SCT On-detector VCSELs

Slides:



Advertisements
Similar presentations
Electrical and thermal testing at Glasgow and Liverpool.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
6. Reliability Modeling Reliable System Design 2010 by: Amir M. Rahmani.
Reliability Extending the Quality Concept. Kim Pries ASQ  CQA  CQE  CSSBB  CRE APICS  CPIM Director of Product Integrity & Reliability for Stoneridge.
VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
Detector lecturesT. Weidberg1 Opto-electronics Why use opto-electronics –General advantages –HEP experiments Elements of system –Emitters –Fibres –Receivers.
ATLAS/CMS Opto WG March '10 Tony Weidberg1 Radiation Damage Passive Components Versatile Link WP 2.3 –Todd Huffman, Mark Jones, Nick Ryder & Tony Weidberg.
Reliability 1. Probability a product will perform as promoted for a given time period under given conditions Functional Failure: does not operate as designed.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
Copyright 2007 Koren & Krishna, Morgan-Kaufman Part.2.1 FAULT TOLERANT SYSTEMS Part 2 – Canonical.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Introduction Before… Next…
VCSEL Failures in ATLAS T. Flick, University of Wuppertal TWEPP 2010 Aachen,
LightABLE Production Status ID Week October 2014 Tony Weidberg1.
Items for Discussion Chip reliability & testing Testing: who/where/what ??? GBTx radiation testing GBTx SEU testing Packaging – Low X0 options, lead free.
Disk testing - status. Disk Test Setup we use similar setup as the one used for sector tests, only simplified (no C6F14 cooling system, no source test,
STATUS OF VCSEL BASED OPTO-LINKS JOSHUA MOSS, JENS DOPKE AUGUST 19, 2010 On-going analysis for the on-detector Pixel VCSELs TEMPERATURE MEASUREMENTS OPTICAL.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
S.Hou, Academia Sinica Taiwan. 2Outline Optical links for ATLAS Laser-driver  fiber  PIN-driver LHC modules in service Rad-hard requirement for LHC/SLHC.
Optical Links CERN Versatile Link Project VL – Oxford involvement CERN VL+ for ATLAS/CMS phase II upgrade – Introduction and aims – Oxford workpackage:
Installation and Testing of Optical Harnesses John Matheson Rutherford Appleton Laboratory Schedule for test and assembly Outline of required tests Acceptance.
AOC Performance Death rates – Channel distribution & FEA Decrease in optical power with time Summary.
C. Issever, Oxford 1 Status of Radiation Proposal Focus on: Amendment to Proposal Radiation Protocols.
Analytical Approaches to Evaluate Residual Cable Lifetime Module 4 Dr. John H. Bickel Evergreen Safety & Reliability Technologies, LLC.
SCT/Pixel Off-detector VCSELs
Reliability Failure rates Reliability
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
Extensive Investigation of Calibrated Accelerated Life Testing (CALT) in Comparison with Classical Accelerated Life Testing (ALT) Burak Sal (Presenter),
Tony WeidbergOpto WG April '081 SCT Links Long Term Monitoring Summary quality installed links Techniques for monitoring long term performance –Data links.
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
PIN current degradation Versus 3 MeV proton fluence 3 MeV proton (a)(b) (c)(d) Study of radiation damage in VCSELs and PINs for the optical links of the.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Peter W. PhillipsATLAS SCT Week, CERN, September/October 2002 Electrical Tests of SCT modules using RODs Peter W Phillips Rutherford Appleton Laboratory.
December Status of MRS photodiodes ND280 Convener’s Meeting, 9 June 2006 Yury Kudenko INR, Moscow.
23/01/2007ID Software Workshop1 SCT performance from the SR1 endcap data Satoru Mima Okayama University ID Software Meeting 23-Jan Noise Study -
Part.2.1 In The Name of GOD FAULT TOLERANT SYSTEMS Part 2 – Canonical Structures Chapter 2 – Hardware Fault Tolerance.
MPI/ATLAS H.-G. Moser MPI, Munich Detector Status Delivered: 86% IV measured: 58% + Visual insp.: 39% fail : ~5%
1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ at SR1 HEP Cosmics setup Running modes Problems Future.
Operation & Performance of the ATLAS SemiConductor Tracker Dr. Petra Haefner Max-Planck-Institut für Physik.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
`` ATLAS inner detector JV Els KoffemanAtlas - Inner Detector1 Tracking in solenoid 2 Tesla field – 3 pixel layers with 50 um x 400 um cells – 4.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
EC: 7 DISK concept Preliminary considerations
SCT Links Operation Performance from QA and operation
Opto Mini-Workshop, CERN 21/3/14
ESR for the muon DT Minicrate System
Shuki Benjamin et al Compass-EOS & PVA TePla AG
ATLAS Tracker Upgrade Liverpool December '06
End-cap Mechanics FDR Overview of the Project
ATLAS optical system status, VCSEL failures, analysis and mitigation
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
CALICE: Thermal, Mechanical and Assembly issues
Understanding of Long-Term Stability
DAQ for ATLAS SCT macro-assembly
Understanding of Long-Term Stability
Mechanics: (Tim).
Status report of the ATLAS SCT optical links
Services Layout – Update
Martin Shaw – Reliability Solutions
Reliability and Maintainability
Reliability Failure rates Reliability
Martin Shaw – Reliability Solutions
} 2x + 2(x + 2) = 36 2x + 2x + 4 = 36 4x + 4 = x =
Condition Monitoring for Power Electronics Reliability (COMPERE)
Reliability.
Presentation transcript:

SCT On-detector VCSELs SCT On-detector VCSELs use older proton implant devices, not oxide implant (as in SCT/Pixel off-detector VCSELs and pixel on-detector). Slower and higher threshold (hence obsolete) Better reliability “Gold Standard for reliability” Standard Truelight part with good reliability data Safer packaging because no glue used over VCSEL surface (fibre held above surface by plastic spacer). no Infineon connector. We performed accelerated aging test for irradiated VCSELs. 19/8/10 Tony Weidberg ATLAS VCSEL Meeting

Tony Weidberg ATLAS VCSEL Meeting Lifetime Studies (1) Lifetime tests for the proton implant VCSELs: NIM A 497 (2003) 294. 20 devices operated DC for 2534 hours at T=100C. Use Weibull distribution for failure rates If a=1 Poisson distribution. Use Truelight value a=1.7. 90% c.l. MTTF = 8990 hours. 19/8/10 Tony Weidberg ATLAS VCSEL Meeting

Tony Weidberg ATLAS VCSEL Meeting Lifetime Studies (2) Use Arrhenius equation: Use Truelight measurement EA=1 eV. Assume T~ 0C  AF = 88000  MTTF ~9 104 years. Don’t expect high failure rate over 10 years operation but need to monitor performance … 19/8/10 Tony Weidberg ATLAS VCSEL Meeting

VCSEL Power Measurements Monitor VCSEL power using p-i-n current in BOC (USA15). 19/8/10 Tony Weidberg ATLAS VCSEL Meeting

Tony Weidberg ATLAS VCSEL Meeting VCSEL Power Stability Higher temperature after cooling restart Good stability Stability in 2008/9 checked with Rxthresholds and was also ok. 19/8/10 Tony Weidberg ATLAS VCSEL Meeting

Tony Weidberg ATLAS VCSEL Meeting VCSEL Deaths From May ’10 configuration: Dead RX links 1.27% Combination of electrical and optical failures. Predominantly during installation ”delayed infant mortality” probably because burn-in could not be performed at sufficiently high temperature. 1 death in 2010, none in 2009. Live time of RX links NRZ data so depends on L1 rate and occupancy. Very limitted equivalent on-time so far. Need more operational experience at higher L1 rate before we can conclude anything about the long term reliability of the on-detector VCSELs. 19/8/10 Tony Weidberg ATLAS VCSEL Meeting

Tony Weidberg ATLAS VCSEL Meeting Expected Data Rates 3 months of testing would confirm survival up to 2015. 19/8/10 Tony Weidberg ATLAS VCSEL Meeting

Tony Weidberg ATLAS VCSEL Meeting Stress Tests Need to perform stress tests at RT for long periods of time to detect any unexpected damage mechanism with a low value of EA Plan to perform stress tests using harnesses on SR1 sector. 47 barrel and 33 EC modules Run in clk/2 mode  50% duty cycle Operate continuously apart from when sector required for training. Measure power Use OSA for periodical checks for spectral narrowing. Use 7 or 8 non-electrical functioning modules on detector in clk/2 for similar stress tests. 19/8/10 Tony Weidberg ATLAS VCSEL Meeting