Scoping for Performance-Based Solutions; I-35W @ CR E2 ACEC Conference March 5, 2012 Tom O’Keefe Metro District Program Delivery.

Slides:



Advertisements
Similar presentations
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Advertisements

Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.
May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Office of Highway Safety Bridge Inspections Dan Walsh.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Transportation leadership you can trust. presented to Talking Freight Seminar presented by Richard Margiotta Cambridge Systematics, Inc. September 21,
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
2009 ACEC/ODOT CONFERENCE ODOT’S 1R PROGRAM Liz Hunt, P.E. ODOT Pavement Services Engineer.
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
Purpose of Work Shop Share Ohio’s experience with a full closure reconstruction: the rationale, challenges, implementation and benefit.
Parks and Recreation Division December 15, 2009 PARK LAND ACQUISITION.
Engaging State DOT’s Engaging State DOT’s 2008 ITS America State Chapters Council Annual Meeting and State Chapters Strengthening Workshop Bernie Arseneau,
Southern Bridge Project Brown County Executive
2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Forecasting and Evaluating Network Growth David Levinson Norah Montes de Oca Feng Xie.
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Minneapolis Regional Chamber of Commerce, Critical Issues Forum Charlie Zelle, Commissioner Minnesota Department of Transportation.
Route 1 Olden Avenue & Mulberry Street Hyperbuild Project.
MED SR 18 Corridor Project MED PID October 13, 2015.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
FHWA: Revision of Thirteen Controlling Criteria for Design; Notice for Request and Comment. Comments Due: December 7, 2015 Jeremy Fletcher, P.E., P.S.M.
AASHTO – SCOPM Palm Desert, California October 23, 2009 Mn/DOT Performance Management - Setting our Direction.
Caltrans District 4 All information presented here is an estimate; It is preliminary and subject to change. SMALL BUSINESS OUTREACH FOR CONTRACTORS March.
Delivering Together: A Case Study Highway 7 and Louisiana Avenue Interchange ACEC MnDOT Conference March 5, 2012.
District 7 (Los Angeles and Ventura Counties) State Highway System San Gabriel Mountains National Monument Area SAN GABRIEL MOUNTAINS NATIONAL MONUMENT.
Transportation Asset Management PM Peer Exchange Performance Reporting and Target Setting (Section 2): VDOT’s Experience Connie Sorrell Chief of System.
MAIN ROADS WA & LOCAL GOVERNMENT
Inventory Information
Pioneer Road Relocation and Reconstruction Project
AASHTO SCOP Linking Planning to Programming P2P Link
MnDOT Budget Overview House Transportation Finance Committee Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer February.
The I-465 West Leg Reconstruction Project
Transportation Funding
City of Milwaukee Department of Public Works
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Florida Department of Transportation
ALDOT Pavement Preservation Policy
CR184 (Quintette Road) Bridge #480045
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
State Highway System San Gabriel Mountains National Monument Area
Oregon Freight Plan Amendment
Mr. Greg Slater, Administrator
Interstate Operations Study Planning + Simulation
I-69 Southwest/I-610 West Loop Interchange Reconstruction
Using iPeMS Performance Management Data
Fortify: The I-40/440 Rebuild Project
BRIDGE INVENTORY INFORMATION
NEVADA TRANSPORTATION CONFERENCE March , 2011 Reno, Nevada
Traffic Impact of Pedestrianisation in Stellenbosch
TRANSPORTATION SUMMIT
Southern Bridge Project Brown County Executive
BRIDGE INVENTORY INFORMATION
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Louis E. Feagans, P.E. Statewide Technical Services Director, INDOT
Comprehensive and Dependable Transportation Plan
Parks Highway Reconstruction: Lucas Road to Big Lake Road
Metropolitan District | mndot.gov
Brunswick Maine Street Bridge Feasibility Study Preliminary Alternative Evaluation September 12, 2019.
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

Scoping for Performance-Based Solutions; I-35W @ CR E2 ACEC Conference March 5, 2012 Tom O’Keefe Metro District Program Delivery

Problem Scenario The sizes of bridges today are an average six times the size of its predecessor… Federal Bridge Inventory Report Innovative solutions to bridge the gap Transportation Demand Transportation Funding In 2010, Twin Cities was ranked 10th most congested city in the nation. (according to 2011 Urban Mobility Report) In 2010, Twin Cities was ranked 10th most congested city in the nation... 2011 Urban Mobility Report

Age Profile and Investment Strategy of State Highway Bridges Overview Based on 2009 MnDOT Bridge Report 10.9% to 19.6% Replace (501+395=896) 58.4% Improve (2,675) 30.2% Preventive Maintenance (1,383) Age Profile and Investment Strategy of State Highway Bridges

We are competing with the world for our message.

We are competing with the world for our message.

Superstructure Rating – 4 Substructure Rating – 5 Existing Bridge Constructed in 1964 Chapter 152 Bridge Superstructure Rating – 4 Substructure Rating – 5 Vertical Clearance – 14.8’ Sufficiency Rating – 52 Structurally Deficient All beams over SB 35W have repair patches from several high load hits, South fascia has some severed tendons

Traffic Volumes West Side ADT East Side ADT 2010 – 10,600 2008 – 10,100 2006 – 10,900 2004 – 14,000 2002 – 9,600 2000 – 9,600 2010 – 6200 2008 – 5650 2006 – 5720 2004 – 7000 2002 – 7600 2000 – 7600 We are competing with the world for our message.

Existing Delay West Junction East Junction am LOS B (12 seconds delay) pm LOS C (21 seconds delay) East Junction am LOS B (13 seconds delay) We are competing with the world for our message.

Future Delay 10% Growth 20% Growth West Junction East Junction am LOS B (14 seconds delay) pm LOS D (34 seconds delay) East Junction am LOS C (15 seconds delay) pm LOS D (33 seconds delay) West Junction am LOS C (16 seconds delay) pm LOS F (69 seconds delay) East Junction am LOS C (19 seconds delay) pm LOS F (64 seconds delay) We are competing with the world for our message.

Crash History West Ramp East Ramp Statewide Rank - #2320 Crash Cost - $51,000 Crash Rate – 0.36 Severity Rate – 0.42 Statewide Rank - #2699 Crash Cost - $8,000 Crash Rate – 0.14 Severity Rate – 0.14 How many intersections are there statewide – Over 8000 intersections statewide Metro Average crash cost is $109,000 Average CR for metro area is 0.4 for all way stop Average SR for metro area is 0.5 for all way stop

Existing E2 Bridge Section

Proposed E2 Bridge Section We are competing with the world for our message.

Section Under E2 Bridge 30’ Clear Zone

Section Under E2 Bridge 16’ Clear Zone

Tradeoffs for I35W Section Bridge cost increase for 30’ clear zone Bridge Maintenance Cost incr. for 30’ clear zone Guardrail cost @ 16’ Annualized Guardrail Repair cost @ 16’ Annualized Guardrail Snow & Ice cost @ 16’ Operating funds vs. Construction funds