Development of the pellet target in ITEP

Slides:



Advertisements
Similar presentations
"AIR COOLER" Heat Exchanger
Advertisements

Control and regulation of boiler operation Heat Engines & Boilers.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
Vacuum system.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Systematic studies on pellet beam production M.Büscher, A.Gerasimov, V.Chernetsky, P.Fedorets, A.Dolgolenko,V.Balanutsa, A.Boukharov, L.Gusev, S. Mineev,
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
1PANDA, Target meeting, Juelich, 08/09/2009 Pavel Fedorets Progress on Moscow-Jülich Pellet Target A.Boukharov, M.Büscher, V.Chernetsky, P.Fedorets, A.Gerasimov,
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
S A Griffiths CM42 June 2015 Electrical & Control.
SIS 100 Vacuum chamber Recooler String system Components
Status of the FAIR CCC and Cryostat
Performance test of KAGRA cryostat at site
R. Panchal, GLN Srikanth, K. Patel, P. Shah, P. Panchal,
Teleconf ACS – FREIA 28th March 2017
P.Fedorets on behalf of the Pellet target group
12 GeV Project Status Glenn R. Young 12 GeV Project Status
'FutureJet' Slow control system for targets
Installation of the T600 at Fermilab
Status of the pellet target at ITEP
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
He Plant, LN2 Systems and Commissioing
Heat Exchangers and Condensers
Sub-system integration for the VBOX
The EMC cooling F. Raffaelli INFN - Pisa 06/09/2017.
Cryogenic behavior of the cryogenic system
new straw end plug: D=10.6 mm straws support frame Levan option
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
Performance test of KAGRA cryostat at site
SPS cryogenic proximity equipment and SM18 validation
Summary of activities of the pellet target development
Cryostat design Mechanical design: Thermal screens: Specifications:
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
LARP Vertical Test Facility
Production and commissioning of the 2nd BGC
Status of the PANDA Magnet
Pellet Target for PANDA (current status)
Teleconference ACS – FREIA 31st October 2017
TEMPERATURE SENSOR LOCATIONS
(vertical cryostat, Gersemi)
Block 4 and Cluster D - Safety
Cryostat design Mechanical design: Thermal screens: Specifications:
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
XFEL Collimation and Beam Switchyard Vacuum Issues
Floating Head Heat Exchanger
Experimental equipment Edgar L. Black February 17, 2019
SNS PPU Cryomodule Instrumentation
Pellet Target developments
Pellet target developments at ITEP
News from the Pellet target
The Heat Pump-pumps heat from a cold area to a warmer area.
LCGT f2f meeting ICRR Kashiwanoha
Pellet Target developments
Cryogenic behavior of the magnet
BGC Collaboration Meeting –
Collaboration Meeting
Thermal engineering of optical mirrors for use at cryogenic
Presentation transcript:

Development of the pellet target in ITEP M.Büscher, A.Gerasimov, V.Chernetsky, P.Fedorets, A.Dolgolenko, V.Balanutsa, L.Gusev, S.Mineev, S.Podchasky, I.Tarasenko, P.Balanutsa, V.Demekhin, S.Makagonov

Timelines for the test place in Moscow 2013 2014 Q1 Q2 Q3 Q4 Purchase of the equipment and manufacture details of target Assembling of the target Vacuum test Cold test Preparation stage for target in Moscow 2013- Q1 2014 is finished: test place, frame for target, water, light, power supply, pumping out lines, drawings, purchase of equipment, production of details, 3 PC for data taking and operation. Assembling stage and vacuum tests Q4 2013 - Q2 2014 are going on.

Assembling stage for target Q4 2013- Q2 2014 Already done: Assembling of cryostat, installation of cryo-cooler, assembling full vacuum pumping system, temperature and pressure sensors are installed, leakage tests for cryostat and vacuum system (10-7 mbar), commissioning of cryo-cooler. Recently done: Gas supply system is assembled and tested for leakages. New type of condenser is produced, assembled and tested for leakages New generator New skimmer Going on: Assembling of the internal parts. The regular low temperature tests (without cooled gas) after installation of each internal part. Minimization of radiation heating. Maximization of transfer of the cooling power. Installation of the new adjustment system. Installation of the gas supply lines inside the cryostat.

Assembling stage for target Q4 2013- Q2 2014 Gas supply system

Assembling stage for target Q4 2013- Q2 2014 Installation of new adjustment system Upper part of the system New type of the condenser Lower part of the system

Assembling stage for target Q4 2013- Q2 2014 New skimmer Skimmer inlet with shielding Skimmer outlet New flange

Other activities and tests in Juelich Investigation of glues and technologies for cryogenic usage for nozzles. Tests of glues with first pellet target version in IKP. Preliminary of results of tests: Bad results for Stycast, promising results for UHU Stycast UHU

Other activities and tests in Juelich Methods and constructions for production of extra thin jets and droplets (Ø ≤ 15 µm). Experimental studies in IKP. Mini triple point chamber Produced for tests in IKP in June 2014 mini triple point chambers Generator with glued nozzle