PICAM Pipeline S/W development Milestones

Slides:



Advertisements
Similar presentations
OVSA Expansion Software Overview Gordon Hurford Kickoff Meeting NJIT 25-Oct-2010.
Advertisements

Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
Fall AboutMichael Fung, CS&E, The Chinese University of HK1 CSC1030 Hands-on Introduction to JAVA Dept of Computer Science and Engineering The.
Control Software Integration German Schumacher T&S Software Lead.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
14 Data Analysis Document Status for LISA Pathfinder N. Tateo 20/02/2007.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
ADMIT: ALMA Data Mining Toolkit  Developed by University of Maryland, University of Illinois, and NRAO (PI: L. Mundy)  Goal: First-view science data.
Rupen/MoeserWIDAR Face-to-Face Meeting December 11-12, Science Data Model Michael P. Rupen & Rich Moeser.
EOVSA Data and Database System J. McTiernan EOVSA Technical DesignMeeting 7-Nov-2011.
Tools Report Engineering Node August 2007
1 RIC 2009 Symbolic Nuclear Analysis Package - SNAP version 1.0: Features and Applications Chester Gingrich RES/DSA/CDB 3/12/09.
The road to the first E2E tests
The OS Module (windows and unix)
RSOC Overview at SWT #26, 11/12 June 2009
Instrument Teams to SOC Test Specifications
Deployment timelines LHCb CMS ATLAS 2007 Dec Nov Oct Sep Aug Jul Jun
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
Jan 2016 Solar Lunar Data.
PDS4 Data From The Rover RSP Archive Concept Review 28 September 2017
ASPOC Presentation for the CAA Operations Review-1 Klaus Torkar and Harald Jeszenszky IWF/OAW Graz ESTEC, May 2006.
October 2006, LIGO Hanford Observatory
16th CAA Cross-calibration Workshop
Cluster Active Archive – Wideband data BM2 mode
Climate in The Amazon Rainforest – Data Handling
CSA Implementation overview since OR-8 Test campaigns Scheduled development plan Arnaud Masson CSA/CAA Operational Review 9 ESTEC, 04-June-2014.
Calibration Pipeline.
COMP2322 Lab 1 Wireshark Steven Lee Jan. 25, 2017.
Cluster Active Archive 1st Operations Review May 16-17, 2006
ETL Validator + ALM = Data Delivery. Faster and Better
SERENA PI Project Office 2000
Annual Report of the DWP Experiment 9th CAA Operations Review
SERENA-STROFIO Data Processing Status& Plans
Existing Perl/Oracle Pipeline
Costin Radulescu Steve Spohn 26 August, 2014
ITI Portfolio Plan Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Current Date Visibility of ITI Projects ITI Projects.
SPSS Assignment Help. Sage-Fox.com Free PowerPoint Templates SPSS is an abbreviation to Statistical Package for Social Science. It’s a windows based software.
Ken Lunn / Gwen Smith / Mike Bainbridge NHS CfH
How can I back up my QuickBooks file on my own computer's hard drive?

Annex 5: Milestones Action Determine sticker label design / features
نرم افزار گزارش ساز کارنیک
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

Label Name Label Name Label Name Label Name Label Name Label Name
Step 3 Step 2 Step 1 Put your text here Put your text here
y x y = x + 2 y = x + 4 y = x – 1 y = -x – 3 y = 2x y = ½x y = 3x + 1
©G Dear 2008 – Not to be sold/Free to use
Safety Group Program Timeline
©G Dear 2010 – Not to be sold/Free to use
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
y x y = x + 2 y = x + 4 y = x – 1 y = 6x – 3 y = 2x y = ½x y = 3x + 1

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Minor Release Drop 3 Timeline
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Safety Group Program Timeline
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Jean-Francois LEBLANC Christian SEBASTIAN
Presentation transcript:

PICAM Pipeline S/W development Milestones Feb 2017 Oct 2017 Apr 2018 Oct 2018 TM2RAW PI site Quicklook tools RAW2CAL SGS Quicklook tools

PICAM Pipeline S/W development TM2RAW status EDDS Data Package SERENA Input area Parser & Decoder Label & Table Generation Archive Product Delivery Packager Data Verification

PICAM Pipeline S/W development PI site Quicklook tools Need of tools for analyzing the usefulness of science data that go to the RAW2CAL pipeline Those Quicklook tools already available for Windows platform Examining portability to Linux (or porting to Java)

PICAM Pipeline S/W development RAW2CAL Status TM2RAW Data Package Type? SERENA Input area Label file Parser Calibrated HK1/2 product Sci mode? Mode 1 Calibrated Sci product Mode 2 Calibrated Sci product Mode 15 Calibrated Sci product

PICAM Pipeline S/W development SGS Quicklook tools Quicklook data generated during the RAW2CAL process may look like these plots: