Steven S Prevette ASQ Certified Quality Engineer Fluor Hanford

Slides:



Advertisements
Similar presentations
Quality control tools
Advertisements

Implementing Quality Concepts
Facilitated by Joanne Fraser RiverSystems
Project leaders will keep track of team progress using an A3 Report.
Rock Paper Scissor Tournament. STRATEGIC MANAGEMENT PROCESS 1.4.
Computer Engineering 203 R Smith Project Tracking 12/ Project Tracking Why do we want to track a project? What is the projects MOV? – Why is tracking.
Chapter 10 Quality Control McGraw-Hill/Irwin
Software Measurement and Process Improvement
Chapter 7 Controlling - To Ensure Results
Ensuring Quality and Productivity If you forget the customer, nothing much else matters. —Anne Mulcahy, CEO, Xerox Corporation Chapter 2 Copyright © 2010.
The Quality Improvement Model
Readiness Index – Is your application ready for Production? Jeff Tatelman SQuAD October 2008.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Effectively applying ISO9001:2000 clauses 5 and 8
Total Productive Maintenance (TPM)
© 2007 Breakthrough Systems1 Deming’s Red Bead Experiment AICE Quality Conference Tuesday, 06MAR07 Jim Clauson Breakthrough Systems
Quality Control McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 1 Enterprise Wide View.
Leading Metric Indicators. Expected Outcomes Understand the difference between performance indicators and measures Why lagging indicators don’t tell the.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Managing Project Through Information System.  Monitoring is collecting, recording, and reporting information concerning any and all aspects of project.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Information, Analysis, and Knowledge Management in the Baldrige Criteria Examines how an organization selects, gathers, analyzes, manages, and improves.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
© 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Quality Control Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
PERFORMANCE MEASURES GROUP 4. DEFINITION PERFORMANCE MEASURES. These are regular measurements of outcomes and results which generates reliable data on.
Lies, Damned Lies, and Statistics Hanford Performance Indicator Forum December 11, 2003 Steven S Prevette Fluor Hanford Safety and Health
Informed Traveler Program and Applications Agile / Scrum Overview Jerry Inberg.
Establishing baselines Detecting a Trend What to do following a Trend How to re-baseline Life Cycle of a Trend.
1 CQA Training QUESTION BANK. 2 CQA Training QUESTION 1 THE TWO DEFINITIONS OF QUALITY ARE: QUALITY MEANS MEETING REQUIREMENTS QUALITY MEANS FIT FOR USE.
Trainer Contact Information Wes Horton, CET, STS – – –
8.1 Plan Quality Management
Getting Started with Flow
Best Practices in using a Balanced Scorecard
Iterative Risk Management Workflow Tool
Implementing Quality Concepts
Safety and Security Management Fundamental Concepts
Organisation Control KPI’s & an industry Review
CSC350: Learning Management Systems
Risk Management for Technology Projects
What is performance management?
Overview – Guide to Developing Safety Improvement Plan
Copyright © Texas Education Agency, All rights reserved
Air Carrier Continuing Analysis and Surveillance System (CASS)
Overview – Guide to Developing Safety Improvement Plan
Introduction In the first lesson we demonstrated the following:-
Quality Systems Frameworks
Leading with Leading Indicators
DMAIC STANDARD WORK TEMPLATE
Learning with Leading Indicators
Choosing Performance Indicators Savannah River Nuclear Solutions, LLC
Hanford Performance Indicator Forum Statistical Process Control June 2005 Steven S Prevette
Choosing Performance Indicators Savannah River Nuclear Solutions, LLC
Hanford Performance Indicator Forum
Power point presentation
DMAIC STANDARD WORK TEMPLATE
Ch. 8 - Controlling.
THE CONTROL PROCESS Learning Goals
Performance Measures and Statistics
PowerPoint Presentation to Accompany Chapter 8 of Management Fundamentals Canadian Edition Schermerhorn  Wright Prepared by: Michael K. McCuddy Adapted.
Steven S Prevette ASQ Certified Quality Engineer
Schedule Management Plan
The Life Cycle of a Trend Savannah River Nuclear Solutions, LLC
Trending Requirements and Results
Time Scheduling and Project management
How to Conduct Effectively
Presentation transcript:

Hanford Performance Indicator Forum Choosing Performance Indicators September 2004 Steven S Prevette ASQ Certified Quality Engineer Fluor Hanford Occupational Safety and Health 509-373-9371 steven_s_prevette@rl.gov http://www.hanford.gov/safety/vpp/trend.htm

Performance Indicator Introduction Remember the basics – It is more important how the measure is used than what the measure is Hanford Trending Primer - http://www.hanford.gov/safety/vpp/busobj2.htm HNF-PRO-4294 Performance Indicator Process establishes roles and responsibilities for choice of indicators, and how to use the indicators.

Creating a Management System Dr. Ackoff, Creating the Corporate Future Three Management Functions: ID of actual and potential problems (threats and opportunities) Decision making (what to do and doing it, or having it done) Maintenance and improvement of performance under changing and unchanging conditions

Five Critical Issues Managers suffer from overabundance of irrelevant information. Managers don’t know what information they need. Need to look at the decision process to determine this. Even if given the information they need, decision making will not necessarily improve

Five Critical Issues (4,5) More communication does not necessarily lead to better performance. Information can be used destructively. Managers do need to know how the information system works. Just because it came from a computer doesn’t mean it is right.

Designing a Management System The information system should be designed as an integral part of the management system Most information systems are designed independently, leading to failure Information systems should serve management, not vice versa

Dr. Ackoff’s message We do need to know the context within which the performance indicators will be used Forecasting and living with the forecasted future is important, but what about designing a better future?

Barriers to PI Development - FEAR Higher ups will use it as a “hammer” Subjected to quotas and targets imposed from above Fear (“accountability”) used as a “motivator” Actions and Explanations as a result of random fluctuations Perceived loss of control over portrayal of performance Must develop “perfect” indicator the first time Use of SPC (HNF GD 10677) can minimize these fears

Three Information Sources Worker and Customer Opinion Expert Review Process Measures We will focus on Process Measures for this topic. Note that opinions can be converted to measurement data with survey analysis, and review results can be converted to measurement data through grading criteria.

Some Approaches to Choosing PI’s Top-Down Process Approach Bottom-Up Critical Success Factors Project Management

TOP-DOWN APPROACH Look at your Mission and Vision What are your Products, Services and Customers What is your Business Objective What are desired Outcomes What are the Processes that accomplish the above (drawing a flow chart may help) Decide on Measures (see next page) Go set up data sources, gather data

PROCESS APPROACH Process REWORK Credit to Phil Monroe, DEMCOM Product Service Schedule OUTCOMES Mission Progress Commitments Met Stewardship Profit Safety Satisfaction Compliance THEORY Cycle Time In-Process Inventory Procedure W ASTE I D L E Dollars Hours Materials Data Budget REWORK Credit to Phil Monroe, DEMCOM

Connection from Output to Outcome Outcomes are only achieved as a result of a process Focusing ONLY on outcomes is a sure path to failure Ignoring outcomes is a sure path to failure When I provide a Product or a Service, what is my THEORY that connects this to a favorable outcome? Example – I provide statistical training to you. My product is you, as you leave this room. My theory is that you will apply the knowledge you have been provided, apply it on performance indicator work, cause continual improvement to occur, which will have a positive impact on accomplishing the Mission of the Dept of Energy.

Examples Input Rate (units per time or Dollars, Hours) Efficiency (Input vs. Budget, Input vs. Idle) Cycle Time (Baldrige Criteria pushes cycle time) Backlog (inventory) Procedure Compliance, Completion without Stoppage Output Rate (units per time of Product or Service) Productivity (Output divided by Input) Defect Rate (Waste + Rework vs. Output) Effectiveness (Outcome measures, Outcome per Input, Percent Compliant, Output vs. Schedule)

BOTTOM UP APPROACH Go find out what data you currently have Review existing Procedures, Requirements, ISMS Mechanisms Look for Compliance Issues Read the Contract Choose measures from available data Advantage – Cost Effective, utilizes existing resources Disadvantage – Only focuses on “visible” data, is Reactive, Not “designed” (re: Ackoff)

CRITICAL SUCCESS FACTORS List major activities, not necessarily in order List expectations for each activity Determine success criteria for each activity Determine potential failures for each activity Choose a limited number of these as Critical Success Factors Identify performance indicators to measure CSF’s

PROJECT MANAGEMENT As a project is implemented, there may be certain activities that must be accomplished Historically, we have limited ourselves to a cumulative completed against goal Consider SPC for the activity rates. One can also show progress against the scheduled completion date. Advantage of SPC is that it provides a prediction of future activity rates, and can determine the risk of missing the scheduled completion date

Data Quality Data should be replicable Operational Definitions are a must Source Data must be defined There is no “true value” of anything, but a good operational definition can save much trouble in the future ANYONE at ANYTIME in the future should be able to apply the same operational definition to the same source data, and get the same results.

Plan Ahead “It’s absolutely vital for business that you settle this method of counting, measuring, definition of faults, mistake, defect, before you do business. It’s too late afterwards” -Dr. W. Edwards Deming How many initiatives have we embarked upon, without a clear set of indicators established up front, only to be left with, a year afterwards, trying to figure out “what happened”?

Low Frequency - High Impact Measures We are currently dealing with several “outcome” based measures such as the “Golan metrics” (includes Lock and Tag Violations) which are infrequent occurrences but carry a high risk and emotional reaction When one of these events occurs, we are susceptible to over reaction to the event itself

Low Frequency - High Impact Measures (2) Analysis of the time between events (“Low Rate Trending” http://www.hanford.gov/safety/vpp/lowrate.htm) may help to understand what is happening Development of “leading” indicators - lower severity but more frequently measured items - can provide understanding and the means to prevent the high risk occurrences

Leading and Lagging Indicators Lagging Indicators dominate at the higher levels, reflecting outcomes. Tend to be standardized and dictated from above. Leading Indicators dominate at the lower levels, reflecting processes that achieve the outcomes. Tend to be customized, and driven from the bottom-up.

Hierarchy of Indicators LEADING LAGGING DOE Contractor Project Facility Team Lagging indicators dominate at high levels, leading at lower levels.

Example Leading and Lagging Flow DOE: Days Away From Work Case Rate Contractor: DAFW Case Rate, VPP STAR Status OSHA Recordable Case Rate Project: OSHA Recordable Case Rate, ORPS, Management Assessment Results Facility: OSHA + First Aid Case Rate, Self Assessments, Housekeeping Inspection Results Work Team: Safety Related Work Package Cycle Time, Procedure Compliance rates

Performance Indicator Evolution As a process matures, one may end up evolving the indicators used. For example, if interested in completing actions by commitment dates, one may end up using (as the process matures): Percent of Actions completed by due date in effect at time of completion Percent of Actions completed without missing any due dates during their life Percent of Actions completed by the original due date Average days Actions completed ahead of original due date

The Search for the “Perfect” Indicator When committees get together and try to table-top the perfect indicator, paralysis often sets in Realize all data are flawed, there is no “true value”, indicators can always be “gamed” Putting the right culture of HOW to use performance indicators in place minimizes adverse impacts Gain experience with simple indicators, then move on to more complex indicators if needed With proper analysis, flaws with existing data can be detected and fixed. If you never look at the data, there will never be an incentive to fix the data.

Three Kinds of Numbers for Management. Facts of life. If we don't make this profit figure, we will go out of business Planning, prediction and budget. Can be used to compare alternative plans. Arbitrary numerical targets. Generally used to judge workers by. Avoid the use of the 3rd kind of number Credit: Henry Neave The Deming Dimension

Analysis and Goals Control Chart Result Management Decision Resulting Goal Data are Stable Improvement is Needed Achieve improving trend Current performance is acceptable Maintain stable, with no adverse trends Non-Improving Trend Trend is Adverse / Action Needed End the Trend Improving Trend Worthy to Celebrate Continue the Trend Trend No Action Needed Monitor Trend

Conclusion: Performance Indicators are part of the Management System Good use of data will encourage Performance Indicator Development All data are flawed – Set up good Operational Definitions to minimize flaws “Just Do It” – Start collecting data and use it There is no such thing as a bad performance indicator, only bad use of performance indicators Good use of performance indicators will lead to continual improvement