Design of a Commercial Shopping Center

Slides:



Advertisements
Similar presentations
Prof Awad S. Hanna Concrete Structures Concrete Structures.
Advertisements

April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Robert Adkins Et 494 Instructor: Dr. Cris Koutsougeras Advisor: Mr. Rode 12/04/2013.
Foundation Systems.
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
Examination 7 th Semester CAHS 71 Bianca Bogdan. Outline Proposal Scheme Design Detail Design 1 Detail Design 2.
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
Presented and arranged by: Jason Vila and Sergio Castillo.
PALM COAST COMMERCIAL & INDUSTRIAL CENTER – PHASE Application No. SP-MAJ
Steel Fabrication & Erection of Belle Chasse Primary School Belle Chasse, LA Derek Duhon ET Instructor: Chris Koutsougeras Advisor: Edward Rode’
Cindy Miller – Cindy Frey – Ridge Road Rockwall, TX
Property Appraiser and Tax Collector Office Space Search Update Real Estate Management March 25, 2014.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
2012 Alton, Texas.  CENTENNIAL PLAZA is a Mixed Use development located on 5 Mile line / Trenton, in the west area of McAllen Area within the City of.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Senior Design Project Office Building By: Heath Yeager ET – 493 Spring 2014 Advisor: Mr. Rudolph Rode.
Chapter 2 Introduction to Construction Procedures
presents 5080 Meridian Street Pre-Construction Appraisal performed March 2009 $1,650,
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
 Presented by: Stephen DeMatteo  Engineering Technology, Construction  ET- 494 Fall 2014  Advisors: Ed Rode Cris Koutsougeras.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
PRESENTED BY : AARON OROCK CONCENTRATION : CONSTRUCTION ENG CLASS ET 493 FALL 2015 Instructor: Dr. Cris Koutsougeras Advisor: Dr. Mohamed Zeidan.
Steel Fabrication & Erection of Belle Chase Primary School Proposal – Fall 2015 ET 494 – Senior Design II Derek Duhon Instructor: Dr. Koutsougeras Advisor:
Construction Planning and Estimating Construction Technology I Module 2 part 2.
ET 493: Senior Design Design of a New Hammond Head Start Center By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras Advisor: Mr. R. Edward.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design II.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
ET 493 – Senior Design Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
Item 7D ZA Owner:Edwin Mannhart - Mannhart Holdings Request:Zoning Change and Site Plan for S-P-1 Detailed Site Plan District Zoning Location:375.
ET 494 – Senior Design II Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
1 Office of Economic Development Budget Economic Development Housing Redevelopment Central Parking.
Senior Design Project Office Building By: Heath Yeager ET – 493 Spring 2014 Advisor: Mr. Rudolph Rode.
Political & Billboard Signage
NAU International pavilion expansion
Design of a Commercial Shopping Center
Commercial Office Building
Multistory Office Building
Designing a Commercial Shopping Center
Parking Generation Analysis Storrs Center
Commercial Office Building
Washoe County Board of Adjustment February 2, 2017
Multistory Office Building
ET 494: Senior Design Design of a New Hammond Head Start Center
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Commercial Office Building
Valley & Third Streets Redevelopment
CHANNEL DISTRICT ACTION TEAM
83 North Lake Avenue Predevelopment Plan Review
2911 AW Grimes Blvd., Pflugerville TX 78660
Instructor: C. Koutsougeras
Concrete Structures DR. Nabil Dmaidi.
INDUSTRIAL / COMMERCIAL Facility For Lease
Senior Design Project Office Building
Call Today for More Details – Make an Appointment to See It!
Regulation Amendment AM April 3, 2018.
10 The Cost Approach—Part I: Reproduction/Replacement Cost
By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras
Commercial Office Building
NEW MEDICAL FACILITY BUILDING
Article XIII – Form Districts Community Meeting
Article XIII – Form Districts Community Meeting
New Medical Facility Building
Multi-Family Fourplex Apartment
Bob's Burgers, Hammond Louisiana
115-Unit Mixed-Use Project (711 E
Item #: 3.1 Public Hearing – Vacating Lot 1 of Kings Industrial Subdivision, Plat A, and approving the final plat of Kings Industrial Subdivision, Plat.
Town Center at Remington Park
Town Center at Remington Park
Presentation transcript:

Design of a Commercial Shopping Center BY: Taylor Stiles, Timothy Colomb, & Leighton Webre Instructor: Dr. C. Koutsougeras Advisor: Mr. R. Edward Rode’

Objective To design a commercial shopping center consisting of 3 retail units in an area of commerce.

Map Location of property

Aerial View

Survey of Site

Drone Pictures of Site

Drone Pictures of Site

Location 0 S Airport Road, HAMMOND, LA 70403 Price $1,306,800 Lot Size 3 Acres Commercial Property Sewer Type: City Water Type: Public Electricity Provided By: Entergy

Shopping Center Details 59,020 Square Ft. 3.00 Acre Lot Price per Square ft. to build is estimated at $99. 69 Total Estimated cost of construction of Shopping Center is $5,883,726.14 http://www.buildingjournal.com/construction-estimating.html

Preliminary Floor Plan

Rental unit 1 15,075 SqFt. Building Cost per SqFt. = $99.00-$100.00 The preliminary cost for construction will be $1,492,425.00. Loan for $1,492,425.00 with a 7% interest rate for 5 years or 60 months will be approximately $29,551.80/month. Building Uptake cost ($2.70 per square feet per year) estimate to be $40,702.5 In respect to the location, buildings are rented at an average of $4.67 per Sq.Ft., which would contribute to around $70,400.00/monthly. Estimated Profit Monthly – $37,456.325

Rental Unit 2 9,938 SqFt. Building Cost per SqFt. = $99.00-$100.00 The preliminary cost for construction will be $983,862.00. Loan for $983,862.00 with a 7% interest rate for 5 years or 60 months will be approximately $19,481.65/month. Building Uptake cost ($2.70 per square feet per year) estimate to be $26,832.6 In respect to the location, buildings are rented at an average of $4.67 per Sq.Ft., which would contribute to around $46,410.00/monthly. Estimated Profit Monthly - $24,692.35

Rental unit 3 34,000 SqFt. Building Cost per SqFt. = $99.00-$100.00 The preliminary cost for construction will be $3,366,000.00. Loan for $3,366,000.00 with a 7% interest rate for 5 years or 60 months will be approximately $66,650.83/month. Building Uptake cost ($2.70 per square feet per year) estimate to be $91,800 In respect to the location, buildings are rented at an average of $4.67 per Sq.Ft., which would contribute to around $311,255.00/monthly. Estimated Profit Monthly - $236,954.17 http://www.bankrate.com/calculators/business/business-calculator.aspx

Structural components Poured Concrete Slab Steel Columns Steel Beams Brick Veneer Concrete Masonry Walls Bar Joists Steel Beam Joist Roofing

F.E.M.A Flood Zone ”X” Not Flood Prone

Preliminary Building Code Review Article 2. Administration 2.4.2 Building Permit Required Article 3. Permits and Final Plat Approval 3.1.2 Permit Required 3.4.3 METAL BUILDING FACADES Article 4. Site Conditions 4.1.4 Fill Requirements Article 6. Zoning Districts 6.1.4 Commercial Article 13. Signs 13.1.8 Sign requirements by zoning district. Article 14. Parking Off - Street Parking Requirements (Table 14.2.2 B) Commercial Retail Sales And Service – 1per 250 SF FA

Timeline January 11, 2017 – First Day of class January 16, 2017 January 22, 2017 (Meet With Advisor) January 23, 2017 January 29, 2017 Finish Site Survey and Inspection January 30, 2017 February 5, 2017 Prepare Presentation February 6, 2017 February 12, 2017 Proposal Presentation February 20, 2017 February 26, 2017 Complete Research of Business Aspect/Profit Margin March 6, 2017 March 12, 2017 Start Project Scheduling March 22, 2017 March 26, 2017 Completed Review of State and local building codes March 27, 2017 April 2, 2017 Complete Floorplan and Elevation Drawing April 3, 2017 April 9, 2017 Complete Design Drawing April 10, 2017 April 16, 2017 Complete Material Take-off April 17, 2017 April 23, 2017 Complete Project Scheduling April 24, 2017 April 30, 2017 Prepare for Final Presentation May 5 (Final Presentation)

Deliverables for Spring 2017 Continue Developing Floorplan and Elevation Drawings Complete Estimate Project Scheduling Review LBC and State Building Codes to ensure all have been met Completed Design Drawing (Foundation and Structural)

Any Questions???