Global System Kick-off Meeting

Slides:



Advertisements
Similar presentations
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
Advertisements

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Report of HLRF KOM S. Fukuda. Project Management Structure Area: Main Linac Technology (to be completed) Regional/Intsitutional Effort: - Director-US:
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort Accelerator System Kick-off Meeting e- source SLAC Marc Ross.
ILC-EDR Kick-off Meeting Main Linac Integration Organization and Tasks Sept. 27, 2007 Akira Yamamoto ILC-EDR Kick-off Meeting, Main Linac Integration To.
Atlantic Innovation Fund Round VIII February 5, 2008.
ILC-EDR Kick-off Meeting Cavities Organization and Charges Sept. 19, 2007 Akira Yamamoto ILC-EDR Kick-off Meeting, Cavities Held at DESY, Sept ,
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Main Linac (SCRF) Technology Area Guidelines for the Meeting Akira Yamamoto Parallel Session ILC-GDE Meeting, Fermilab, Oct , 2007.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
Report of HLRF KOM/ALCPG07 S. Fukuda(KEK) R. Larsen(SLAC)
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
ACD Down-Select Criteria and Time Scales for HLRF ML-KOM FNAL September 27 、 2007 S. Fukuda, KEK & Ray Larsen, SLAC For the ILC HLRF Collaboration.
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Project Management PTM721S
Principal Investigator ESTCP Selection Meeting
Camera PDR/CD1 Planning 19 September 2008
SCRF WebEx Monthly Meeting Agenda and Reports from PM
Systems Analysis and Design in a Changing World, 4th Edition
Oct 22 Group Leaders Planning meeting
Meeting for S1-Global module design Cryomodule and Cryogenics
SCRF Monthly WebEx Meeting Sept. 22, 2010
EDR Planning, Cost Review and Technical Risk Analysis
Principal Investigator ESTCP Selection Meeting
Identify the Risk of Not Doing BA
ILC Project Management Status
ILC ‘Engineering Design’ (ED) Phase
Project Management Lifecycle Phases
Report on plan to produce an Engineering Design Report
ILC-EDR Kick-off Meeting, Cryomodule and Cryogenics
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Technical Design Report preparation
, A. Yamamoto SCRF WebEx Meeting.
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
CLIC/ILC Collaboration Meeting: Objectives & Organization
TSMO Program Plan Development
By Jeff Burklo, Director
Project Management Process Groups
The EDR phase Discussion Session
Employee engagement Delivery guide
Principal Investigator ESTCP Selection Meeting
Preliminary Project Execution Plan
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

Global System Kick-off Meeting CFS – AS 10 Sept 2007 KEK Marc Ross Global Design Effort

Engineering Design Activity: Builds on the: BCD – the baseline description (12.2005) RDR – contains the backbone of our design and the ‘value’ estimate (08.2007) The EDR: will have the next update for these, based on ‘value engineering’ and more in-depth understanding, and Will include a plan for project execution Including how to build the tunnels and high technology components 08.2010 Global Design Effort

Scope of ED Activity Resources provided (almost all) by participating institutions and their funding agencies (small ‘common fund’) Limitations known for the coming 3 years Project control over resources may increase during EDA Duration is known, Resources known, Scope is ? Decreased ED resources  increased risk Design and R & D prioritization based on ‘return for investment’ Also schedule “criticality” Global Design Effort

RDR Completion: Success of the GDE – a ‘grass-roots’ organization without a strong institutional center (opposite of CERN) Capitalize on this and Lay groundwork for a stronger – yet still de-centralized - ‘ILC Engineering Design Project’ Critical Mass Our community ‘votes with its feet’… given the structure and the opportunity to contribute to their labs future and the future of the science. Global Design Effort

Near-ness of ILC Is the ILC infinitely far off? How do we attract the technology/scientific community? What about Orbach’s Feb 2007 statement? By completing R & D and Design milestones Some formality needed to confront political process and bringing in strong new faces Akira Yamamoto, KEK; Jim Kerby, Fermilab; etc organizing and aligning intellectual, engineering resources in labs enabled through regional financing. Exciting technology  SRF-based accelerator projects XFEL; Fermilab Proton linac; ERL Global Design Effort

Path to Get Started on the EDR Plan: ED Activity is a ‘Project’ subject to accountability/transparency Deliverable is a documented strategy and plan Resources Common Fund Negotiation with regional/institutional managers Staffing Need engineering management Schedule Planning Milestones due: Fermilab 22.10.07 and Tohoku 03.03.08 Global Design Effort

Top Priority: Push the Technology AND Control the COST fundamental  containment of the current RDR Value estimate. potential cost-reduction via good engineering practices clearly identified in the RDR. Together with the risk-mitigating prioritized R&D program the focus of the EDR work. Global Design Effort

Industrialization Second focus: increasing direct involvement of industries Engineering development / cost saving through industrial partnerships Preparation for mass production is a critical issue for key technologies, understanding how individual countries can contribute in-kind This must be achieved on a truly worldwide basis, Intend to follow free-market including seeking out and developing potential (new) industrial bases MOD Global Design Effort

Our Community – global basis: The GDE is committed to these goals as a global project,  this is a major ILC strength building on the success of the RDR. We must also: ensure that internal momentum is maintained and foster continued growth in the enthusiasm and commitment of the international ILC community. grow the resources: funding; new institutions; universities Challenge  maintain effective communication paths between co-workers separated by great distances. ensure strong overlap between GDE/ED activities and priorities of the major institutions/stake-holders. Strength  diverse technical expertise wide ranging laboratory infrastructure (result of years of hard work and preparation.) Global Design Effort

Access to Resources Common Fund Support Regional Support Administrative Staff for Director and PM Cost & Schedule Regional Support Technical Management Staffing R & D Financial Resources The Regional Directors have an important role Authorize the plan They connect the ILC EDR Project to technical expertise Global Design Effort

Managing a non-centrally funded project: technical green indicates a commitment: institute will deliver MoUs facilitate connection: (see Shekar) Project Management (authority and responsibility) and institutions (funding and resources). The ‘C’  coordinating role in a WP Each WP has only one coordinator. Global Design Effort

Example Work Package Coordination  Area: Main Linac Technology (draft) Regional/Intsitutional Effort: - Director-US: Mike Harrison - Director-EU: B. Foster - Director-AS: M. Nozaki Technical Effort (MLT): - Project Manager: A. Yamamoto - Associate Managers:: T. Shidara , J. Kerby, * Group leader, ** Co-leader Regions Institutes Institute Leaders Cavity (Process) - L. Lilje* (Prod./Int.) H. Hayano* Cryomodule N. Ohuchi* H. Carter(tbc)** Cryogenics - T. Peterson* HLRF S. Fukuda* ML Integr. - C. Adolphsen* US Cornell Fermilab SLAC ANL TJNL H.Padamsee R. Kephart T. Raubenheimer C.Adolphsen H.Carter T.Peterson R.Larsen Adolphsen EU DESY CERN Saclay Orsay INFN Spain R.Brinkman J. Delahaye O. Napoly A.Variola C. Pagani Parma Tavian AS KEK Korea Inst. IHEP India Inst. K.Yokoya Noguchi Saito Hayano Ohuchi Fukuda Not all slots assigned – WP/ WP coordinators under consideration Global Design Effort

EDR Project and Technical Area Group Leaders Total 25 (!) Responsible for: Work Package definition & draft allocation Area baseline Organizing / drafting decision process Global Design Effort

CFS & Global Systems CFS has been identified as an RDR cost driver; and is expected to yield significant cost reduction through “value” engineering. It is complicated via site/regional dependencies, requiring delineation into global/generic engineering and site/region-specific engineering. Both categories of CFS work must be clearly identified in the final Work Breakdown Structure (WBS). Global Design Effort

Goals iteration of CFS requirements with accelerator designers/engineers (value engineering); Detailed evaluation of alternative solutions (e.g. shallow site); Preparation of critical information for specific site selection / development; Global Design Effort

Milestones CFS milestones support the development of sample sites in each region allowing a site selection directly following the completion of the ED Phase. Global Systems milestones support the development of cost / risk optimized designs. These milestones include: specific sample -site cost benefit and value -engineering analysis leading to an Accelerator System and CFS cost / risk optimum design development of an inter-regional schedule for sample -site preparation alternate site format design development preparation for the site selection process Global Design Effort

Value Engineering Value Engineering is the process whereby the total estimated cost of achieving an objective is compared with the lowest possible cost of achieving that objective. All affected and contributing technical subsystems will be represented in a multilateral discussion whereby each cost component must be justified by its impact on the objective. Requirements for commodities such as underground space, electrical power and water cooling capacity must be measured against technical system requirements such as vibration, temperature and thermal stability in terms of cost, cost risk and technical risk. System Engineering, whereby representatives from several Technical Area Groups are involved in optimizing the design of a given subsystem, is to be coordinated through the System Integration group of the Project Management Office. This group will participate in the Project Review Meetings where the group will develop a prioritized approach to optimize high-interference regions which go across defined system area boundaries or have complex interfaces. Global Design Effort

Planning Phase (July 07 - March 08) Milestones Project Management Team releases all necessary project guidance, tools, and organizational information to Technical Area Group Leaders . Technical Area Group Leaders provide WBS dictionary, preliminary list of work packages, and preliminary list of issues, decision points, and resource requirements. Interim Deliverables (Oct 07) Engineering Design Project Management Plan version 1 WBS template and guidance document for Technical Area Group Leaders Change control template and guidance document for Technical Area Group Leaders Deliverable (March 08) ED Project WBS dictionary for Levels 1-3 Preliminary outline of Engineering Design Report Preliminary list of final deliverables for the Engineering Design phase Preliminary resource plan Prioritized list of issues and decision points to be addressed during ED Phase Global Design Effort

CFS – AS Kick-off Meeting 3 CFS EDR Kick Off meetings. Each one has a focus on regional issues, issues special to the group - special experience or institutional expertise, and carry over from previous meetings or discussions. At the Fermilab GDE meeting there will be a 1 hour CFS closing plenary presentation. summaries of the kick off meetings and a plan for the Edr. an outline of needed criteria and who is responsible for providing it by when. Global Design Effort

CFS – AS Kick-off Meeting The presentation should also include plans for (the) key CFS deliverables: 1) an integrated inter-regional plan - with schedules for regional and global activities, 2) plans for specific value engineering exercises – to be highlighted in the PM presentation, 3) strategic discussion of a model site selection process and 4) a plan for the development and publication of a alternate site format design. Global Design Effort

CFS – AS Kick-off Meeting “an integrated inter-regional plan - with schedules for regional and global activities” This is a specific KEK deliverable for the Asian regional sample site (proposal) Carry-over topic: Water cooling system for klystron (special appointment) Global Design Effort

Global Design Effort

Global Design Effort