for ILC Detectors Andy White University of Texas at Arlington LCWS08, Chicago, November 2008.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
The Scintillator-ECAL 2 nd Prototype S. Uozumi (Kobe) Jun
1. 2  42 people for the meeting is nice and it shows how spirited active we are.  It shows to the outside world the level of activities  Everybody.
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
CALICE Collaboration Meeting March 2013 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Hamburg/Germany March 2013.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay ACFA/GDE Wordshop – TILC '08 Sendai Japan - Mar
Technical Review: DAQ/Online
Jan 2016 Solar Lunar Data.
Test beams future plans - Discussion session-
CALICE Silicon ECal Sensors Status and prospects
CALICE Oversight Committee
Introductory remarks David Ward
CALICE(-UK) Status Paul Dauncey 28 Apr 2004 Paul Dauncey.
LC Test Beam Activities
Preparation for CERN test beam
Status of Ecal(s) for ILD
(My personal) CALICE Report
Report from the Technical Board
C. de La Taille IN2P3/LAL Orsay
ScECAL+AHCAL+TCMT Combined Beam FNAL
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Post CALICE thoughts Paul Dauncey 28 Apr 2004 Paul Dauncey.
2017 Jan Sun Mon Tue Wed Thu Fri Sat
Technical Board – DCAL Software
Rick Salcido Northern Illinois University For CALICE Collaboration
Jan Sun Mon Tue Wed Thu Fri Sat
CALICE: News Since May Paul Dauncey Three main items: Beam test status
CALICE: Major Items Since September
Michele Faucci Giannelli
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Proposal Organisation
Calice Tile-HCal and Tail-catcher/Muon Tracker
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Upcoming CALICE meetings
Rick Salcido Northern Illinois University For CALICE Collaboration
Presentation transcript:

CALICE News The 2007 beam tests have started! The Japanese scintillator-tungsten ECAL (SCECAL) Completed data-taking at DESY during Feb/Mar Almost 1000 runs (not sure how many useful beam events) Used AHCAL DAQ and s/w so can be analysed by everyone Returning equipment to Japan; will take more data there… …if we can spare a CRC from CERN activities US DHCAL “slice test” scheduled for FNAL in Jun Eight layers, ~100cm2 area/layer Will use same DAQ s/w so analysed in same way No prospects of ECAL data-taking at DESY this spring Lack of Si wafers to complete ECAL  27 Mar 2007 News - Paul Dauncey

2007 CERN beam tests The CERN 2007 beam test schedule is now fixed Period 1: Wed 4 Jul – Wed 18 Jul Period 2: Wed 8 Aug – Wed 22 Aug Installation will start in early Jun, straight after LCWS Aim for a period of parasitic muon running from late Jun Keep equipment in beam line throughout Sep in case more beam becomes available UK will again ask for apartment and car for whole period Not yet clear if calorimeters will be complete ECAL in particular may not have all layers ready Technical Board review 19 – 20 Apr at DESY Look at readiness of CERN beam tests (and beyond) 27 Mar 2007 News - Paul Dauncey

2007 FNAL beam tests Move equipment to FNAL in Sep, start running in Oct Initially repeat of CERN setup ECAL, AHCAL, TCMT Lower energy hadrons available than at CERN; down to 1GeV Cross check some energies ~10GeV and above US DHCAL will replace AHCAL when complete Scheduled for early 2008 Repeat program to compare the HCALs Assume run will continue until at least Mar 2008 European DHCAL also now part of CALICE May be ready on similar timescale; exact schedule at FNAL very uncertain 27 Mar 2007 News - Paul Dauncey

Upcoming meetings ILC General CALICE; general collaboration meetings LCWS07 at DESY, 30 May  3 Jun; includes an ILC calorimetry R&D review finishing on 4 Jun Software at LAL, Paris, 2  4 May, with a DAQ s/w meeting on the morning of 2 May CALICE; general collaboration meetings Kobe 10 12 May FNAL ~Oct 2007 Prague now uncertain LCUK LCUK meeting, Fri 13 Apr at RHUL; please register soon! 27 Mar 2007 News - Paul Dauncey