Delta-DOR WG: Report of the Fall 2010 Meeting

Slides:



Advertisements
Similar presentations
1 24 April 2009 SMWG SMWG Closing Report Colorado Springs, Colorado, USA 24 April 2009.
Advertisements

7-Apr-2014-cesg-1 Joint CMC-CESG Meeting NH Conference Centre, Nordwijkerhout, Netherlands Hosted by ESA/ESTEC 7 April 2014 CCSDS Engineering Steering.
30-March-2015-cesg-1 Martin Suess (AD) Rick Barton (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Cesg-1 CCSDS Engineering Steering Group: Report to the CCSDS Management Council (CMC) and Interagency Operations Advisory Group (IOAG): Fall 2010 BSI,
Security WG: Report of the Fall 2014 Meeting BSI, London UK 14 November 2014 Howard Weiss NASA/JPL/PARSONS
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
Security WG Status Review ESA European Space Operations Centre Darmstadt, Germany 16 April 2012 Howard Weiss NASA/JPL/SPARTA
Information Architecture WG: Report of the Winter 2007 Meeting January 20, 2007 Dan Crichton, Chair NASA/JPL.
1 April 2009 CSTS WG: CSTS WG: report to the CSS Area Colorado Springs 25 April 2009 Yves Doat.
Status of Delta-DOR interoperability Berlin October 14 th, 2008 Mattia Mercolino ESA/ESOC,
ESA DDOR cross support Slide 1 CCSDS Fall Meeting 2007 ESA  DOR cross support Mattia Mercolino, ESA/ESOC.
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
13-17 October 2008 Berlin, Germany eb - 1 SMWG Closing Plenary Report Fall 2008 Meeting Erik Barkley 17 October 2008.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
Security WG: Report of the Fall 2015 Meeting ESA/ESOC, Darmstadt DE 12 November 2015 Howard Weiss NASA/JPL/PARSONS
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
June MOIMS AREA PLENARY NAVIGATION WG REPORT June 2006 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
Information Architecture WG: Report of the Fall 2004 Meeting November 16th, 2004 Dan Crichton, NASA/JPL.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
Security WG: Report of the Spring 2004 Meeting May 13, 2004 Howard Weiss, NASA/JPL/SPARTA.
The CCSDS Security WG is chartered to:
Security WG: Status Briefing
Colorado Springs, CO, USA, 24 April 2009 Deputy – David Giaretta
JAXA CCSDS Secretary Office
[Area Name] Area Report [Name] (Area Chair) [Name] (Area Deputy Chair)
CCSDS Systems Engineering Area: Security Working Group
SPACECRAFT ONBOARD INTERFACES SERVICES
Security WG: Report of the Spring 2016 Meeting
SPACE INTERNETWORKING SERVICES (SIS) AREA
Space Communication Cross Support Architecture WG
CCSDS Navigation Working Group
Wireless WG Monthly Teleconference
Security WG: Report of the Fall 2013 Meeting
SLS AREA REPORT November 2004 November 2004.
Joint IPR/DAI Workshop
CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code Oct 2002 ******************************************************
Atlanta, Georgia, USA, 16 September 2005
SPACECRAFT ONBOARD INTERFACES SERVICES
Mattia Mercolino, ESA/ESOC
SPACECRAFT ONBOARD INTERFACES SERVICES
CCSDS Navigation Working Group
SPACE LINK AREA MID-TERM REPORT
JAXA CCSDS Secretary Office
Presentation transcript:

Delta-DOR WG: Report of the Fall 2010 Meeting London, UK October 29th , 2010 Roberto Maddè ESA/ESOC, Roberto.Madde@esa.int

SUMMARY TECHNICAL STATUS SEA Area WG REPORT SUMMARY TECHNICAL STATUS Delta-DOR WG Goal: Standardising cross-support for Delta-DOR measurements Working Status: Active Summary progress / Major accomplishments: Draft Magenta Book: second Agency review completed. The WG processed 30 RIDs and the WG resolved to CESG and CMC approval for publication. Draft Blue Book: AD RIDs processed and the WG resolved to CESG and CMC approval, for Agency review Draft Green Book: no time to discuss Progress since last meeting: Second Agency Review for MB completed, BB ready for Agency review Problems and Issues: resources, quasar catalogue Status: OK CAUTION PROBLEM X

Executive Summary Attendees: Roberto Maddè, ESA/ESOC, chair James Border, NASA/JPL, member (p.t. by teleconf) Hiroshi Takeuchi, Jaxa/ISAS, member Mattia Mercolino, ESA/ESOC, member Major topics: Draft Magenta Book (in Red 2 status): RIDs resolution,2nd Agency review complete Draft Blue Book, “Delta-DOR Raw Data Exchange Format”, AD Rids discussion Significant decisions: Draft Magenta Book (in Red 2 status): WG resolution to go for publication Draft Blue Book, “Delta-DOR Raw Data Exchange Format”, WG resolution to go for Agency review Start of prototyping the BB of NASA, JAXA, ESA Short and long term plan agreed Cross-area meetings With SM WG, inputs provided for the inclusion of DDOR service in SM Next cross-area meeting foreseen during 2011Springl Meeting New work: Prototyping for the Blue Book Yellow Book which will contain the results of prototyping Continuation on the Green Book Future work/documents Blue Book titled “Delta-DOR Raw Data Exchange Format” Green Book titled “Delta-DOR technical characteristics and performance” Yellow Book in support to the Blue Book above

Summary of Goals and Deliverables (1) What do you expect to deliver and when Short term schedule: Magenta Book: Go for publication Blue Book: Run first Agency review Green Book: Complete missing chapters, review existing ones Interaction with SMWG: Continuing discussion with SMWG, for inclusion of DDOR service in the Cross-support Services

Summary of Goals and Deliverables (2) 2. Long term schedule (1): Date Milestone Fall 2010 Issue of “Delta-DOR Raw Data Exchange Format” Blue Book for First Agency Review Disposition of Second Round of Agency RIDs on the “Delta-DOR recommended practice for cross support” Magenta Book Issue of “Delta-DOR recommended practice for cross support” Magenta Book December 2010 Issue of “Delta-DOR recommended practice for cross support” Magenta Book (TBD) Reception of First Round of Agency RIDs on the “Delta-DOR Raw Data Exchange Format” Blue Book Spring 2011 Disposition of First Round of Agency RIDs on the “Delta-DOR Raw Data Exchange Format” Blue Book Progress on prototyping of Agencies’ implementation of RDEF (Blue Book validation) Review of the Delta-DOR Green Book (TBD) Fall 2011 Issue of the Delta-DOR Green Book (TBD)

Summary of Goals and Deliverables (3) 2. Long term schedule (2): Date Milestone December 2011 Completion of prototyping of Agencies’ implementation of RDEF (Blue Book validation). Start of Yellow Book containing the results of the interoperability testing. Spring 2012 Review of Yellow Book containing the results of the interoperability testing. Date TBD After Yellow Book on the interoperability testing is complete, issue 2nd Agency revision of the Blue Book. Revise Magenta Book based on inputs coming from SMWG, whenever such WG is advancing on the definition of SM for tracking services. Further interoperability testing to verify system performance and improve level of accuracy. The results of such testing could lead to the revision of the Magenta and Green Books.

Progress Achieved What do you expect to accomplish: To publish the Magenta Book To go through the First Round of Agency Review on the Blue Book by Spring 2011 To have a complete draft (for all sections) of the Green Book by Spring 2011

Open Issues / Areas of concern What are the currently known open issues Presence of NASA to meetings Quasar catalogue Areas of concern Same as above

Risk Management Update Resources are always an issue Risk of delay  managed by accepting the delay itself

Cross Area WG / BOF Issues Are there issues in your WG with other WGs? No Is there cross WG or cross area coordination needed? Service Management: SMWG will extend, in the future, their SM procedures to tracking services; interaction with such WG is being put in place, to insure the proper level of coordination At what level and how would you like to proceed? Service management: embed the DDOR service in the SM framework discussions with SMWG are on going, a more focalised concept of the required SR has been provided to SM WG