Status of LHC Commissioning

Slides:



Advertisements
Similar presentations
LHC Machine Protection
Advertisements

February 2009 Summary of Chamonix 09 Steve Myers.
1 Where to Search for the Higgs  A direct search for the Higgs was carried out by the four LEP experiments from CMS energy of GeV The.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
The Sector 3-4 incident at the LHC: fault tree and corrective measures Ph. Lebrun Risk Analysis Review Committee CERN, 5 March 2009.
LHC Status ReportLHC Status Report Lyn Evans 96 th LHCC meeting, CERN 19 th November 2008.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
LHC status & 2009/2010 operations Mike Lamont. Contents Consolidation – brief recall Splices Operational energies Potential performance Present status.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
LHC Status - SUSY Bonn 1 Drawing by Sergio Cittolin Status of the LHC 6 months of beam operation in 2010 J. Wenninger CERN.
CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th Architecture of powering and protection systems for high field.
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
Consolidation and Upgrade plans for the LHC Vacuum System
Hadron Collider Summer School - June 2009
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
LHC Status - Planck09 - Padova,IT 1 Status of the LHC Machine J. Wenninger CERN Beams Department Operation Group Acknowledgements to R. Schmidt.
LHC Machine Operational Status and Plans LHCC, 22nd September 2010 Steve Myers (On behalf of the LHC team and international collaborators)
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
LHC Commissioning Status Gianluigi Arduini CERN – AB Department For… 23/10/20081LHC Commissioning Status - G. Arduini.
B. Todd, A. Apollonio, M. Kwiatkowski, R. Schmidt, S. Wagner, J. Walter a Risk-Based Approach 1v2 to Machine Protection Systems.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
News from the LHC J. Wenninger CERN Beams Department Operation Group
LHC beam commissioning
MQXC Nb-Ti 120mm 120T/m 2m models
HL-LHC IT STRING and Series test of SC link
BEAM LOSS MONITORING SYSTEM
Powering LHC magnets version 30/3/2007.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
MPI-ATL Calor Meeting 7-Sep-2009 H. Oberlack MPI für Physik, Munich
LHC schedule.
12 October 2009 RRB Plenary R.-D. Heuer
The LHC - Status Is COLD Is almost fully commissioned
Long Shutdown for the LHC: Vacuum Beam Pipes
Powering the LHC Magnets
Powering from short circuit tests up to nominal
Lecture 2 Live Feed – CERN Control Centre
Summary of week 7 Hardware Commissioning:
Status of the BLHC ….work in progress! Mike Lamont CERN/AB 18/01/2008
The Status of the LHC machine
BEAM LOSS MONITORING SYSTEM
DEBRIS IMPACT IN THE TAS-TRIPLET-D1 REGION
Status of the LHC December 2009
Real-time orbit the LHC
Initial Experience with the Machine Protection System for LHC
Tue :25 Beams dumped due to RF vacuum interlock
LHC status & 2009/2010 operations
LHC Morning Meeting - G. Arduini
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
Machine Protection Xu Hongliang.
Summary of Week 16 G. Arduini, J. Wenninger
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
6 months of beam operation in 2010
Wire almost entirely through beam before BLM triggers dump
LHC Beam Operations Past, Present and Future
Summary Thursday h21: Stable beams fill #1303.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
LHC status & 2009/2010 operations
Wednesday 23/2 Thanks CRYO!!!.
Another Immortal Fill….
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Review of hardware commissioning
Other arguments to train two sectors to 7 TeV
Cryogenic management of the LHC Run 2 dynamic heat loads
Presentation transcript:

Status of LHC Commissioning J. Wenninger CERN Beams Department Operation Group On behalf of the LHC design, construction, installation and commissioning teams Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

Outline Beam commissioning Incident in sector 34 Repair and consolidation 2009/10 LHC run Conclusions Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

First beam around the LHC All sectors at nominal temperature LHC Cool-down Cool-down time to 1.9 K ~ 4-6 weeks/sector [sector = 1/8 LHC] First beam around the LHC Status of LHC Commissioning - PAC09 - Vancouver All sectors at nominal temperature 04.05.2009

LHC Hardware Commissioning April to September 2008: (Re-)commissioning of the magnets & circuits (power converter, quench protection, interlocking..) following predefined test steps. 1’700 circuits, 10’000 magnets LHC was commissioned to 5.5 TeV (5 TeV target for physics in 2008). Magnet re-training required above ~6 TeV. ORAL by L. Rossi, TUE am Status of LHC Commissioning - PAC09 - Vancouver Posters MO6PFP052, WE6RFP049 11’122 test steps Commissioning of beam related equipment (instrumentation, kicker, RF…). 04.05.2009

First beam in the LHC after ~25 years of design and construction. Injection tests August – September 2008: Injection tests of up to 4 adjacent sectors. Almost all HW systems involved in tests. Essential checks for: Control system. Beam instrumentation. Optics (magnetic model) and aperture. 22nd – 24th of August Status of LHC Commissioning - PAC09 - Vancouver ORAL by M. Lamont, FRI am Posters WE6PFP026, WE6PFP026 8th – 10th of August 5th – 7th of September Evening of August 8th 2008: First beam in the LHC after ~25 years of design and construction. 04.05.2009

September 10th - control (show) room Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

Beam threading Threading by sector: Beam 2 threading One beam at the time & one hour per beam. Collimators used to intercept the beam (1 bunch, 2109 p - 2% of nominal bunch). Beam through 1 sector (1/8 ring), correct trajectory, open collimator and move on. BPM availability ~ 99% Beam 2 threading Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

‘Beam-on-collimator’ events ATLAS & CMS ‘events’ Courtesy of CMS ‘Beam-on-collimator’ events Synchronized to beam timing ! Courtesy of ATLAS Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

Beam commissioning progress September 10th : 10:30 : Beam 1 around the ring (in ~ 1 hour). Beam makes ~ 3 turns. 15:00 : Beam 2 around the ring, beam makes 3-4 turns. 22:00 : Beam 2 circulates for hundreds of turns… September 11th : Late evening: Beam 2 captured by RF. First emergency dump correctly executed. September 12th : All base instrumentation operational : BPMs, BLMs, Tune, BCTs. Good beam lifetime (> 1 hour). Beta-beating measured. Status of LHC Commissioning - PAC09 - Vancouver ORAL by R. Jones, WED pm Posters TU6PFP058, TU6RFP023 04.05.2009

Magnetic model & beta-beating A sophisticated magnetic model (FIDEL) was developed to predict transfer functions and field errors for all magnets, backed by measurements and integrated into the control system for online corrections. Posters WE6PFP023, MO6PFP046 Beta-beat tolerance : 20% Status of LHC Commissioning - PAC09 - Vancouver Horizontal beating ≤ 30% Vertical beating up to 90-100% Dominant source of beating identified as trim quadrupole inversion between beam1 & beam2. 04.05.2009

September 19th Incident Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

Event sequence on Sept. 19th Last commissioning step of the main dipole circuit in sector 34 : ramp to 9.3kA (5.5 TeV). At 8.7kA an electrical fault developed in the dipole bus bar located in the interconnection between quadrupole Q24.R3 and the neighboring dipole. Later correlated to a local resistance of ~220 nW – nominal value 0.35 nW. An electrical arc developed which punctured the helium enclosure. Secondary arcs developed along the arc. Around 400 MJ from a total of 600 MJ stored in the circuit were dissipated in the cold-mass and in electrical arcs. Large amounts of Helium were released into the insulating vacuum. In total 6 tons of He were released. Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

Inter-connection Vac. chamber Dipole busbar Status of LHC Commissioning - PAC09 - Vancouver Vac. chamber Dipole busbar 04.05.2009

Pressure wave Status of LHC Commissioning - PAC09 - Vancouver Pressure wave propagates along the magnets inside the insulating vacuum enclosure. Rapid pressure rise : Self actuating relief valves could not handle the pressure. designed for 2 kg He/s, incident ~ 20 kg/s. Large forces exerted on the vacuum barriers (every 2 cells). designed for a pressure of 1.5 bar, incident ~ 8 bar. Several quadrupoles displaced by up to ~50 cm. Connections to the cryogenic line damaged in some places. Beam vacuum to atmospheric pressure. 04.05.2009

Incident location Dipole bus bar Status of LHC Commissioning - PAC09 - Vancouver Dipole bus bar 04.05.2009

Collateral damage : displacements Quadrupole-dipole interconnection (27R3) Quadrupole support Status of LHC Commissioning - PAC09 - Vancouver Main damage area ~ 700 metres. 39 out of 154 dipoles, 14 out of 47 quadrupole short straight sections (SSS) from the sector had to be moved to the surface for repair (16) or replacement (37). 04.05.2009

Collateral damage : beam vacuum Beam vacuum affected over entire 2.7 km length of the arc. Beam screen with clean Copper surface. Beam screen contaminated with multi-layer magnet insulation debris. Beam screen contaminated with sooth. Status of LHC Commissioning - PAC09 - Vancouver ORAL by J. Jimenez, WED pm  60% of the chambers  20% of the chambers 04.05.2009

Schematic of the main dipole circuit Local (quench) protection of each magnet Status of LHC Commissioning - PAC09 - Vancouver Global protection of the bus-bar and bus-bar joints (splices) between magnets. Protection threshold 1 V (160 V inductive voltage during ramp). Bus-bar must cope with 100 second discharge time of circuit. 04.05.2009

Bus-bar joint Superconducting cable embedded in Copper stabilizer. Bus bar joint is brazed (not clamped). Joint resistance ~0.35 nW (@ 1.9 K). Protected by global bus-bar protection system, no bypass diode. relies on good quality of the joint. Status of LHC Commissioning - PAC09 - Vancouver Visual inspection after brazing. For the new joints (repair) the resistance is measured at room temperature to qualify the joint. 04.05.2009

Likely incident cause : poor quality joint Cryogenic temperature data indicated a local anomalous resistance ~220 nW in the cell where the incident occurred. Joint model with poor electrical contact, R ~ 220 nW. Simulation of the last ‘fatal’ ramp: thermal run-away around 8700 A. Protection threshold of 1 V is not adequate for bad quality joints (Ok for quench with good joint !). Threshold of ~0.3 mV is required to adequately protect the bus-bar against such incidents. Bad electrical & thermal contact Status of LHC Commissioning - PAC09 - Vancouver Localized non-sc zone 04.05.2009

What about the other joints? Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

Relative temperature, increase from 1.9 K Calorimetric data Logged cryogenic data revealed a temperature anomaly of some 40 mK in the cell of the incident during a previous (lower current) powering cycle. Data from other powering tests indicated the presence of another anomaly in sector 12. Calorimetry suggested a ~100 nW resistance. DT (mk) 7 kA test on Sector 34 Temp keeps rising! +40 mK Current in kA Relative temperature, increase from 1.9 K Suspicious cell in S12 9.3 kA test on Sector 12 Status of LHC Commissioning - PAC09 - Vancouver 4.1 TeV 5.5 TeV 1 hour 04.05.2009

Calorimetric and electrical measurements Powerful diagnostics tools were developed: Calorimetric measurement techniques with the possibility to localize anomalous resistances down to ~40 nW within a cryogenic cell. >> Systematic calorimetric tests were launched on all available sectors High precision voltage measurements were employed to measure all interconnection resistances (resolution < 1 nW) in suspected cells. The quench protection system data averaged over long time intervals for a number of current steps was used to localize magnets with abnormal internal resistances. Outcome of the test campaign: 2 magnets were localized with internal resistances of 50 and 100 nW. - Both magnets had been tested to 12.4 kA (5% over nom.) before installation! Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

Electrical measurements 60min @ 7kA 10min @ 6kA,5kA,4kA,…,0kA “Snapshots” of high statistics voltage data collection from quench protection system Voltage R ~ 50 nW Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009 Current (max = 7000 A)

Joint test status 58% of 10080 tested 59% of 13796 tested Status of LHC Commissioning - PAC09 - Vancouver 58% of 10080 tested 59% of 13796 tested Poster MO6PFP049 Testing the remaining joints is a top priority of 2009 ! The untested joints have already been operated at 5.5 TeV ! 04.05.2009

Repair and consolidation Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

Repair (I) 39 dipoles and 14 quadrupoles short straight sections (SSS) brought to surface for repair (16: 9D + 7SSS) or replacement (37: 30D + 7SSS). All magnets are back in the tunnel. Interconnection work ongoing. The 2 dipoles with large internal resistance were replaced. Lack of solder on joint, not properly brazed. MBB 2234: the ‘100 nW‘ joint Status of LHC Commissioning - PAC09 - Vancouver The 50 nW dipole will be stress tested on a bench. 04.05.2009

Repair (II) and consolidation (I) Many vacuum chambers are cleaned in situ. - Majority of magnets remain in place. - Cleaning of sooth with special cleaning head. - Removal of MLI debris by venting and pumping. Major upgrade of the quench protection system. - Protection of the main quadrupole and dipole joints. - Protection against symmetric quenches of the beam1 and beam2 apertures. - High statistics measurement accuracy to < 1 nW. >> Provides high precision online resistance monitoring of all joints! Reinforcement of the quadrupole/SSS supports. Poster MO6PFP047  Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

Consolidation (II) Improvement of the pressure relief system to eventually cope with a maximum He flow of 40 kg/s in the arcs (maximum conceivable flow, 2 x incident). Warm sectors : 20 cm diameter relief valves mounted in SITU on every dipole cryostat. Finished. - Cold sectors : all ports equipped with spring relief system (not sufficient for 40 kg/s). Temporary solution until next warm up. - Straight sections : relief valves added on cryostats. Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

LHC run 2009/20010 Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

Planning for 2009 12 23 34 45 56 67 78 81 Cool down May Low cur. powering June High cur. powering Status of LHC Commissioning - PAC09 - Vancouver July Aug Sept …followed by a long LHC run until November 2010, with short break around Christmas/new year 2009/2010. Target beam energy for physics : 5 TeV. 04.05.2009

LHC Experiments Desiderata 50-100 pb-1 of good data at s = 10 TeV. Many new limits set on hypothetical particles. 200-300 pb-1 of good data at s = 10 TeV. Start competing with Tevatron on Higgs masses ~ 160 GeV/c2. 1 fb-1 of good data at s = 10 TeV. Higgs discovery possible ~ 160 GeV/c2. Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

Int. luminosity target achievable with Luminosity Targets 2009/10 Present 4-stage collimation system limits the total intensity to 10% of the nominal intensity. ORAL by R. Assmann, TUE pm ORAL by R. Appleby, WE pm Operation in 2009/10. Status of LHC Commissioning - PAC09 - Vancouver No. bunches/ beam Protons/ bunch % of nominal intensity b* (m) Peak L (cm-2 s-1) 43 51010 0.7 2 6.9x1030 156 2.4 1 5.0x1031 11011 4.8 2.0x1032 720 (50 ns) 11.1 1.2x1032 2808 1.151011 100 0.55 1.0x1034 No crossing angle Int. luminosity target achievable with ~40% availability Short Pb ion run foreseen end 2010. Ion setup should be ‘straight forward’ as little difference wrt protons. 04.05.2009

Summary All key systems were operational. With beam the LHC is a wonderful machine (at injection). All key systems were operational. Remarkable performance of the beam instrumentation. The incident on Sept. 19th was very likely due to a poor quality bus-bar joint. Quench protection system upgrade under way. New diagnostics for online monitoring and protection of all joints. Improvements of the pressure relief system. Repair is progressing well, re-commissioning will start end-May. Beam commissioning will resume in September 2009. Followed by a 12 months run at 5 TeV. Aim to integrate few hundred pb-1 with L up to ~1032 cm-2s-1 Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

Reserve slides Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

Magnet training to 7 TeV Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

Maximum Conceivable Incident MCI ? Status of LHC Commissioning - PAC09 - Vancouver Sect.3-4 incident 04.05.2009

Existing relief valves (quadrupoles) Status of LHC Commissioning - PAC09 - Vancouver Designed for He flow of 2 kg/s Estimate for incident is ~ 20 kg/s 04.05.2009

Damage area Status of LHC Commissioning - PAC09 - Vancouver 04.05.2009

Summary of joint measurements Sectors Arc dipole Arc Quadrupoles IPQ Tests Calorimetric Magnet Bus-bar (on request) 1-2 (2) 1 2-3 3-4 4-5 5-6 (0) 6-7 (1) 7-8 8-1 Status of LHC Commissioning - PAC09 - Vancouver (1) suspected cases from calorimetric measurements 1 confirmed cases by electrical measurement 04.05.2009

Beam commissioning with a single bunch of 2109 p. ‘Quenches’ with beam The quench protection system (QPS) was triggered with fast losses of 2109 and 4109 protons, only one part in 10’000 of the nominal beam. Without force-quenching by the QPS with the quench heaters, the magnets would have recovered spontaneously BLM signal (beam2 side) BLM signal (beam1 side) Simulations agree within a factor ~2 with the expectations from the magnet model on the energy density to quench: Measurement ~ 15 mJ/cm3 Expectation ~ 30 mJ/cm3 Status of LHC Commissioning - PAC09 - Vancouver M. Sapinski Beam commissioning with a single bunch of 2109 p. 04.05.2009

Magnetic model Momentum (b1 [US=b0]): Tune (b2 [US=b1]): LHC average momentum = 450.5 ± 0.2 GeV b1 between rings ≈ 1.510-4 b1 among 8 sectors ≈ 310-4 Status of LHC Commissioning - PAC09 - Vancouver Tune (b2 [US=b1]): Measured tunes are within 0.15 of nominal ones. Corresponds to an error of 2510-4 on b2, expected ±2010-4. 04.05.2009