Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
1. Identify Stakeholders 2. Establish the Criteria 3. Identify Potential Sites 4. Initial Screening/ Evaluations & Short List 5. Specific Site Study 6.
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
NIRAV JAYANTIBHAI DHANDHUKIA SHELADIA MIHIRKUMAR KISHORBHAI
"Aviation Safety through International Leadership, Education, and Marketing"
A WORKSHOP ON FINANCIAL MANAGEMENT IN HYDROLOGY PROJECT – PHASE-II Gujarat Water Resources Development Corporation Ltd. GWRDCGANDHINAGAR (GW Component.
Mysore City Corporation Mysore JnNURM. Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW 15 th January 2009 Projects State : Karnataka.
TADIPUDI LIFT IRRIGATION SCHEME
Neotech Institute of technology Department of Civil Engineering
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW December 2008 Projects State : Karnataka City : Mysore.
Specification & Quantities Estimating
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
Aapni Yojna Critical Success Factors in Aapni Yojana with special reference to Community Participation.
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
21 st Sep Election Process July & August
GNSS PROJECT (PHASE-I)
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
ELCITA Update 25 th August Update – Estate Management E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets Under Ground.
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
BID OPENER 1 LOGS IN Dept user/Evaluator Logs in.
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
Workshop Gujarat State Watershed Management Agency (GSWMA) Gujarat State Commissionerate of Rural Development.
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
1 1 Health & Family Welfare Dept, Govt of Gujaratwww.gujhealth.gov.in Rashtriya Swasthya Bima Yojana (RSBY) State Nodal Agency (SNA) Commissionerate of.
UNIT 4 CANAL IRRIGATION. DEFINITION canal usually draw their supplies from rivers.they are not provided with any headwork for diverson of river water.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
Construction of road with Geo-Textiles A presentation by : ER. R.K. KANSAL, Executive Engineer.
Experience of Sardar Sarovar Project, Gujarat
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Karnataka Urban Infrastructure Development & Finance Corporation Working towards better urban living KARNATAKA MUNICIPAL REFORMS PROJECT 1.
Presented by Telangana Retired engineers forum 11.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
Advisor, IDS Cell1 NEGOTIATIONS G.C. Tallur (Former Secretary, PWD) Advisor, IDS Cell Monday, July 11, 2005.
Implementation of Smart Cities mission DAVANAGERE SMART CITY LIMITED
GOVERNMENT OF TELANGANA Irrigation & CAD Department
SPMU Details Sl. No. Post under NHP Name Designation 1.
What is surveying? ☞Surveying is the branch of applied mathematics which deals with measuring and recording of the size and shape of any portion of the.
VENTILATION OF AD TARGET Kick off meeting
Hybrid Power Solution for Road Lighting Application
Drainage Study Sections 30 & 34 for Development of City Wide Stormwater Management Master Plan Prepared for City of Palm Coast, Florida Prepared by March.
Review : Implementation of Smart Cities Mission
Earthwork operations- are those that involve the earth in its natural form, which need to be undertaken before the actual construction of the pavement.
Royal Pointe West Annual General Meeting August 23, 2017
Rashtriya Swasthya Bima Yojana (RSBY)
RIGHT SIDE OF SSP IRRIGATION- The Sardar Sarovar project will provide irrigation facilities to18.45 lac ha. Of land ,covering 3112 villages of 15 district.
Details of SPMU (in position), Staff Strength etc
Review of CADWM Projects Under PMKSY
UGPL INITIATIVE IN SSP Sardar Sarovar (Narmada) Project, Gujarat
FINANCIAL BID OPENING.
A People Serving Profession
REGULATION WORK UNIT – 10 LECTURER IN CIVIL ENGG. GP MEHAM SANDEEP.
Delta Water Supply Project
FINANCIAL BID OPENING.
Commissioners Presentation
PROCEDURES FOR GRANTING OF A PETROLEUM EXPLORATION LICENCE
TECHNICAL EVALUATION.
Presentation transcript:

Sardar Sarovar Narmada Nigam Ltd. CHIEF ENGINEER(CPC) Sardar Sarovar Narmada Nigam Ltd. Gandhinagar DATE-03-07-2017

Under Approval due to Reasons Tender Status as on 03-07-2017 (figures in bracket shows amount in rs. Crores) C. E. On web site In Process Agenda submitted Under Approval due to Reasons Approved After 1/4/2017 Total Approved from 1/4/16 to 31/3/17 Rajkot 2(103) 1(80) 7(409) 10(592) 10(459) Ahmedabad 2(11) Mehsana 1(11) Patan 1(72) 7(114) 8(186) 4(82) Gandhidham 2(143) 1(6) 3(149) 11(821) Ele & Mech 1(12) Dam & Vadodara 3(17) 20(590) NMC 2(120) 5(30) No. (Rs.Cr.) 3(109) 4(272) 18 (551) 27(1075) 53 (2005) Note: Tenders approved from 01/04/10 to 31/03/11 : Rs. 3310 Crores (69 No.) Tenders approved from 01/04/11 to 31/03/12 : Rs. 2693 Crores (71 No.) Tenders approved after 01/04/12 to 31/03/13 : Rs. 1884 Crores (55 No.) Tenders approved after 01/04/13 to 31/03/14 : Rs. 1503 Crores (38 No.) Tenders approved after 01/04/14 to 31/03/15 : Rs. 0856 Crores (14 No.) Tenders approved after 01/04/15 to 31/03/16 : Rs. 2590 Crores (26 No.) Tenders approved after 01/04/16 to 31/03/17 : Rs. 2005Crores (53 No.) Tenders approved after 01/04/17 to 31/03/18 : Rs. 551 Crores (18 No.) Total : Rs.15392 Crores (344 No.)

Tender Process Status as on 03-07-2017 (figures in bracket shows amount in rs. Crores) Rejected & to be reinvited Tech evaluation in process Tech evaluation Comp Financial evaluation in process Financial evaluation Comp (pending due to other reasons) Total Rajkot 2(103) 1(80) 3(183) NMC 2(120) Ahmedabad Mehsana Patan 1(72) Gandhidham 1(55) 1(6) 2(61) Ele & Mech Dam & Vadodra Total Nos. (Rs. Crores) 3(109) 4(272) 8(436)

ce(SBC), RAJKOT. Sr. No. Name Of Work Estimated Cost (Rs.Lacs) Status 1 Constructing Under Ground Pipe Line (Ugpl) Of Bavaliyari Sub Distributory (S.D-3) Offtaking From Hebatpur Distributory (Ld-10-b) At Ch. 3.676 Km Of Vallabhipur Branch Canal Including Operation, Maintenance & Security For Five Years. (Package-4) 8034.74 P&T Minutes of Meeting is awaited 2 Constructing Canal Syphon, Canal Earthwork, Structures, Lining work, Service Road and Gate work for Botad Branch Canal from ch 20.363 to 22.605km passing through Limbadi Bhogavo-II (Vadod) Irrigation Scheme with 5 year O & M period 6367.60 Technical bid Evaluation is under process 3 Constructing Under Ground Pipe Line(UGPL) of Kamatalav Distributary (LD-4B) from Ch 20.976 Km to 29.750 Km & it’s 02 Minors offtaking @ ch 64.795 Km of Vallabhipur Branch Canal and Ambli sub Distributary (LD-4B1) from Ch 11.020 Km to 16.290 Km & it’s 03 Minors off taking from Kamatalav Distributary Offtaking @ Ch. 13.765 Km with operation, Maintenance and Security for 5 Years 3924.30

Ce(Main canal), Gandhinagar. Sr. No. Name Of Work Estimated Cost (Rs.Lacs) Status 1 Strengthening of 3.50 m wide WBM Road on Inspection Path by providing surface treatment of Narmada Main Canal ch.0.00 km to 184.926 km including 5 years Maintenance of the work. 4280.88 Agenda submitted to CS for P&T Committee approval 2 Strengthening of 3.50 m wide WBM Road on Inspection Path by providing surface treatment of Narmada Main Canal ch. 184.926 km to 458.318 km including 5 years Maintenance of the work. 7691.54

Estimated Cost (Rs.Lacs) CE(Patan) Patan Sr. No. Name Of Work Estimated Cost (Rs.Lacs) Status 1 Providing Flexible Pavement (BITUMINEOUS SURFACE) on Service Road and WBM road on IP side and Surface drains and cross drains, kundi etc,of Kachchh Branch Canal reach CH. 0.0 KM TO CH. 82.30 KM. Including O & M for 5 Years. 7368.36 P&T Minutes of Meeting is awaited

CE(KBC) Gandhidham 5472.68 639.79 8576.33 Sr. No. Name Of Work Estimated Cost (Rs.Lacs) Status 1 Construction Of CAD [Distributories /Direct Minors Including Its Minors (UGPL) And Sub Minors (UGPL)] Offtaking From Wandhia Sub Branch Canal Including O & M For Five(5) Years. 5472.68 Tender is Re-invited & uploaded on Dt-07-06-2017 2 Constructing Rcc Box Type Canal Syphon By Cut Push Method For Drain, National Highway-41 And Water Supply Pipeline Crossing The Wandhiya Sub Branch Canal @ Ch. 10.158 Km & National Highway -27 Crossing Gagodhar Sub Branch Canal @ Ch.49.147 Km 639.79 3 Construction of CAD (Distributary including its Minors (UGPL) and Sub Minors (UGPL) of various Distributaries off taking from Kachchh Branch Canal between Ch. 189.977 Km to 243.839 Km including operation & Maintenance work for 5 years (Package- I) 8576.33 Tender is uploaded on Dt-09-06-2017