Nikhef/Bonn LepCol meeting

Slides:



Advertisements
Similar presentations
Test Setup for PHOBOS Hybrid/Module Testing at MIT Pradeep Sarin 31 July 98.
Advertisements

F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
D. Peterson, Cornell Univ., “Round table” 23-Jan-2003 Cornell Linear Collider Detector Research Cornell Interests: The Cornell group proposes to contribute.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
Different way of gas supply for small volume MPGDs Harry van der Graaf, Fred Hartjes and Marcel Vervoort RD51 Mini workshop CERN, 24 September 2009.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
TOF for ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Fred Hartjes 1 6 th RD51 collaboration workshop, Bari (Italy), October 9, 2010 Gossip testbeam August 12 – 22, 2010 Maarten van Dijk Martin Fransen Harry.
DESY test beam (DAQ integration, measurement plans, analysis) Mathieu Benoit.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
RD51-WG VI 28/04/2009M. Alfonsi (CERN)1 RD51 common test beam: specifications and installation status Matteo Alfonsi (CERN)
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
GLAST LAT ProjectGlast Collaboration Meeting 2005 R. Bellazzini1 Glast beam test at CERN Glast Collaboration Meeting 2005.
Status 29/09/15. Trigger system: - Scintillator system : scintillator+pmt, discriminator+ coincidence module -TLU module + PC + USB cable Detectors :
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, M. Dixit, M. Riallot, W. Wang Micromegas tests ̶
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
1 CERN 2007 Installation and Run Plan Erika Garutti & Fabrizio Salvatore.
Status and organization of the H8c area Mirko Berretti 08/07/2015 (with M.Bozzo, N.Minafra, E.Oliveri, X. Pons…)
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
1 MPGD2009 Advancements of labelled radio-pharmaceutics imaging with the PIM-MPGD J. Donnard a, N.Arlicot b,
F ERMILAB T EST B EAM F ACILITY Aria Soha June 12, 2012.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
A. SarratILC TPC meeting, DESY, 15/02/06 Simulation Of a TPC For T2K Near Detector Using Geant 4 Antony Sarrat CEA Saclay, Dapnia.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Elena Rocco Nikhef, The Netherlands On behalf of the ALICE Utrecht-Nikhef group Jamboree – Utrecht December 2012.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
Fred Hartjes 1 RD51 mini week, CERN, June 14, 2012 Implementing GridPix in a Darwin detector Matteo Alfonsi, Niels van Bakel, Patrick Decowski, Harry van.
Page 1 WP10.2: TA DESY- II Test Beam Facility AIDA-2020 First Annual Meeting Norbert Meyners, Marcel Stanitzki, Natalia Potylitsina-Kube DESY.
Clermont-Ferrand requests for the Test Beam Vidyo meeting, 29 July 2015 François Vazeille -Remote HV System -Front End electronics Hypothesis: Some Mini-Drawers.
JRA3 Institute of Physics ASCR Prague
Test beam check list Michael JECKEL EN-EA-EC.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
Planes, Telescope, System
RD51-WG X June test beam experience: useful information for October
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
Micromegas tests ̶ Test beam 2010 plans ̶ RD51 Mini Week - CERN
Tracker cooling loop “check out” draft for discussion
Preparation for CERN test beam
Development of µHV miniature HV supplies
DESY Test Beam Facilities - Status and Plan
Silicon Lab Bonn Physikalisches Institut Universität Bonn
CMS Preshower: Startup procedures: Reconstruction & calibration
Summer 2000 HF Beam Test. DAQ proposal.
ScECAL+AHCAL+TCMT Combined Beam FNAL

Nikhef/Bonn LepCol meeting
Installation and Run Plan
in a high intensity beam
MEG II実験 液体キセノン検出器の建設状況
Nikhef/Bonn LepCol meeting
Presentation transcript:

Nikhef/Bonn LepCol meeting June 2017 testbeam in Bonn Fred Hartjes NIKHEF Nikhef/Bonn LepCol meeting May 8, 2017

Questions Beam parameters? Beam control What do we want to measure? Kind: electrons Energy: ** GeV?? Minimum rate: 20 kHz?? Profile: ** x ** mm?? Time structure? Beam control Are we main user on June 8 and 9? How much time to interrupt the beam? Minimum number of people required while running? What do we want to measure? Which track angles ?? Which rates ?? How many tracks per run?

Time schedule Preparatory visit to beam area Installation start Friday May 12, noon – 16:00 Installation start ???? Installation end ???? (we need at least 8 hours) Data taking start Thursday, June 8, 12:00 Data taking end Saturday, June 10, 8:00

Organisation Who will go from Nikhef? Who will attend from Bonn? Fred Harry? Kees? Kevin …….? Who will attend from Bonn? Jochem? ……..? Transport of equipment One car will be sufficient Safety issues Dosimeter Safety course / instructions? Organisation

Overall setup Support for detector Platform/table to put things on X-Z stage Manual or remote? Rotary stage Using remote stage of Harry? Support for Xylinx board and stiff ribbon cables Office table for 2 PCs (DAQ + services)

Setup in beam area Gas system Bottle premixed at Nikhef 12.3 l @ 20 bar T2K (iC4H10/CO2/Ar 2/3/95) non flammable Installed in the vicinity of the detector In leak tray (may not needed) Pipes: 1/8”, almost completely SS Flow ~ 5 ml/min Regulated / measured by mass flow controller / meter Controlled by Labview Already used at CERN (5X) and DESY (2X) (for flammable DME/CO2) Approved by CERN/DESY gas safety officers

High voltage Using Nikhef miniHVs Range: 0 to -1000 V Current 0 – 5 µA Grid Guard Field Range: 0 to -1000 V Current 0 – 5 µA Stability ~0.1 nA Sophisticated ramping and trip protection Controlled/supplied by CAN bus Ethernet cables for data transport and power supply SHV cables to detector Controlled by Labview

DAQ Triggering Event synchronisation with existing telescope Scintillators from Bonn? NIM electronics Dead time blocking Event synchronisation with existing telescope Data is collected on two different machines No good agreement in registered time Synchronizing by single pulse at start data taking? Other/better solutions? Gain calibration Best: use value obtained with laser setup (single electron hits on pixels) Use same gas bottle Make correction for atmospheric pressure and temperature