Construction Project Management

Slides:



Advertisements
Similar presentations
Construction Project management Prepared by: Muath Saadeh Saadeh Abu-Sa’da Kamel Beshara.
Advertisements

AN-NAJAH NATIONAL UNIVERSITY FUCULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT GRADUATION PROJECT CONSTRUCTION PROJECT MANAGEMENT (Value Engineering)
Key Concepts: Definition of a Project Characteristics of a Project
1 Assessment of learning outcome via design project Subject: CSE362 Design of Concrete Structures by Lam Siu Shu Eddie Department of Civil and Structural.
Civil engineering department Graduation project (part 1)
AN-NAJAH NATIONAL UNIVERSITY
An-Najah National University Faculaty Of Engineering Civil Department Construction PROJECT MANAGEMENT CONSTRUCTION PROJECT MANAGEMENT Prepared by: sameh.
Project What is a project
IT Project Management, Third Edition Chapter 11 Chapter 1: Introduction to Project Management.
Cost Implications of Architectural Design Variables Ahmed S. Al Zahrani December 2005 King Fahd University of Petroleum & Minerals Department of Construction.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Project Management Education
Chapter 1 Professional Architectural Careers, Office Practices, and Opportunities.
An-Najah National University Engineering Faculty Civil Engineering Department Submitted in partial fulfillment of construction project management for the.
Structural Analysis and Design of
Specification & Quantities Estimating
Construction PROJECT MANAGEMENT Supervisor : E. Barraq Jumaa Prepared by: Ahmad Faqra Amjad Zarour Nidal Haroon.
Construction Project Management “Tubas Governmental Hospital” Prepared by: Asma’a Abu-Aqel Naheel Al-Naser Presented to: Ir: Barraq Jumaa.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
C ONSTRUCTION PROJECT MANAGEMENT Submitted in partial fulfillment of construction project management for the bachelor degree in civil engineering Fuad.
Measuring Palestinian labors productivity Rates for Block, Steel and excavation works Measuring Palestinian labors productivity Rates for Block, Steel.
Construction Project Management Prepared By: Omar Al-Taher Supervised By: Dr Baraq Jum’aa.
Project title : Typical design of community college Supervisors: 1-Prof.Dr.abdulmohsion W. Dhowain 2-Dr. Mohammad Jamal AL Shannag 3-Dr. Ibrahim Hamouda.
P ROJECT M ANAGEMENT. Case study Assumptions Methodology Discussion.
What is the “Project”? A temporary endeavor undertaken to create a unique product or service.
7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Project Cost Management
Project Management.
Prepared By: Dana Heigeh Isra’ Atallah Manar Raddad
Project Management Methodology Used in Responding to Publishers’ Surveys Presenters: Jay Johnson, Institutional Research and Planning Liana Crisan-Vandeborne,
Project Management MGT 30725
An-Najah National University
February 23, 2017 Luncheon.
Measuring Palestinian Labors Productivity
Gantt Chart Presentation Name Course Name
Variation Orders By: 1.majed bushnaq 2.mahmoud battat
Civil engineering department Foundation Design of Al – Jasser Building
Construction Project management
{Beir Ziet Secondary Boys School }
Design of shallow foundations for optical and nursing faculty
Construction Project Management
Introduction to Project Management
An-Najah National University
An-Najah National University
Construction Project Management
What is the best method for constructing schools in Palestine ?
Construction Project Management
Construction Project management
Mrs. RESHMA RAJ AP/CIVIL ENGINEERING DEPARTMENT OF SCD
Prepared By : Supervisor : Eng. Abdulhakeem Al- Jawhari Hareth Jepara
Basic Project Scheduling Line of Balance
THE HIERARCHY OF SCHEDULES
An - Najah national university Civil engineering department
Introduction to Scheduling Chapter 1
Project management (seminar)
Preparing for a Career in Architecture
Design of A Sewer Network For Siries Village
Capstone Team Project title
An Najah National University
" multifunctional building design"
LINEAR BALANCE METHOD & MATRIX SCHEDULE
Civil Engineering Department
Project management concepts
An-Najah National University Faculty Of Engineering civil Department
CHAPTER ONE: RESOURCE ALLOCATION AND SCHEDULING
“ Construction of a Hospital Building” Submitted by: Zuhaib Alam 15PWIND0402 Submitted To: Prof.Rashid Nawaz Department of Industrial Engineering University.
Muskat Secondary School Project
Presentation transcript:

Construction Project Management An Najah National University Collage Of Engineering Civil Engineering Department Construction Project Management “Aljadera School ” Submitted in partial fulfillment of construction project management for the bachelor degree in civil engineering Prepared by: Mohammad Shehab Motaz Abduldaim Khalid Mahmoud Ahmad Mahajneh Presented to: Ins: Luay Dwaikat

Graduating project consist two parts : The first part include preparing a theoretical research. The second part includes the application of the principle in construction project management.

Introduction What is a Project? A project is a temporary endeavor undertaken to accomplish a unique product or service with a defined start and end point and specific objectives that, when attained, signify completion.

What is Project Management? Project management is the application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project.

What can go wrong in a Project? The major cause of project failure is not the specifics of what went wrong, but rather the lack of procedures, methodology and standards for managing the project

The Triple Constraint

OUR PROJECT

Total area of the building is 2178.18 m^2. Project overview Al-jadera basic school is allocated in Al-jadera village near Ramallah , it accommodated large number of students It achieves all student services and structural needs , it consists of 4 floors, ground floor, first floor , second floor and third floor.  Total area of the building is 2178.18 m^2. High of each story is 3.38 m.

Site Plan

Sequence of work According to the drawings and specifications, a specific method is used in managing this project, by following these steps: WBS Preparation. Quantity Surveying. Activity list & activity coding. Bill of quantity (BOQ) preparation; quantities, cost, resources, and man hours. Activity durations & productivity. Project price. Project network. Project budgeting. Project duration.

Work Breakdown Structure (WBS)

Quantity Surveying: We have calculated the quantities in our project. We used the most accurate way in calculating the quantities . Example of calculating Plaster.

:Activity Coding The activity code used at this project can be illustrated as follows: The first letter: represents the 1st letter at level three in the WBS, like; 0: Ground floor 1: First floor And so… The second letter: represents the 1st letter at level two in the WBS, like; E: Earth work C: civil work The third letter: represents the 1st letter at level four in the WBS, like; W: walls & columns. RS: roof slab &stairs. And so… For example; activity (F1CW) is located at 1st floor, civil works, walls & columns

:Activity Duration After determining the productivity rates for each labor from statistical studies we determine the duration according to this equation Duration = (Quantity /(NO of crew*productivity )) For example : the activity of Tile for Ground floor Quantity =503.92 m2 Productivity = 20 m2 /day /crew , crew (1 Skilled + 1 Unskilled ) NO of crew = 3 Duration = (503.92 /(20*3)) = 9 days

:Activity Cost After doing the activity list and quantity works , we did a study to determine the resources of each activity and the cost of these resources in order to determine the cost of activities As in the previous example: Cost of 1m2 of tile = 60 NIS Total man hours = 9 *3 *16 = 432 hr Cost of one crew = 260 NIS/day Total cost of labor = 260 *9 *3 = 7020 NIS Total cost of material = 503.92 *60 =30235.2 NIS Total cost of activity = 7020 + 30235.2 = 37255.2 NIS

Results: The following table shows the percent of work for each part of WBS to the total work:

Cost-Price Analysis

The following table shows the direct and total project cost with the price the factor used is : Direct – indirect = 1.062 Mark up = 1.17

Resource Profile In our project ,we took into consideration the sequence of labor s for the same activities with no day off for example Plaster & Tile Profile :

S – Curve

Discussion and conclusions: After we made the analysis in this sample project we reach to some approximate values for unit man hours which can be used for other similar project so saves time in cost estimation . From the percent of cost for each part of WBS we note that external finishing has the major affect in the cost of the project then civil work , land scape and architecture work so its prefer to do the external finishing "stone cladding "at the end of project to allow for some flexibility an activities sequences and do not affect in the project cost from the beginning .

Thanks For Your Attention