Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Advertisements

Present Procedure for cutting stuck casing on Drilling PLATFORM
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
RF Layout 3pi/2 for Discussion. 2 RF Design mtg 14/1/15 Output line from amplifier is lower than the PRY, needs to go high to clear PRY to couple to South.
Instrument Space Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
Rectangular framed structures
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
TIS Review 13 Dec Bill Elliott IR ABSORBER STATUS1 Bill Elliott LBNL Presented at the TIS SAFETY REVIEW 13 Dec Berkeley,CA brookhaven - fermilab.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
Baseline Change Request BCR Title: EBD New 6 Ton Bridge Crane Installation BCR #: N/A Presenter’s Name: Robert Law CCB Presentation Date:
EBD existing crane details and future bridge crane upgrade Alev Ibrahimov June
Materials Lists Preparing to Build. Materials List  Complete list of all supplies needed to complete the project  Must be detailed  Dimensions of materials.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
EHN1 Extension overhead crane coverage Keith Kershaw CERN EN-HE.
ENERGY EFFICIENT HOUSE DESIGN UDC, Van Ness Campus Student Architects: Sarah Alexander and Roberto Martin.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
ORKA Preservation Task Force ORKA Preservation Task Force first meeting Wednesday, February 8, Notes by Peter H. Garbincius Notes from meeting are.
Some naïf ideas on cryostats , BNL-LBNF meeting D.Mladenov, M.Nessi.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
Status report AHCAL Mechanics Karsten Gadow CALICE Collaboration Meeting KEK, Studies of AHCAL absorber structure stability.
Columbus McKinnon Corporation 125 years old. Publicly traded. More than a hoist and chain company.
OVERVIEW OF INSTALLING A DOUBLE TRUSS CAISHEN CONTAINER ARCH SHELTER
ILC TRANSPORT AND INSTALLATION Questions from last CES: Beam height explanation, Transport implications of sloping access tunnels proposed for access to.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
1 NCSX WBS HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
Intelligent! Impressive! Incredible!
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
Installation of the T600 at Fermilab CSN2, September 22,
ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN.
Chicago-Area Industrial Spaces Looking for off-site assembly spaces.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
GRID REFERENCES NORTHINGS AND EASTINGS.  NOT THE SAME AS LATITUDE AND LONGITUDE  Used to help you locate a specific spot on a flat map  Uses a grid.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
T600 Detector FNAL Fernanda G. Garcia Fermi National Accelerator Laboratory.
Warm Vessel Leveling Islands (Piers)
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Installation of the T600 at Fermilab
Baby-MIND Modules & Services
LBNF CAD models, Drawings and Component list
SBN Far Detector Installation & Integration
RF Layout 3pi/2 for Discussion
SX1 manipulation VERSION 1 Version
Various Views From CAD Layout Emphasis on the relative locations of
Plan for the installation of the TAMU screen
VELO-installation meeting CERN, January 17, 2006
NORTHINGS AND EASTINGS
MICE Partial Return Yoke Mechanical Design
INSTALLATION SEQUENCE
Endcap shielding senarios:
SBN Far Detector integration model overview
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
EHN1 Neutrino Installation Plans
CPA Moment on the left is ~100*150kg/2.
LCD Splicing Screens Wall-mounted Guide
Far Detector Activities Late 2017 – Early 2018
Assembly instructions for M-K all bolt together hoppercone kit.
Mounting a BalanceBox®650 to a brick wall
SiD IR Layout M. Breidenbach, P. Burrows, T. Markiewicz
VELO RICH 1 INSTALLATION PLATFORM BALCONY BALCONY
NORTHINGS AND EASTINGS
LTI no 27: Finger crushed 13/June/2000

ICARUS Internal Cryogenic Sensors

Presentation transcript:

Warm Vessel South Wall Installation, Sub-assembly Option SBN – Far Detector Warm Vessel South Wall Installation, Sub-assembly Option Frédéric Merlet, Justin Tillman, Andy Stefanik March 29, 2017 CERN - Fermilab

Starting point March 6, 2017: Frédéric: Make a corner sub-assembly that the building crane can install. Justin: Make the corner sub-assembly with ½ of the south wall panels to eliminate counter-balanced lifts for the South wall. 2 long-wall panels CG Crane coverage

The CG crosses into the crane coverage with this assembly. Starting point: The CG crosses into the crane coverage with this assembly. 3 long-wall panels CG Crane coverage

CG, 5 long-wall panels [6,460 Kg (14,242 pounds)] Moving on: CG, 5 long-wall panels [6,460 Kg (14,242 pounds)] CG, 4 long-wall panels [5,560 Kg (12,260 pounds)] Crane coverage

Use the assembly with the 4 long-wall panels. Lifting Lifting Bar Lifting fixture Brace CG, 4 long-wall panels [5,560 Kg (12,260 pounds)] Lifting Bar Position crane hook over the CG. Crane coverage Quantity of 3 max.

Assembly: Assemble the North wall to support each South corner while it is assembled. Alternatively, brace it to the warm vessel floor. Bolt the 4 long-wall panels together on the warm vessel floor. Bolt the 3 short-wall panels together on the warm vessel floor. Bolt the two sub-assemblies together supported by the North wall.

Transport from the NE to the SW corner: There is space to rotate the SW corner to correct orientation.