Software modifications and reliability

Slides:



Advertisements
Similar presentations
KS4 ICT BTEC Diploma Guide to your ICT options in KS4.
Advertisements

Sixth Edition 1 M a n a g e m e n t I n f o r m a t i o n S y s t e m s M a n a g I n g I n f o r m a t i o n T e c h n o l o g y i n t h e E – B u s i.
INFSO-RI An On-Demand Dynamic Virtualization Manager Øyvind Valen-Sendstad CERN – IT/GD, ETICS Virtual Node bootstrapper.
Software life cycle processes Purpose n A new international standard (ISO/IEC 12207:1995(E) that –establishes a common framework for software life cycle.
Financial Upgrade 8.8 Update. Status Fit Gap Complete Fit Gap Complete Design in Progress Design in Progress Development in Progress Development in Progress.
Target Monitoring and Control Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
Target Real Time software Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
System Development Life Cycle (SDLC)
LabVIEW Basic I with RADE introduction A. Raimondo (EN/ICE)
Cambodia-India Entrepreneurship Development Centre - : :.... :-:-
Installing software on personal computer
Bernd Bruegge & Allen H. Dutoit Object-Oriented Software Engineering: Using UML, Patterns, and Java 1 Requirements Analysis Document Template 1.Introduction.
Types of software. Sonam Dema..
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
Installation and Administration
Microsoft Installer Technologies and patch management approaches.
Improving Software Testability Adam Knight – Test Team Leader, Clearpace Ltd. April 29 th 2009.
Information Systems Security Computer System Life Cycle Security.
Test Automation Implementation for a Fortune 500 Retail Major Fortune 500 US Retailer operating over 800 stores Revenue in excess of $25 bn with online.
1 © 2008 Avaya Inc. All rights reserved. IPOffice Configuration Service Emil Ratnam.
End HomeWelcome! The Software Development Process.
Testing in UP1 Testing as part of the Unified Process (UP)
UpgradeX and CloudSuite What you need to know. WHY?
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Operating Systems Networking for Home and Small Businesses – Chapter.
Project Cost Estimate Form PLAN IT! Todd Crosby. The Project Cost Estimate Form These are your best “educated guesses” – it is expected that data will.
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
UI Panel: Agile User Interface Design Colin Clark.
CENTRALISED AND CLIENT / SERVER DBMS. Topics To Be Discussed………………………. (A) Centralized DBMS (i) IntroductionIntroduction (ii) AdvantagesAdvantages (ii)
ICE OFM – Monitoring Accelerator Powered by OEM. SYNOPSIS Manage multiple instances of the platform Difficult in measuring performance of services Identify.
Systems and Network Design Professional Services for NT Server and NetWare Networks.
Chapter 2 Securing Network Server and User Workstations.
WEEK INTRODUCTION CSC426 SOFTWARE ENGINEERING.
Abstract A Structured Approach for Modular Design: A Plug and Play Middleware for Sensory Modules, Actuation Platforms, Task Descriptions and Implementations.
Configuration Life-Cycle Management on the TeraGrid Ti Leggett.
How to combine IRIS products Available APIs Examples of integrations Ole Andersen Senior Strategic Account Manager.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
Computer System Support   The costs of installing, operating and maintaining computer systems are called total costs o ownership or TCO  TCO includes.
Personal System Administration CS5493. SA SA is a Systems Administrator The SA is responsible for maintaining the overall wellbeing of a computing system.
Design and implementation Chapter 7 – Lecture 1. Design and implementation Software design and implementation is the stage in the software engineering.
Survey Results Aaron Brown Billy Kakes Calvin Ling Professor David Patterson.
Component 4: Introduction to Information and Computer Science Unit 9/Part e: Components and Development of Large Scale Systems.
Learning Outcomes 1. Know software installation processes 2. Be able to prepare for software installation 3. Be able to install and configure software.
ADE Alessandro Raimondo (ICE/MTA) ICE workshop, 23 th April 2009.
Self-service enrollment for Windows desktops
(Professional Business Analyst Training organisation)
Towards continuous integration: Automated Oracle database testing with capture and replay Emil Pilecki.
Chapter 18 Maintaining Information Systems
EPICS/WinCC Control of the Vertical Cryostat K. Gajewski
IEEE Std 1074: Standard for Software Lifecycle
System Development Life Cycle (SDLC)
5.0 : Windows Operating System
Installation Plan Checklist
Looking For a Cloud Solution Provider? Things to Consider.
Maintaining software solutions
System Development Life Cycle (SDLC)
Introduction to Operating Systems
Description of Revision
The protection of the computing device has become the primary focus of the users. With the advancement in technology computer and its threats are also.
Software Development Process
Selling IIoT Solutions to Systems Integrators
System Development Life Cycle (SDLC)
Introduction to Computer Software
Chapter 7 –Implementation Issues
(System Development Life Cycle)
Internet Engineering Course
Improving Your Testing
{Project Name} Organizational Chart, Roles and Responsibilities
STATEL an easy way to transfer data
UpgradeX and CloudSuite
Presentation transcript:

Software modifications and reliability ARW2011

Software is a major part degrading reliability Software is major part able to improve reliability

Severals steps Collect data on software behaviours Sort, priorize data and convert in specifications Process of developpements Process of information before upgrading Process of integration, tests & installation Process post installation

questions Timing for update and upgrades ? How do you define the kind (and depth) of tests ? Management of softwares interfacing ? Do you have off-line platforms ? level of documentation ? Training of operators, backup solutions ? Good and bad stories ?

naming Patches, update, upgrades, renovation Software is: code ? O.S. ? Machine ? IT ? control ? Scada ? Middleware ? Developpers ? Testers ? Integrators ? Users ? Configuration managers ?