Compliance Report to ERCOT TAC February 2007

Slides:



Advertisements
Similar presentations
Presented to PGDTF February 11, 2015
Advertisements

April 15 and May 15, 2003 ERCOT System Disturbances ERCOT TAC Meeting June 4, 2003.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Houston Area Dynamic Reactive Project March 11,
1 Texas Regional Entity Report December Performance Highlights ERCOT’s Control Performance Standard (NERC CPS1) score for October – Initial.
Texas Regional Entity Compliance Report TAC July 9, 2009.
March 2003 Operations Summary Bill Blevins Manager Operations Engineering.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
RTWG Report to TAC August 5, 2010 Howard Daniels.
April 23 rd OWG UFLS Survey & Power Factor Review.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
1 Texas Regional Entity Compliance Update July 2007.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Texas Regional Entity Compliance Report Board of Directors February 16, 2009.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
Texas Regional Entity Report Mark Henry June 6, 2008.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
Operations Report Kent Saathoff System Operations ERCOT.
NERC Lessons Learned Summary LLs Published in September 2015.
1 State Estimator performance. 2 State of Technology Many metrics have been proposed for measuring State Estimator performance.. PI = min Σ( Z – h i (x))^
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
PDCWG Report to ROS March 11, 2010 Sydney Niemeyer.
Scheduling and Operating Transmission Devices in the Nodal Environment.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
PRR525 SCE Method Comparison ERCOT Compliance December 3, 2004.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
© CONSTELLATION ENERGY GROUP, INC. THE OFFERING DESCRIBED IN THIS PRESENTATION IS SOLD AND CONTRACTED BY CONSTELLATION NEWENERGY, INC., A SUBSIDIARY.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
1 Compliance Update June Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
Voltage Control Brad Calhoun Consultant, Sr. Trainer Spring 2016.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
Texas Regional Entity Compliance Report Larry Grimm September 4, 2008 TRE TAC September 4, 2008.
UFLS Survey Explanation
Market Trials Open Market Participant Call
Freeport Area Master Plan Project -
Compliance Report to ERCOT BOD December 2006
Grid Operations Update
TAC Report to the ERCOT Board
NOGRR-169 OWG discussion Bill Blevins June 28, 2017.
UFLS Workshop Discussion #3
PDCWG David Kee, Chair Sydney Niemeyer, Vice Chair
Market Notice Regarding Off-line Units
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
PRC Implementation Plan and Summary of Devices
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Kenneth Silver Los Angeles Department of Water & Power
Rates & Regulatory Updates
Kenneth Silver Los Angeles Department of Water & Power
Palo Verde-COI RAS Retirement
Palo Verde-COI RAS Retirement
Presentation transcript:

Compliance Report to ERCOT TAC February 2007 Compliance Update February 2007 Compliance Report - TAC

Control Performance Highlights Compliance Report to ERCOT TAC February 2007 Control Performance Highlights NERC CPS1 Performance December performance indicated a sixth straight month of declining scores since scores peaked in June June – 154.6 December – 129.5 Month-to-date score as of January 24th – 137 PRR 525 Performance Initial scores for December indicate 34 QSEs passed / 1 non-wind-only QSEs failed the measure Scores posted on the ERCOT Compliance Website Compliance Report - TAC

ERCOT CPS1 Performance Comparison Compliance Report to ERCOT TAC February 2007 ERCOT CPS1 Performance Comparison Compliance Report - TAC

ERCOT’s CPS1 Monthly Trend Compliance Report to ERCOT TAC February 2007 ERCOT’s CPS1 Monthly Trend Compliance Report - TAC

Compliance Report to ERCOT TAC February 2007 ERCOT CPS1 by Interval Compliance Report - TAC

QSE PRR525 10-Minute Interval Scoring Compliance Report to ERCOT TAC February 2007 QSE PRR525 10-Minute Interval Scoring Compliance Report - TAC

December 2006 Resource Plan Performance Metrics

SCE Performance Monitoring Compliance Report to ERCOT TAC February 2007 SCE Performance Monitoring SCE Performance Monitoring scores for all QSEs are published on the Compliance Website SCE Performance Scores Compliance Report - TAC

525 Passing 10-Min Interval Percentage Trends Compliance Report to ERCOT TAC February 2007 525 Passing 10-Min Interval Percentage Trends Compliance Report - TAC

Compliance Report to ERCOT TAC February 2007 October 3, 2006 Event Initiated at Gibbons Creek Substation in Bryan/College Station Area 138 kV coupling capacitor voltage transformer (CCVT) failed catastrophically Current-sensing components of the backup protective relay failed due to high fault current 1,214 MW of generation lost – NERC Disturbance Control Standard (DCS) Event Frequency recovered to pre-disturbance level in approximately 3 minutes – NERC criteria met; no NERC Reliability Standards violation Compliance Report - TAC

October 3, 2006 Event ERCOT deployed all RRS being provided by LaaRs in accordance with ERCOT DCS Event Operating Procedures Six of ten QSEs with LaaR RRS awards did not respond with 95% of their award within 10 minutes 642 MW tripped – 1,150 MW obligation Took over 20 minutes to achieve 95% of obligation Seven Protocol Violation Notices issued Six notices related to Section 6.5.4(2) – tripping requirements for LaaR One notice related to Section 6.5.1.1(4) – telemetry requirements 339 MW of firm load shed in area No NERC Interconnected Reliability Operating Limit (IROL) violations

LaaR Deployment 10/3/2006

October 3, 2006 Event Series connection of protective relays is contrary to current ERCOT Operating Guides for new equipment Station equipment installed prior to current requirements No issues identified with coordination studies or maintenance Equipment issues addressed Failed CCVT replaced – CCVTs on other two phases also replaced Failed relay replaced – current transformer (CT) ratio adjusted to reduce current sensed during faults Additional CTs purchased to eliminate series current connections shared by primary and backup relaying

Compliance Report to ERCOT TAC February 2007 October 3, 2006 Event Continuing to investigate: Events leading up to CCVT failure Restoration activities To meet NERC Planning Criteria, three transmission projects had been previously identified to address known risks – work still in progress. One project complete; completion of remaining projects scheduled by Summer 2008 Compliance Report - TAC

LaaR Deployment 12/22/2006